Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2009-056
33s0l 9 4s. IMPROVEMENT OF THE INTERSECTION OF SR 60 & 43RD A 0 o p'_ � , VENUE PROFESSIONAL CIVIL ENGINEERING & STRUCTURAL ENGINEERING SERVICES AMENDMENT NO, 3 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING SERVICES AGREEMENT BETWEEN ARCADIS G & M, Inc. AND INDIAN RIVER COUNTY , FLORIDA. This is an amendment to the existing Engineering Services Agreement (AGREEMENT) dated September 6, 2005 between ARCADIS G&M , Inc . (ENGINEER) and Indian River County (COUNTY) . This amendment addresses changes in " Section I — Project Limits and Description", " Section III - Scope of Services " , and " Section V - Compensation " . Amendment Description This Amendment includes the following : " SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate the following : Consultant services are required for the modification of road design plans ; bridge plans ; permit applications and utility relocations associated with the construction of SR 60 / 43rd Avenue Intersection Improvements . Storm water quality treatment and attenuation are required along 43rd Avenue . In order to provide for this treatment, a dry storm water detention area is proposed to be constructed on 44th Avenue south of 19th Street . Engineer will perform a field survey along 19th Street from 43rd Avenue to 44th Avenue , and along 44th Avenue from the detention area site to SR 60 . The field survey will consist of a location and topographic survey of the roadways . All above ground physical features will be located . Cross sectional information will be obtained at l 00- foot intervals for use in the design of the project . The location and elevation of all existing storm drainage pipes , inlets and manholes will be obtained. Plans will be prepared for the dry detention area and the inlet and outfall piping . The inlet piping will extend from 43 `d Avenue to the detention area site . The outfall piping will extend from the dry detention area to SR 60 . The plan modifications will consist of plan and profile sheets, cross sections , and details . Permit applications will be submitted to the St . Johns River Water Management District and the Indian River Farms Water Control District . Modifications have been made to the alignment of 43rd Avenue north of SR 60 to reduce the impact to the adjacent properties . ARCADIS will modify the right of way maps and sketcah and legal descriptions to reflect these plan modifications . " SECTION III — SCOPE OF SERVICES " is being modified to incorporate the following : Page I of 5 G : \ LNR Support\ADMIN\Marketing\ Proposals\ WPB\2009\SR60 - 43RD AVE AMENDMENT 3 1 - 19-09 . doc 30% and 60% plans have been submitted to the County . Engineer will prepare 90% , and 100% plans . The plan modifications will consist of the following : • Modifications to the storm water drainage system to incorporate piping of the roadway runoff to the proposed detention area on 44th Avenue . • The preparation of construction plans for piping from 43 �d Avenue to the detention area site , and from the detention area site to connect to the existing piping system at SR 60 . • The preparation of construction plans for the pond site . • Obtaining seven (7) SPT soil test borings of the roadway and detention area site . E . The Roadway set of plans shall consist of the following : 30 % 60 % 90 % 100 % Cover Sheet X X Typical Sections X X Summary of Quantities and General Notes X X Summary of Drainage Structures Sheets X X Details X X Plan and Profile Sheets (40 scale) X X Cross Sections at 100 ft interval X X Landscape Plans X X Signage & Pavement Marking Plans ( 100 scale) X X Signalization Plans X X Bridge Plans X X Intersection Plan & Details X X Drainage Maps X X NPDES Plans X X Stormwater Pollution Prevention Plans ( SWPPP) X X Computation Book X Construction Cost Estimate and Quantities X X " SECTION IV - TIME FOR COMPLETION " is being modified to incorporate the following : Page 2 of 5 G : ALNR Support\ADMIN \Marketing\Proposals\WPB\2009\SR60 - 43RD AVE AMENDMENT 3 1 - 19-09 . doc The time for completion of the 90% design drawings , permit applications , and Engineer' s Opinion of Probable Construction Cost for the project shall be three (3 ) months from the date of execution of this ADDENDUM . Once permits are received, 100% design drawings shall be completed 90 days thereafter. " SECTION V — COMPENSATION" is being modified to incorporate the following : The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this Agreement fees in accordance with the following : A . Professional Services Fee 1 . The basic compensation mutually agreed upon by the ENGINEER and the COUNTY follows : The following is a summary of costs: Charge Associated with New Total This Amendment Compensation Roadway Design Geotechnical Services (Tierra) . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $3, 055. 00 $309040. 00 Engineering . . . . . . . . . . . . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . $26, 737. 08 $2419804. 53 (ARCADIS) Signal Plans. , . . . . . . . . . . . . 696466866066 0666060 $0. 00 $259000. 00 (ARCADIS) Stormwater Pollution Prevention Plans . ... . . . . . . . . . . . . . . . . . . .. . . . . . . . .. . $2, 022. 92 $9, 022. 92 (ARCADIS) Permitting . . . . . 66600666 @see 666 * 640 * 0006 000004000000 $0. 00 $179910. 00 (ARCADIS) Surveying Design Survey (Detention Pond). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . $4, 986. 80 $539632. 80 (ARCADIS) Right of Way Survey and Map . . . . . . . . . . . o m oeeeeeeeeess noses $39406. 40 $20,386. 40 (ARCADIS) Structural Design Page 3 of 5 G : \LNR Support\ADMIN\ Marketing\ Proposals\WPB\2009\SR60 - 43RD AVE AMENDMENT 3 1 - 19 -09 . doc Structural Design for SR 60 over Main Relief Canal bridge . . . . . . ......... . . . ... . . . . . . . . . . .. . . . .. . . .. . . . . . . . . . . .. . . . .. . ...... $0. 00 $ 761060. 00 (Bridge Design Associates, Inc.) Structural Design for 43"d Avenue over Main Relief Canal bridge . . . . .. . .. . .. ... . . . . . . . .. . . .. . .. .. .. .. . . . . . . . . . . . . . . . . .. ... . .. . . . . $0. 00 $58,380. 00 (Bridge Design Associates, Inc.) Landscape & Lighting Plans Landscape Architectural Services . . . . . . . .. . . . . . . . . . .. . .. . . . . . .. . . . . . . . . . . . . . . . . . . . $ 0. 00 $27, 486. 00 (Roy-Fisher Associates, Inc.) LightingPlans. . . . . . . . . . . . . . . .. . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $0. 00 $293o 085. 00 (Techno Engineering) Public Involvement Public Workshop Meeting . . . . . . . . . . .. .. . . . . .. . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $0. 00 $6, 180. 00 Contamination Screening Evaluation Report . . . so 000600800006 60 seems 00 a $0. 00 $9, 750. 00 TOTAL L UMP SUM FEE . . . . . . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. $40, 208. 20 $604, 737. 65 ALLOWANCES Sketch and Legal Descriptions . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. . . . $ 0. 00 $509000. 00 (ARCADIS) Soft Dig for Utility Locations .. . . . . . . . . . . . . .. . . . . . . . .. . . . . . . . . . . . . .. .. . . . . . .. . . .. . .. . $0. 00 $20, 000900 Appraisal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . $ 0. 00 $121 , 500. 00 (Callaway & Price) (For 27 parcels) LandPlanner . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . .. . . . . . . . . . .. . . .. . . .. . . . . . . . . . . . . . . . .. .. . . . . . . . . . $0. 00 $20, 000. 00 (Moyle, Flanigan, Katz, Raymond & Sheehan) (Hourly not to exceed at $175. 00/hour) Market Analysis . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . .. . . . . .. . . . . . . . . . .. .. . . . . . . . . . . . . . .. .. .. .. .. . . . $0. 00 $20, 000. 00 (Realmark Research) (Hourly not to exceed at $110. 00/7iour) Eminent Domain Business Damage Assessment . . . . . . . . . . . . . . . . . . . . . . . . . $0. 00 $409000. 00 (Gerson, Preston,Robinson & Company) (Hourly not to exceed at $165. 00/hour for Principal, $125. 00/hour for Manager, and $90. 00/hour for Stafj) Page 4 of 5 G : \LNR Support\ADMIN \ Marketing\Proposals\WPB\2009\SR60 - 43RD AVE AMENDMENT 3 1 - 19 -09 . doc CurePlans. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $0. 00 $56, 000. 00 (ARCADIS) (Allowance for 14 parcels at $4, 000. 00 per parcel Landscape plans for Cure Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $0. 00 $169800. 00 (Roy-Fisher) (Allowance for 14 parcels @ $1 , 200. 00 per parcel) TOTALALLOWANCES . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $0. 00 $3449300. 00 The AGREEMENT is hereby amended as specifically set forth here in . All other sections of the AGREEMENT shall remain in full force and effect and are incorporated herein . This Amendment No . 3 to the AGREEMENT regardless of where executed , shall be governed by and constructed by the laws of the State of Florida. In witness whereof the parties have executed this Amendment this 3RD day of March , 2009 . ARCADIS G & M , INC . INDIAN RIVER COUNTY , FLORIDA 2081 Vista Parkway West Palm Beach, Fl . 33411 By : / _ By : Henry W . Deibel , Jr, P . E . Wesley S . Davis , Chairman Board of County Commissioners WITNESSED BY : Approved by BCC March 3 , 2009 Attest : Jeffrey K . Barton, Clerk of Circuit Court �o r~ By : County Attorney Deputy erk Approved as to Form and Legal Sufficiency I , r seph A . Baird , ounty Administrator Page 5 of 5 G : \LNR Support\ADMIN \Marketing\ Proposals\ WPB\2009\SR60 - 43RD AVE AMENDMENT 3 1 - 19 -09 . doc