HomeMy WebLinkAbout2008-395 ca-
Board of County Commissioners
180127th Street
Vero Beach, Florida 32960
Telephone : (772) 567=8000
FAX : (772) 778-9391
20TH AVENUE SW - 25TH STREET TO 21ST STREET SW
AMENDMENT NO , 1
TO THE
PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT
WITH
ARCADIS U . S. , INC .
This Amendment No. 1 to the Professional Civil Engineering Services Agreement with
Arcadis U . S . , Inc . is in accordance with the existing AGREEMENT dated December 13 , 2005
and the extension thereof, between Arcadis U . S . , Inc . ( ENGINEER) and Indian River County
(COUNTY) .
This Amendment No . 1 amends the agreement as follows :
SECTION I — PROJECT LIMITS
Consultant services are required for the preparation of plans for the design of 20th Avenue from
25th Street SW to 21 gt Street SW.
SECTION II — SCOPE OF SERVICES
The scope of services for this Amendment No . 1 is to perform the following tasks as requested
by the County :
1 . Preparation of plans for the construction of a stormwater drainage pond on the Falcon
Trace site
2 . Preparation of stormwater drainage calculations to determine the required pond size ,
water surface elevations , and water quality treatment and permanent pool size
requirements .
3 . Meeting with the St . Johns River Water Management District (SJRWMD) to confirm the
permit requirements for the project .
4 . Preparation and submission of permit application packages to the SJRWMD and the
Indian River Farm Water Control District .
SECTION III = TIME FOR COMPLETION
Supplemental tasks shall be completed within 30 business days from the date of execution
of this Amendment No . 1 to the Professional Civil Engineering Services Agreement with
Arcadis U . S . , Inc . .
CADocuments and Settings\hdeibel\Local Settings\Temporary Internet Files\Content.Outlook\41 YHPOTT\Amendment No 1 Arcadis 11 - 17-08
(2) . doc
PAGE TWO
Amendment No . 1 Arcadis U . S . , Inc .
For December 2 , 2008 BCC Meeting
SECTION V - COMPENSATION
The COUNTY agrees to pay , and the ENGINEER agrees to accept , a fee for services
rendered according to the Scope of Services" and further identified in all the Sections of
this Amendment No . 1 , a Lump Sum of $ 14344 . 56 .
All invoicing and payments shall be in accordance with the original Professional Civil
Engineering Services Agreement with the COUNTY and as stated hereon . Invoices shall
include the work order and project number , invoice number related to this work order ,
original contract amount , current billing amount and retainage amounts .
The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of
the AGREEMENT shall remain in full force and effect , and are incorporated herein .
OWNER ARCADIS U . S . , INC .
BOARD OF COUNTY COMMISSIONERS
INDIAN RIWR COUNTY, FLORIDA
Signature) : (Signature) yyj vj
q ' Y� 4',
4
If
� � w
(Printe11 d name and titfe) (Printed name and title)
Approved, by ' BGC December 2 , 2008
ATTEST :
Mary Louise Scheidt, Clerk, Ad Interim Witnessed . (A IS , Inc)
Deputy Clerk (Printed name)
Ap r vekasFor C1 ,
ency :William CrUNTY Attorney seph A Baird , COU
C'
A rn istrator
CA\Documents and SettingsWeibel\Local Settings\Temporary Intemet Files\Content. Outlook\41YHPOTT\Amendment No 1 Arcadis l l - 17-08
(2).doc
ARCADIS
Infrastructure, environment, facilities ARCADIS2081 Vista Parkway
West Palm Beach
Florida 33411
Mr. Chris Kafer, P . E . - Tel 561 .697. 7000
f t i Fax 561 .697. 7751
Indian River County
1801 27th Street www.arcadismus.com
Building A OCT 2 � 2 � � 8
Vero Beach , FI 32960-3388
Subject: Transportation
20th Avenue SW -
ILI
25th Street SW to 21 st Street SW
Date:
Dear Mr. Kafer: October 16 , 2008
Contact:
We are pleased to submit this proposal for professional engineering services for the Henry Deibel
design of 20th Avenue SW from 25th Street SW to 21 st Street SW . The scope of
work included in this proposal will consist of the following : Phone:
( 561 ) 697-7075
• Preparation of plans for the construction of a storm water drainage pond on Email:
the Falcon Trace site . The plans will include the design of a pipe system from Hank . dei bel @arcad is-
20th Avenue SW to the pond site, pond plans , sections , and details . The us . com
proposed pond will be located within the footprint of Lake #3 as shown on
the plans for Falcon Trace . A ditch will be designed from lake # 3 to the Our ref:
existing outfall at the site . If required by the SJRWMD , ARCADIS will design
a new temporary outfall structure for lake #3 . Florida License Numbers
• Preparation of storm water drainage calculations to determine the required Engineering
pond size, water surface elevations , and water quality treatment and EB00007917
permanent pool size requirements . Geology
GB564
• Meeting with the St. Johns River Water Management District to confirm the Landscape Architecture
permit requirements for the project. LC26000269
Surveying
LB7062
• Preparation and submission of permit application packages to the St. johns
River Water Management District and the Indian River Farms Water
Management District.
Compensation for these services will be a lump sum amount of $$ 14 , 944 . 56 . The
attached sheets provide a breakdown of our fees for this work .
Imagine the result
g:\Inrsupport\admin\marketing\proposals\wpb\2008\20th avenue sw 10-16-08.doc
ARCADIS Mr. Chris Kafer, P . E .
October 16 , 2008
Please feel free to contact our office if you have any questions or require any
additional information .
Sincerely,
ARCAD
Henry W . Deibel , Jr. , P . E .
Associate Vice President
Copies:
Page:
G:ILNRSupporMOMIMMarkeung\Prop Is1WP812008120th Avenue SW 10-16-06.doc 2/2
ARCADIS
ESTIMATE OF WORK EFFORT FOR ENGINEERING
20TH AVENUE SW
25Th STREET SW TO 21st STREET SW
INDIAN RIVER COUNTY
Total Contract Cost Computations $ 5 , 146 . 20
Total Activity Salary Costs
(a) Overhead Additives:
(a1 ) Combined OH Percent 164. 00%
(a2 ) Combined OH Cost $ 81439.77
Subtotal (Salary + Overhead ) $ 13,585.97
(b) Operating Margin Percent 10 . 00%
(b) Operating Margin Cost $ 19358 .60
Subtotal ( Salary Related Cost) $ 14, 944. 56
Subtotal (Cost Elements of Basic Activities) $ 149944.56
Subcontract items (L. S . )
Subtotal (Basic Services) $ 14,944.56
S -
LUMP SUM = '
20th Aveneu SW ( IRC) 10-16-08.xls
ARCADIS
ESTIMATE OF WORK EFFORT FOR ENGINEERING
20th AVENUE SW
25TH STREET SW TO 21ST STREET SW
INDIAN RIVER COUNTY
PROJECT MANAGER PROJECT ENGINEER SR . CADD OPERATOR 744.0
MAN HOURLY MAN HOURLY MAN HOURLY
H R RATE HOURS RATE HOURS RATE DESIGN ANALYSIS - $ 54 .80 - $ 38 . 50 $
18 .00
DRAINAGE ANALYSIS 12.0 $ 54.80 32.0 $ 38.50 - $ 18 .00
ROADWAY PLANS 6.0 $ 54.80 32 .0 $ 38.50 46.0 $ 18.00 84 .0
UTILITIES $ 54 .80 - $ 38.50 $ 18.00
PERMITTING 6.0 $ 54 .80 14.0 $ 38.50 $ 18.00 20 .0
SIGNING & PAVEMENT
MARKING PLANS $ 54.80 - $ 38 .50 $ 18 .00
TOTALS 1 24.0 78 .0 1 46 .0 148 .0
DESIGN ANALYSIS $ - $ $ -
DRAINAGE ANALYSIS $ 657.60 $ 19232.00 $
ROADWAY PLANS $ 328.80 $ 11232 .00 $ 828.00
UTILITIES $ - $ $
PERMITTING $ 328.80 $ 539.00 $
MARKING PLANS $ - $ $ -
TOTALS $ 1 ,315 .20 $ 3 ,003 .00 $ 828 .00 $ 5, 146.20
BY COST FOR HOURLY
ACTIVITY ACTIVITY RATE
DESIGN ANALYSIS $
DRAINAGE ANALYSIS 44.0 $ 1 ,889 .60
ROADWAY PLANS 84 .0 $ 21388.80 28 .44
UTILITIES $ -
PERMITTING 20.0 $ 867 .80
SIGNING & PAVEMENT
MARKING PLANS $ #DIV/0!
TOTALS 148 .0 1 $ 5 , 146. 20 S34. 77 Average per hour
20th Aveneu SW (IRC) 10-16-08.xis
20th AVENUE SW
25TH STREET SW TO 21ST STREET SW
HIGHWAY PAGE 1 OF
HIGHWAY TASK LIST
ACTIVITY : A. ROADWAY PLANS PACKAGE SUBACTIVITY: 2 - DRAINAGE DESIGN & ANALYSIS
BASIS OF NO . OF NO . OF TOTAL PROJECT PROJECT
TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS
1 . Design of Cross Drains Ea . 0
2. Drainage Maps Sheet 0
3. Design of Outfall Ditches Ea . 0
4. Interchange Drainage Design Ea . 0
5. Design of Storm Sewers Ea. 0
6. Design of Stormwater Retention / Detention Fac. Ea . 1 24 24 4.0 16.0
7. Design of Special Drainage Systems L .S. 2 0
8. Preparation of Bridge Hydraulics Report Ea. 0
9. Drainage Design Report L .S . 1 16 16 2 .0 14.0
10 Investigate Outfall Requirements L .S. 0
11 Pond Siting Report L.S . 0
SUBTOTAL THIS SHEETI 40 6 30 0
20th Aveneu SW ( IRC) 10-16-08 .xis
20th AVENUE SW
25TH STREET SW TO 21ST STREET SW
HIGHWAY PAGE 2 OF 4
HIGHWAY TASK LIST
ACTIVITY : A. ROADWAY PLANS PACKAGE SUBACTIVITY: 2 - DRAINAGE DESIGN & ANALYSIS
BASIS OF NO . OF NO. OF TOTAL PROJECT PROJECT
TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS
10. Quality Control 0% 0
11 . Supervision 0% 0
12. Field Reviews Ea. 0
13. Progress Meetings ( IRC) Ea. 2 2 4 4.0
14 Progress Meetings (GL Homes) Ea. 2 2 4 2 .0 2 .0
SUBTOTAL THIS SHEET a 6 2 0
TOTAL 1 48 1 12 32 0
20th Aveneu SW ( IRC) 10-16-08 .xis
20th AVENUE SW
25TH STREET SW TO 21ST STREET SW
HIGHWAY PAGE 3 OF 4
HIGHWAY TASK LIST
ACTIVITY: A. ROADWAY PLANS PACKAGE SUBACTIVITY : 3 - ROADWAY PLANS
BASIS OF NO . OF NO . OF TOTAL PROJECT PROJECT
TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS
1 . Key Map Sheet 0
2 . Typical Section & Notes Sheet 2 0
3. Summary of Quantities Each 1 8 1 8 4.0 4.0
4. Plan sheets Sheet 3 8 3 24 2.0 6 .0 16 .0
5. Profiles Sheet 0
6. Stormwater Pollution Prevention Plans Sheet 1 12 12 4.0 8.0
7. Sidestreet Profiles Sheet 0
8. Drainage Structure Sheets Sheet 0
9. Miscellaneous Construction Details L.S . 2 8 2 16 2 .0 6 .0 8. 0
10. Summary of Drainage Structures Sheet 6 0
11 . Cross-Sections Ea. 10 2 20 2 .0 8.0 10.0 pond and ditch
12 . Baseline Control Sheet 0
13 Cost Estimates Each 1 4 4 4.0
SUBTOTAL THIS SHEET 84 6 32 46
20th Aveneu SW (IRC) 10-16-08.x15
20th AVENUE SW
25TH STREET SW TO 21 ST STREET SW
HIGHWAY PAGE 4 OF 4
HIGHWAY TASK LIST
ACTIVITY: A. ROADWAY PLANS PACKAGE SUBACTIVITY: 5 - ENV. SERVICES / PERMITS
BASIS OF NO . OF NO . OF TOTAL PROJECT PROJECT
TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS
1 . Preliminary Field Review L.S . 0
2 . Agency Coordination ( Includes all Phases) L.S . 1 8 8 4.0 4.0
3 . Establish Wetland Jurisdictional Lines L .S. 0
4. Agency Field Review L.S . 0
Prepare Wetland Resouce / Dredge & Fill Permit
5. Application L.S . 1 8 8 2 .0 6.0
Prepare Stormwater Mgmt. & Surface Water Permit
6. Application (MSSW ) L.S . 1 2 2 2 .0
7. Prepare Coast Guard Navigation Permit Application L . S. 0
8. Prepare FDOT Permit Application L .S . 0
9. Prepare IRFWCD Drainage Permit Application L.S . 1 2 2 2 .0
10. L.S . 0
11 Miti ation Coordination and Meetings L.S. 0
SUBTOTAL THIS SHEET 20 6 14 0