Loading...
HomeMy WebLinkAbout2008-395 ca- Board of County Commissioners 180127th Street Vero Beach, Florida 32960 Telephone : (772) 567=8000 FAX : (772) 778-9391 20TH AVENUE SW - 25TH STREET TO 21ST STREET SW AMENDMENT NO , 1 TO THE PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT WITH ARCADIS U . S. , INC . This Amendment No. 1 to the Professional Civil Engineering Services Agreement with Arcadis U . S . , Inc . is in accordance with the existing AGREEMENT dated December 13 , 2005 and the extension thereof, between Arcadis U . S . , Inc . ( ENGINEER) and Indian River County (COUNTY) . This Amendment No . 1 amends the agreement as follows : SECTION I — PROJECT LIMITS Consultant services are required for the preparation of plans for the design of 20th Avenue from 25th Street SW to 21 gt Street SW. SECTION II — SCOPE OF SERVICES The scope of services for this Amendment No . 1 is to perform the following tasks as requested by the County : 1 . Preparation of plans for the construction of a stormwater drainage pond on the Falcon Trace site 2 . Preparation of stormwater drainage calculations to determine the required pond size , water surface elevations , and water quality treatment and permanent pool size requirements . 3 . Meeting with the St . Johns River Water Management District (SJRWMD) to confirm the permit requirements for the project . 4 . Preparation and submission of permit application packages to the SJRWMD and the Indian River Farm Water Control District . SECTION III = TIME FOR COMPLETION Supplemental tasks shall be completed within 30 business days from the date of execution of this Amendment No . 1 to the Professional Civil Engineering Services Agreement with Arcadis U . S . , Inc . . CADocuments and Settings\hdeibel\Local Settings\Temporary Internet Files\Content.Outlook\41 YHPOTT\Amendment No 1 Arcadis 11 - 17-08 (2) . doc PAGE TWO Amendment No . 1 Arcadis U . S . , Inc . For December 2 , 2008 BCC Meeting SECTION V - COMPENSATION The COUNTY agrees to pay , and the ENGINEER agrees to accept , a fee for services rendered according to the Scope of Services" and further identified in all the Sections of this Amendment No . 1 , a Lump Sum of $ 14344 . 56 . All invoicing and payments shall be in accordance with the original Professional Civil Engineering Services Agreement with the COUNTY and as stated hereon . Invoices shall include the work order and project number , invoice number related to this work order , original contract amount , current billing amount and retainage amounts . The AGREEMENT is hereby amended as specifically set forth herein . All remaining sections of the AGREEMENT shall remain in full force and effect , and are incorporated herein . OWNER ARCADIS U . S . , INC . BOARD OF COUNTY COMMISSIONERS INDIAN RIWR COUNTY, FLORIDA Signature) : (Signature) yyj vj q ' Y� 4', 4 If � � w (Printe11 d name and titfe) (Printed name and title) Approved, by ' BGC December 2 , 2008 ATTEST : Mary Louise Scheidt, Clerk, Ad Interim Witnessed . (A IS , Inc) Deputy Clerk (Printed name) Ap r vekasFor C1 , ency :William CrUNTY Attorney seph A Baird , COU C' A rn istrator CA\Documents and SettingsWeibel\Local Settings\Temporary Intemet Files\Content. Outlook\41YHPOTT\Amendment No 1 Arcadis l l - 17-08 (2).doc ARCADIS Infrastructure, environment, facilities ARCADIS2081 Vista Parkway West Palm Beach Florida 33411 Mr. Chris Kafer, P . E . - Tel 561 .697. 7000 f t i Fax 561 .697. 7751 Indian River County 1801 27th Street www.arcadismus.com Building A OCT 2 � 2 � � 8 Vero Beach , FI 32960-3388 Subject: Transportation 20th Avenue SW - ILI 25th Street SW to 21 st Street SW Date: Dear Mr. Kafer: October 16 , 2008 Contact: We are pleased to submit this proposal for professional engineering services for the Henry Deibel design of 20th Avenue SW from 25th Street SW to 21 st Street SW . The scope of work included in this proposal will consist of the following : Phone: ( 561 ) 697-7075 • Preparation of plans for the construction of a storm water drainage pond on Email: the Falcon Trace site . The plans will include the design of a pipe system from Hank . dei bel @arcad is- 20th Avenue SW to the pond site, pond plans , sections , and details . The us . com proposed pond will be located within the footprint of Lake #3 as shown on the plans for Falcon Trace . A ditch will be designed from lake # 3 to the Our ref: existing outfall at the site . If required by the SJRWMD , ARCADIS will design a new temporary outfall structure for lake #3 . Florida License Numbers • Preparation of storm water drainage calculations to determine the required Engineering pond size, water surface elevations , and water quality treatment and EB00007917 permanent pool size requirements . Geology GB564 • Meeting with the St. Johns River Water Management District to confirm the Landscape Architecture permit requirements for the project. LC26000269 Surveying LB7062 • Preparation and submission of permit application packages to the St. johns River Water Management District and the Indian River Farms Water Management District. Compensation for these services will be a lump sum amount of $$ 14 , 944 . 56 . The attached sheets provide a breakdown of our fees for this work . Imagine the result g:\Inrsupport\admin\marketing\proposals\wpb\2008\20th avenue sw 10-16-08.doc ARCADIS Mr. Chris Kafer, P . E . October 16 , 2008 Please feel free to contact our office if you have any questions or require any additional information . Sincerely, ARCAD Henry W . Deibel , Jr. , P . E . Associate Vice President Copies: Page: G:ILNRSupporMOMIMMarkeung\Prop Is1WP812008120th Avenue SW 10-16-06.doc 2/2 ARCADIS ESTIMATE OF WORK EFFORT FOR ENGINEERING 20TH AVENUE SW 25Th STREET SW TO 21st STREET SW INDIAN RIVER COUNTY Total Contract Cost Computations $ 5 , 146 . 20 Total Activity Salary Costs (a) Overhead Additives: (a1 ) Combined OH Percent 164. 00% (a2 ) Combined OH Cost $ 81439.77 Subtotal (Salary + Overhead ) $ 13,585.97 (b) Operating Margin Percent 10 . 00% (b) Operating Margin Cost $ 19358 .60 Subtotal ( Salary Related Cost) $ 14, 944. 56 Subtotal (Cost Elements of Basic Activities) $ 149944.56 Subcontract items (L. S . ) Subtotal (Basic Services) $ 14,944.56 S - LUMP SUM = ' 20th Aveneu SW ( IRC) 10-16-08.xls ARCADIS ESTIMATE OF WORK EFFORT FOR ENGINEERING 20th AVENUE SW 25TH STREET SW TO 21ST STREET SW INDIAN RIVER COUNTY PROJECT MANAGER PROJECT ENGINEER SR . CADD OPERATOR 744.0 MAN HOURLY MAN HOURLY MAN HOURLY H R RATE HOURS RATE HOURS RATE DESIGN ANALYSIS - $ 54 .80 - $ 38 . 50 $ 18 .00 DRAINAGE ANALYSIS 12.0 $ 54.80 32.0 $ 38.50 - $ 18 .00 ROADWAY PLANS 6.0 $ 54.80 32 .0 $ 38.50 46.0 $ 18.00 84 .0 UTILITIES $ 54 .80 - $ 38.50 $ 18.00 PERMITTING 6.0 $ 54 .80 14.0 $ 38.50 $ 18.00 20 .0 SIGNING & PAVEMENT MARKING PLANS $ 54.80 - $ 38 .50 $ 18 .00 TOTALS 1 24.0 78 .0 1 46 .0 148 .0 DESIGN ANALYSIS $ - $ $ - DRAINAGE ANALYSIS $ 657.60 $ 19232.00 $ ROADWAY PLANS $ 328.80 $ 11232 .00 $ 828.00 UTILITIES $ - $ $ PERMITTING $ 328.80 $ 539.00 $ MARKING PLANS $ - $ $ - TOTALS $ 1 ,315 .20 $ 3 ,003 .00 $ 828 .00 $ 5, 146.20 BY COST FOR HOURLY ACTIVITY ACTIVITY RATE DESIGN ANALYSIS $ DRAINAGE ANALYSIS 44.0 $ 1 ,889 .60 ROADWAY PLANS 84 .0 $ 21388.80 28 .44 UTILITIES $ - PERMITTING 20.0 $ 867 .80 SIGNING & PAVEMENT MARKING PLANS $ #DIV/0! TOTALS 148 .0 1 $ 5 , 146. 20 S34. 77 Average per hour 20th Aveneu SW (IRC) 10-16-08.xis 20th AVENUE SW 25TH STREET SW TO 21ST STREET SW HIGHWAY PAGE 1 OF HIGHWAY TASK LIST ACTIVITY : A. ROADWAY PLANS PACKAGE SUBACTIVITY: 2 - DRAINAGE DESIGN & ANALYSIS BASIS OF NO . OF NO . OF TOTAL PROJECT PROJECT TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS 1 . Design of Cross Drains Ea . 0 2. Drainage Maps Sheet 0 3. Design of Outfall Ditches Ea . 0 4. Interchange Drainage Design Ea . 0 5. Design of Storm Sewers Ea. 0 6. Design of Stormwater Retention / Detention Fac. Ea . 1 24 24 4.0 16.0 7. Design of Special Drainage Systems L .S. 2 0 8. Preparation of Bridge Hydraulics Report Ea. 0 9. Drainage Design Report L .S . 1 16 16 2 .0 14.0 10 Investigate Outfall Requirements L .S. 0 11 Pond Siting Report L.S . 0 SUBTOTAL THIS SHEETI 40 6 30 0 20th Aveneu SW ( IRC) 10-16-08 .xis 20th AVENUE SW 25TH STREET SW TO 21ST STREET SW HIGHWAY PAGE 2 OF 4 HIGHWAY TASK LIST ACTIVITY : A. ROADWAY PLANS PACKAGE SUBACTIVITY: 2 - DRAINAGE DESIGN & ANALYSIS BASIS OF NO . OF NO. OF TOTAL PROJECT PROJECT TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS 10. Quality Control 0% 0 11 . Supervision 0% 0 12. Field Reviews Ea. 0 13. Progress Meetings ( IRC) Ea. 2 2 4 4.0 14 Progress Meetings (GL Homes) Ea. 2 2 4 2 .0 2 .0 SUBTOTAL THIS SHEET a 6 2 0 TOTAL 1 48 1 12 32 0 20th Aveneu SW ( IRC) 10-16-08 .xis 20th AVENUE SW 25TH STREET SW TO 21ST STREET SW HIGHWAY PAGE 3 OF 4 HIGHWAY TASK LIST ACTIVITY: A. ROADWAY PLANS PACKAGE SUBACTIVITY : 3 - ROADWAY PLANS BASIS OF NO . OF NO . OF TOTAL PROJECT PROJECT TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS 1 . Key Map Sheet 0 2 . Typical Section & Notes Sheet 2 0 3. Summary of Quantities Each 1 8 1 8 4.0 4.0 4. Plan sheets Sheet 3 8 3 24 2.0 6 .0 16 .0 5. Profiles Sheet 0 6. Stormwater Pollution Prevention Plans Sheet 1 12 12 4.0 8.0 7. Sidestreet Profiles Sheet 0 8. Drainage Structure Sheets Sheet 0 9. Miscellaneous Construction Details L.S . 2 8 2 16 2 .0 6 .0 8. 0 10. Summary of Drainage Structures Sheet 6 0 11 . Cross-Sections Ea. 10 2 20 2 .0 8.0 10.0 pond and ditch 12 . Baseline Control Sheet 0 13 Cost Estimates Each 1 4 4 4.0 SUBTOTAL THIS SHEET 84 6 32 46 20th Aveneu SW (IRC) 10-16-08.x15 20th AVENUE SW 25TH STREET SW TO 21 ST STREET SW HIGHWAY PAGE 4 OF 4 HIGHWAY TASK LIST ACTIVITY: A. ROADWAY PLANS PACKAGE SUBACTIVITY: 5 - ENV. SERVICES / PERMITS BASIS OF NO . OF NO . OF TOTAL PROJECT PROJECT TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS 1 . Preliminary Field Review L.S . 0 2 . Agency Coordination ( Includes all Phases) L.S . 1 8 8 4.0 4.0 3 . Establish Wetland Jurisdictional Lines L .S. 0 4. Agency Field Review L.S . 0 Prepare Wetland Resouce / Dredge & Fill Permit 5. Application L.S . 1 8 8 2 .0 6.0 Prepare Stormwater Mgmt. & Surface Water Permit 6. Application (MSSW ) L.S . 1 2 2 2 .0 7. Prepare Coast Guard Navigation Permit Application L . S. 0 8. Prepare FDOT Permit Application L .S . 0 9. Prepare IRFWCD Drainage Permit Application L.S . 1 2 2 2 .0 10. L.S . 0 11 Miti ation Coordination and Meetings L.S. 0 SUBTOTAL THIS SHEET 20 6 14 0 20th Aveneu SW ( IRC) 10-16-08.xls