Loading...
HomeMy WebLinkAbout2008-049c�a/ice/a 8 7.?. aoo - oq BRIDGE REPLACEMENTS AND WIDENING OF 66TH AVENUE FROM SOUTH OF SR 60 TO 59TH STREET PROFESSIONAL CIVIL ENGINEERING, GEOTECHNICAL ENGINEERING AND LAND SURVEYING SERVICES AMENDMENT NO. 3 TO THE PROFESSIONAL ENGINEERINGILAND SURVEYING SERVICES AGREEMENT BETWEEN ARCADIS AND INDIAN RIVER COUNTY, FLORIDA. This is an amendment to the existing Engineering/Land Surveying Services Agreement (AGREEMENT) dated September 6, 2005 between ARCADIS (ENGINEER) and Indian River County (COUNTY). This amendment addresses changes in "Section I — Project Limits and Description", "Section III - Scope of Services", and "Section V - Compensation". Amendment Description This Amendment includes the following: "SECTION I - PROJECT LIMITS AND DESCRIPTION" is being modified to incorporate the following: Consultant services are required for the preparation of construction plans and permit applications for design of improvements to 66th Avenue from South of SR 60 to north of 57th Street. The scope of services included in this amendment consist of: Water Main Plans Water main improvements will be incorporated into the design plans for the construction of a 20 -inch diameter potable water main on 66th Avenue from 26`11 Street to north of 57°i Street for a total distance of approximately 19,000 feet or 3.59 miles. In addition, plans will be prepared for the construction of new water mains on the following intersecting streets: • 33`d Street — extend proposed 8 -inch diameter water main from existing 6 -inch main at Trillium to the existing 8 -inch main at Cherry Lane Manor for a total distance of approximately 2040 feet. • 3711 Street — extend proposed diameter 8 -inch water main from 100 -Feet west of 6611 Avenue to the existing 6 -inch main in Cherry Lane Manor for a total distance of approximately 1000 feet. • 4151 Street - extend proposed 12 -inch diameter water main from 100 -feet west of 66th Street to the existing 12 -inch water main on the east side of 66th Street for a total distance of approximately 400 feet. • 45th Street — extend proposed 8 -inch diameter water main from 100 -feet west of 66th Avenue to the existing 8 -inch main located approximately 300 feet east of 66th Street for a total distance of approximately 500 feet. Page 1 of 6 G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2007\66 th Ave Amendment No 3- 12-12-07.doc • 49 h Street — extend proposed 16 -inch diameter water main from approximately 100 feet west of 66`h Street to 200 feet east of 66`h Street for a total distance of approximately 400 feet. • 53" Street — extend proposed 12 -inch diameter water main from 100 -feet west of 66`h Avenue to 200 feet east of 66 h Avenue for a total distance of approximately 400 feet. • 57`h Street —extend proposed 8 -inch diameter water main from 100 feet west of 66h Avenue to 200 feet east of 66`h Avenue for a total distance of approximately 400 feet. The total length of the water main improvements will be distance of approximately 19,000 linear feet on 66`h Avenue and 5,140 linear feet on the various side streets for a total distance of 24,140 linear feet or 4.57 miles. Right of Way Maps and Sketch and Legal Descriptions The right of way maps and sketch and legal descriptions for the project will be modified to include existing topographic physical features. Existing physical features including structures, pavements, driveways, mailboxes, fences, and other existing improvements will be added to the right of way maps and sketch and legal descriptions. Corridor Study A corridor study will be prepared for 66`h Avenue from south of 26b Street to north of 57`h Street. The corridor study will consist of a brief report describing the existing conditions and the proposed improvements. The corridor study will include discussions of the following items: • Project location • Existing conditions • Typical Section alternatives • Alternative Alignments • Preferred alignment • Safety Considerations • Costs • Long Range Planning • Environmental Impacts Traffic Signals A traffic signal system will be designed for the intersection of 66`h Avenue and 57`h Street. The Traffic signal will be designed in accordance with Indian River County standards. 57`h Street Intersection Indian River County desires to expedite the construction of the section of 66`h Avenue from the North Relief Canal to north of 57`h Street. In addition, modifications to the typical section and alignment of 57`h Street west of 66`h Avenue are required due to right of way considerations. ARCADIS will revise the plans for 57th Street west of 66`h Avenue, and will prepare a separate set of stand alone plans for construction of the section of 66`h Avenue from Page 2 of 6 G:\LNR Support\ADMIN\itarketing\Proposals\WPB\2007\66 th Ave Amendment No 3- 12-12-07.doc north of the North Relief Canal to north of 57`h Street. Included in these plans will be a phasing plan and a temporary detour plan. "SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: E. The Roadway set of plans shall consist of the following: Page 3 of 6 G:\LNR Support\ADMINQvfarketing\Proposals\WPB\2007\66 th Ave Amendment No 3- 12-12-07.doe 30% 60% 90% 100% Cover Sheet X X X X Typical Sections X X X X Summary of Quantities and General Notes X X Summary of Drainage Structures Sheets X X X Details X X Plan and Profile Sheets (40 scale) X X X X Cross Sections at 100 ft interval X X X Landscape Plans X X X Signage & Pavement Marking Plans (100 scale) X X X X Signalization Plans X X X Bridge Plans X X X Intersection Plan & Details X X X X Drainage Maps X X X Stormwater Pollution Prevention Plans (SWPPP) X X Computation Book X Construction Cost Estimate and Quantities X X X X Water Main Plans X X X Page 3 of 6 G:\LNR Support\ADMINQvfarketing\Proposals\WPB\2007\66 th Ave Amendment No 3- 12-12-07.doe "SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following: The time for completion of the 90% design drawings, permit applications, and Engineer's Opinion of Probable Construction Cost for the project shall be six (6) months from the date of execution of ADDENDUM No. 3. Once permits are received, 100% design drawings shall be completed 90 days thereafter. Also, the first draft of the Corridor Study will be completed three (3) weeks from the date of execution of ADDENDUM No. 3. Once IRC comments are received, final report shall be completed one (1) week thereafter. "SECTION V — COMPENSATION" is being modified to incorporate the following: The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this Agreement fees in accordance with the following: A. Professional Services Fee The basic compensation mutually agreed upon by the ENGINEER and the COUNTY follows: The following is a summary of costs. Geotechnical Services (Tierra) Charge Associated with Change in Project Scope And Project Limits M/1 Engineering(ARCADIS)....................................................... $33,420.00 Signal Plans(ARCADIS) New Total Compensation $130,010.00 $7607700.00 $]2,112.00 $48,449.00 Design SurveyffieAvenue)(ARCADIS)........................................ $0.00 $169,500.00 Design Survey(Sidestreets)(ARCADIS) $0.00 $71,428.00 Right -of -Way Survey and Map(6e Avenue) .......................... $17,993.0 $127,821.00 Right-of-way Survey (Sidestreets) Structural Design for 4 bridges (Bridge Design Associates, Inc.) Landscape & Irrigation $0.00 $61,963.00 $0.00 $207,222.00 $0.00 $379000.00 Page 4 of k• F:\Public Works\Capital Projects\66th Ave (SR 60 to CR 510)\66th Ave_ARCADIS_66th Ave SR60-59th St\Contracts and Agendas\66 th Ave Amendment No 3- 1-12-07.doc Pond Surveys 0.00 $20,000.00 Water Main PlansARCADIS)..............................................$51,000.00 $51,000.00 (Lump Sum) Corridor Study(ARCADIS)...................................................$15,581.00 $15,581.00 TOTAL PROFESSIONAL SERVICES ............................... $1207106.00 $11690,674.00 HO URL Y RA TE ALLOWANCES Allowance for Sketch and Legal Descriptions and staking of parcels(375.00%ach) ........ NTE $31,000.00 $61,000.00 Allowance for Survey Crew and Soft Dig Machine for Horizontal and Vertical Utility Locations at Potential Conflicts (Survey $112IHr)...................................................................... NTE $0.00 $20,000.00 Allowance for Survey and Design Of a transition to match the existing pavement At the north end of the project ................................................. NTE $0.00 $12,000.00 TOTAL HO URL Y RA TE ALL 0 WANCES ..................NTE $31,000.00 $93,000.00 Page 5 of 6 C:\Documents and Settings\aweragoda\Local Settings\Temporary Internet Files\OLK72\66 th Ave Amendment No 3- 12-12-07.doc The AGREEMENT is hereby amended as specifically set forth here in. All other sections of the AGREEMENT shall remain in full force and effect and are incorporated herein. This Amendment No. 3 to the AGREEMENT regardless of where executed, shall be governed by and constructed by the laws of the State of Florida. In witness whereof the parties have executed this Amendment this 12th day of February 2008. ARCADIS G & M, INC. FLORIDA 201 Vista Parkway West Palm Beach, Fl. By. / :L� Henry W. Deibel, Jr., P.E. Associate Vice President WITNESSED BY: County Attorney Approved as to Form and Legal Sufficiency oseph A. Baird, ounty Administrator INDIAN gIVI R,COUNTY, B at L. Bowden, Chairman oard of Csinliy, Commissioners Approved by BCC February 12, 2003 Attest: Jeffrey K. Barton, Clerk of Circuit Court By: ,a C( -Lc" Deputy Clerk Page 6 of 6 G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2007\66 th Ave Amendment No 3- 12-12-07.doe