Loading...
HomeMy WebLinkAbout2008-075, Cr " h - 7� 1,5 BRIDGE REPLACEMENTS AND WIDENING OF 66"' AVENUE FROM SOUTH OF SR 60 TO 59TH STREET PROFESSIONAL CIVIL ENGINEERING, GEOTECHNICAL ENGINEERING AND LAND SURVEYING SERVICES AMENDMENT NO, 4 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING SERVICES AGREEMENT BETWEEN ARCADIS AND INDIAN RIVER COUNTY, FLORIDA, This is an amendment to the existing Engineering/Land Surveying Services Agreement (AGREEMENT) dated September 6, 2005 between ARCADIS (ENGINEER) and Indian River County (COUNTY). This amendment addresses changes in "Section I — Project Limits and Description", "Section III - Scope of Services", and "Section V - Compensation". Amendment Description This Amendment includes the following: "SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate the following: Consultant services are required for the preparation of construction plans and permit applications for design of improvements to 66`h Avenue from South of SR 60 to 33`d Street. The scope of services included in this amendment consist of: Traffic Signal Plans Traffic signal plans will be prepared for the intersection of SR 60 and 66`h Avenue. The traffic signal plans will detail the construction of a mast arm traffic signal at the intersection. The mast arms will be located at the ultimate intersection configuration. Construction Plans — South of SR 60 to 33 Id Street Indian River Con desires to expedite the construction of the section of 66`h Avenue from south of SR 60 to 33 Street. ARCADIS will prepare a separate set of stand alone plans for construction of the section of 66`h Avenue from south of SR 60 to south of 33`d Street. The plans will include a transition for the proposed 4 -lane divided roadway section to match the existing 2 - lane roadway section south of 33`d Street. "SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: E. The Roadway set of plans shall consist of the following: Page l of 5 G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2008\66 th Ave Amendment No 4- 2-12-08.doc Page 2 of 5 G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2008\66 th Ave Amendment No 4- 2-12-08.doc 30% 60% 90% 100% Cover Sheet X X Typical Sections X X Summary of Quantities and General Notes X X Summary of Drainage Structures Sheets X X Details X X Plan and Profile Sheets (40 scale) X X Cross Sections at 100 ft interval X X Landscape Plans X X Signage & Pavement Marking Plans (100 scale) X X Signalization Plans X X Bridge Plans X X Intersection Plan & Details X X Drainage Maps X X Stormwater Pollution Prevention Plans (SWPPP) X X Computation Book X Construction Cost Estimate and Quantities X X Water Main Plans X X Page 2 of 5 G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2008\66 th Ave Amendment No 4- 2-12-08.doc "SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following The time for completion of the 90% design drawings, permit applications, and Engineer's Opinion of Probable Construction Cost for the project shall be three (3) months from the date of execution of ADDENDUM No. 4. Once permits are received, 100% design drawings shall be completed 30 days thereafter. "SECTION V — COMPENSATION" is being modified to incorporate the following: The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this Agreement fees in accordance with the following: A. Professional Services Fee The basic compensation mutually agreed upon by the ENGINEER and the COUNTY follows: The following is a summary of costs: Charge Associated with Change in Project Scope And Proiect Limits GeotechnicalServices (Tierra)...................................................... $0.00 Engineering (ARCADIS)....................................................... $169445.00 Signal Plans(ARCADIS)....................................................... $16,720.00 Design Survey (66"`Avenue) (ARCADIS)........................................$0.00 Design Survey (Sidestreets)(ARCADIS).......................................... $0.00 New Total Compensation $130,010.00 $7779145.00 $65,169.00 $1699500.00 $71,428.00 Right -of -Way Survey and Map (6e Avenue) .................................. $0.00 $117,821.00 Right-of-way Survey(Sidestreets).....................................................$0.00 $61,963.00 Structural Design for 4 bridges (Bridge Design Associates, Inc.) ....................................................... $0.00 $207,222.00 Landscape& Irrigation.....................................................................$0.00 $37,000.00 (Thomas Lucido & Associates) PondSurveys .............................01.111.....................................................0.00 $20,000.00 Page 3 of 5 G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2008\66 th Ave Amendment No 4- 2-12-08.doc Water Main Plans ARCADIS)...................................................... $0.00 $519000,00 (Lump Sum) Corridor Study (ARCADIS) $0.00 $15,581.00 TOTAL PROFESSIONAL SERVICES ................................. $339165.00 HOURLY RATE ALLOWANCES Allowance for Sketch and Legal Descriptions and staking of parcels(375 00leach) ................. NTE $0.00 Allowance for Survey Crew and Soft Dig Machine far Horizontal and Vertical Utility Locations at Potential Conflicts (Survey $112/Hr)...................................................................... NTE $0.00 Allowance for Survey and Design Of a transition to match the existing pavement Atthe north end of the project ................................................ NTE $0.00 TOTAL HOURLYRATEALLOWANCES ........................... NTE $0.00 $1,7231839.00 $61,000.00 $20,000.00 $12,000.00 $93,000.00 Page 4 of 5 G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2008\66 th Ave Amendment No 4- 2-12-08.doc The AGREEMENT is hereby amended as specifically set forth here in. All other sections of the AGREEMENT shall remain in full force and effect and are incorporated herein. This Amendment No. 4 to the AGREEMENT regardless of where executed, shall be governed by and constructed by the laws of the State of Florida. In witness whereof the parties have executed this Amendment this ARCADIS G & M, INC. FLORIDA 201 Vista Parkway West Palm Beach, 1.. 33411 Henry W. Deibel, Jr., P.E. Sandra L. Bowden, Chairman Associate Vice President Board of County Commissioners WITNESSED BY: 4th day of March 2008. INDIAN RIVER COUNTY, &L -41W (''County Attorney Approved as to Form and Legal Sufficiency n�' A., -A eph A. tBaird, ounty Administrator Approved by BCC March 4, 2008 Attest: Jeffrey K. Barton, Clerk of Circuit Court By: ccs. Deputy Clerk Page 5 of 5 G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2008\66 th Ave Amendment No 4- 2-12-08.doc