Loading...
HomeMy WebLinkAbout2008-369AINDIAN RIVER COUNTY''r PUBLIC WORKS DEPARTMENT PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT FOR ANNUAL PROFESSIONAL GEOTECHNICAL ENGINEERING SERVICES THIS AGREEMENT, entered into this 18th day of November , 2008 by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida, hereinafter referred to as the "COUNTY", and ARDAMAN & ASSOCIATES, INC, hereinafter referred to as the "GEOTECHNICAL PROFESSIONAL." WITNESSETH That the COUNTY and the GEOTECHNICAL PROFESSIONAL, in consideration of their mutual covenants, herein agree with respect to the performance of professional geotechnical and testing services by the GEOTECHNICAL PROFESSIONAL, and the payment for those services by the COUNTY, as set forth below and in individual Work Orders. This agreement shall be referred to as the "MASTER AGREEMENT" under which future Work Orders will apply. The GEOTECHNICAL PROFESSIONAL shall provide the COUNTY with professional geotechnical and testing services and such other related services as defined in specific Work Orders, in all phases of each project. The GEOTECHNICAL PROFESSIONAL shall serve as the COUNTY's professional representative for the project as set forth in each Work Order, and shall give professional geotechnical advice to the COUNTY during the performance of the services to be rendered. SECTION I — PROJECT LIMITS Project limits shall be identified in individual Work Orders prepared by the COUNTY and approved by the GEOTECHNICAL PROFESSIONAL. Each Work Order will be sequentially numbered and formally approved by the COUNTY prior to a Notice - to -Proceed being issued. Basic services required of the GEOTECHNICAL PROFESSIONAL for the project will be described in other appropriate sections of this Agreement and in individual Work Orders. SECTION II — COUNTY OBLIGATIONS The COUNTY agrees to provide the following material, data, or services as required in connection with the work to be performed under this Agreement: A. Provide the GEOTECHNICAL PROFESSIONAL with a copy of any pertinent preliminary data or reports available to the COUNTY. B. Provide the GEOTECHNICAL PROFESSIONAL with all reasonably available drawings, surveys, right-of-way maps, and other documents in the possession of the COUNTY that are pertinent to the project. C. The COUNTY shall be responsible for obtaining only those permits required to perform the work to complete the project, if such permit 1 FAEngineering\Capital Projects\Annual Geotechnical Services Contract\2008 RFQ\2008071 RFQ AGREEMENT-Ardaman & Assoc..doc requirements are made into law and established by regulatory agencies after the effective date of the Work Order. D. The COUNTY shall make all provisions for the GEOTECHNICAL PROFESSIONAL to enter upon public or private property as reasonably required for the GEOTECHNICAL PROFESSIONAL to perform his services. E. The COUNTY shall supply the GEOTECHNICAL PROFESSIONAL with copies of all applicable local codes and regulations. SECTION III — SCOPE OF SERVICES The GEOTECHNICAL PROFESSIONAL agrees to perform all necessary professional geotechnical and testing services and other pertinent services in connection with the assigned project as required and as set forth in the following: A. General 1. The GEOTECHNICAL PROFESSIONAL will endeavor not to duplicate any previous work done on any project. Before issuance of a Work Order and written authorization to proceed, the GEOTECHNICAL PROFESSIONAL shall consult with the COUNTY to clarify and define the COUNTY's requirements for the project and review all available data. 2. The GEOTECHNICAL PROFESSIONAL shall attend conferences with the COUNTY and its representatives, upon request. 3. In order to accomplish the work described under this Agreement under the time frames and conditions set forth in this Agreement, the GEOTECHNICAL PROFESSIONAL shall: a. Complete work on the project within the time allowed by maintaining an adequate staff of registered professional geotechnical engineers and technicians and other employees on the work at all times. b. Comply with all federal, state, and local laws applicable to this project(s). The GEOTECHNICAL PROFESSIONAL work product shall conform with all applicable federal, state and local laws applicable to this project(s). C. The GEOTECHNICAL PROFESSIONAL shall cooperate fully with the COUNTY in order that all phases of the work may be properly scheduled and coordinated. 4. All original documents (copy of), survey notes, tracings, and the like, including all items furnished to the GEOTECHNICAL PROFESSIONAL by the COUNTY pursuant to this Agreement, are and shall remain the property of the COUNTY, and shall be delivered to the COUNTY upon completion of the work. 5. Compensation to the GEOTECHNICAL PROFESSIONAL for basic services shall be in accordance with each Work Order, as mutually agreed upon by the GEOTECHNICAL PROFESSIONAL and the COUNTY. Current fee schedule is included in "Exhibit A" attached, and will be included as part of each Work Order when approved. SECTION IV — TIME FOR COMPLETION 2 F:\Engineering\Capital Projects\Annual Geotechnical Services Contract\2008 RFQ\2008071 RFQ AGREEMENT-Ardaman & AssocAoc The time for completion of each project shall be defined in the Work Order, SECTION V — COMPENSATION The COUNTY agrees to pay, and the GEOTECHNICAL PROFESSIONAL agrees to accept, for services rendered pursuant to this Agreement, fees in accordance with the following: A. Professional Services Fee - The basic compensation shall be mutually agreed upon by the GEOTECHNICAL PROFESSIONAL and the COUNTY prior to issuance of each Work Order, and the amount shall be included in the Work Order to be formally approved by the Board of County Commissioners. B. Direct Payment for Certain Services - The COUNTY will not pay for services or goods provided by others working in conjunction with the GEOTECHNICAL PROFESSIONAL. SECTION VI — ADDITIONAL SERVICE WORK Additional service work occurs when the COUNTY requests changes after it has formally approved this Agreement. Additional service work shall not commence until a Work Order for the additional work has been formally issued by the County Engineer or his designee, and formally approved by the Board of County Commissioners, or the County Administrator and the additional service work shall be performed in accordance with the fee schedule set forth in that Work Order. SECTION VII — CHANGE IN THE PROJECT SCOPE AFTER A WORK ORDER HAS BEEN EXECUTED If the project scope is changed after a Work Order has been executed, such work shall be the subject of a Supplemental Work Order formally approved by the Board of County Commissioners or the County Administrator pursuant to his delegated authority. SECTION VIII — PAYMENTS The COUNTY shall make progress payments to the GEOTECHNICAL PROFESSIONAL on the basis of the approved partial payment request as recommended by COUNTY in accordance with the provisions of the Local Government Prompt Payment Act, Florida Statutes section 218.70 et. seq. The COUNTY shall retain ten percent (10%) of the payment amounts due to the GEOTECHNICAL PROFESSIONAL until fifty percent (50%) completion of the work. After fifty percent (50%) completion of the work is attained as certified to COUNTY in writing, COUNTY shall retain five percent (5%) of the payment amount due to GEOTECHNICAL PROFESSIONAL until final completion and acceptance of all work to be performed by CONTRACTOR under the Contract Documents. Pursuant to Florida Statutes section 218.735(8)(b), fifty percent (50%) completion means the point at which the COUNTY as OWNER has expended fifty percent (50%) of the total cost of the services purchased under the Contract Documents, together with all costs associated with existing change orders and other additions or modifications to the construction services work provided under the Contract Documents. 3 F:\Engineering\Capital Projects\Annual Geotechnicai Services Contract\2008 RFQ\2008071 RFQ AGREEMENT-Ardaman & Assoc..doc Unless otherwise stated in the Work Order, the GEOTECHNICAL PROFESSIONAL shall submit duly certified invoices in duplicate to the County Engineer. The Agreement shall be divided into units of deliverables, which shall include, but not be limited to, reports, findings, recommendations, and test results, that must be received and accepted in writing by the County Engineer, prior to payment. SECTION IX — RIGHT OF DECISIONS All services shall be performed by the GEOTECHNICAL PROFESSIONAL to the satisfaction of the County Engineer who shall decide all questions, difficulties, and disputes of whatever nature that may arise under or by reason of this Agreement, according to the prosecution and fulfillment of the service hereunder, and the character, quality, amount and value thereof. The COUNTY's decision upon all claims, questions, and disputes shall be final, conclusive, and binding upon the parties hereto, unless such determination is clearly arbitrary or unreasonable. Adjustments of compensation and contract time because of any major changes in the work that might become necessary or be deemed desirable as the work progresses shall be reviewed by the County Engineer. If the GEOTECHNICAL PROFESSIONAL does not concur in the judgment of the County Engineer as to any decisions made by him or her, it shall present its written objections to the County Administrator of Indian River County, who shall make a decision, and the GEOTECHNICAL PROFESSIONAL shall abide by the County Administrator's decision, unless the decision is clearly arbitrary or unreasonable. SECTION X — OWNERSHIP AND REUSE OF DOCUMENTS A. Ownership and Copyright: Ownership and copyright of all reports, test results, and other data developed by the GEOTECHNICAL PROFESSIONAL pursuant to this Agreement, shall be vested in the COUNTY. Said materials shall be made available to the COUNTY by the GEOTECHNICAL PROFESSIONAL at any time upon request of the COUNTY. On or before the tenth day after all work contemplated under this Agreement is complete, all of the above materials shall be delivered to the County Engineer. B. Reuse of Documents: All documents, including but not limited to reports and tests, prepared or performed by the GEOTECHNICAL PROFESSIONAL pursuant to this Agreement, are related exclusively to the services described herein. They are not intended or represented to be suitable for reuse by the COUNTY or others on extensions of this project or on any other project. The COUNTY's reuse of any document shall be at the COUNTY's own risk. The COUNTY shall not hold the GEOTECHNICAL PROFESSIONAL liable for any misuse by others. SECTION XI — NOTICES Any notices, reports or other written communications from the GEOTECHNICAL PROFESSIONAL to the COUNTY shall be considered delivered when posted by certified mail or delivered in person to the County Engineer. Any notices, reports or other communications from the COUNTY to the GEOTECHNICAL PROFESSIONAL, shall be considered delivered when posted by certified mail to the GEOTECHNICAL 4 F:\Engineering\Capital Projects\Annual Geotechnical Services Contract\2008 RFQ\2008071 RFQ AGREEMENT-Ardaman & Assoc-doc PROFESSIONAL at the last address left on file with the COUNTY or delivered in-person to said GEOTECHNICAL PROFESSIONAL or its authorized representative. SECTION XII — TERMINATION Either party may terminate this Agreement upon seven (7) days written notice to the other party, except if the GEOTECHNICAL PROFESSIONAL terminates this Agreement, such termination shall not be effective, absent the COUNTY's consent, until the GEOTECHNICAL PROFESSIONAL'S completion to the COUNTY's satisfaction, of any pending Work Order. SECTION XIII — GEOTECHNICAL PROFESSIONAL'S PERSONNEL ASSIGNED TO THE PROJECT The COUNTY shall have the right of approval of all GEOTECHNICAL PROFESSIONAL's personnel assigned to any COUNTY project. Therefore, any subsequent changing of assigned personnel to any COUNTY project shall also be subject to COUNTY approval. Failure to adhere to this policy shall be considered a cause for contract termination. SECTION XIV — AUDIT RIGHTS The COUNTY reserves the right to audit the records of the GEOTECHNICAL PROFESSIONAL related to this Agreement at any time during the prosecution of the work included herein and for a period of three years after final payment is made. SECTION XV — SUBLETTING The GEOTECHNICAL PROFESSIONAL shall not sublet, assign, or transfer any work under this Agreement without the written consent of the COUNTY. When applicable and upon receipt of such consent in writing, the GEOTECHNICAL PROFESSIONAL shall cause the names of the engineering and geotechnical firms responsible for the major portions of each separate specialty of the work to be inserted on the reports or other data. SECTION XVI — WARRANTY The GEOTECHNICAL PROFESSIONAL warrants that it has not employed or retained any company or person other than a bona fide employee working solely for the GEOTECHNICAL PROFESSIONAL, to solicit or secure this Agreement, and that it has not paid or agreed to pay any company or person other than a bona fide employee working solely for the GEOTECHNICAL PROFESSIONAL any fee, commission, percentage fee, gifts or any other considerations, contingent upon or resulting from the award or making of this Agreement. For the GEOTECHNICAL PROFESSIONAL breach of violation of this warranty, the COUNTY shall have the right to annul this Agreement without liability. SECTION XVII — DURATION OF AGREEMENT This Agreement shall remain in full force and effect for a period of one year after the date of execution thereof, or until completion of all project phases as defined by the County Engineer, whichever occurs first, or unless otherwise terminated by mutual consent of the parties hereto, or terminated pursuant to Section XII — "Termination." This Agreement may be extended for three additional one year increments at the discretion of the COUNTY. 5 FAEngineering\Capital Projects\Annual Geotechnical Services Contract\2008 RFQ\2008071 RFQ AGREEMENT-Ardaman & Assoc..doc SECTION XVIII — INSURANCE During the performance of the work covered by this Agreement, the GEOTECHNICAL PROFESSIONAL shall provide the COUNTY with evidence that the GEOTECHNICAL PROFESSIONAL has obtained and maintains the insurance listed in the Agreement. 1. GEOTECHNICAL PROFESSIONAL shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the GEOTECHNICAL PROFESSIONAL, its agents, representatives, employees or subcontractors. The cost of such insurance shall be included in the GEOTECHNICAL PROFESSIONAL's fees. 2. Minimum Scope of insurance (Tor Tees 1e55 Mall %2UVV.V. VJ, A. Worker's Compensation as required by the State of Florida. Employers Liability of $100,000 each accident, $500,000 disease policy limit, and $100,000 disease each employee. B. General Liability $1,000,000 combined single limit per accident for bodily injury and property damage. Coverage shall include premises/operations, products/completed operations, contractual liability, and independent contractors. COUNTY shall be named an "Additional Insured" on the certificate of insurance. C. Auto Liability $500,000 combined single limit per accident for bodily injury and property damage. Coverage shall include owned vehicles, hired vehicles, and non -owned vehicles. COUNTY shall be named an "Additional Insured" on the certificate of insurance. D. Professional Liability Insurance providing coverage for negligent acts, errors, or omissions committed by GEOTECHNICAL PROFESSIONAL with a $500,000 per claim/annual aggregate. This insurance shall extend coverage to loss of interest, earning, profit, use and business interruption, cost of replacement power, and other special, indirect, and consequential damages. 3. GEOTECHNICAL PROFESSIONAL's insurance coverage shall be primary. 4. All above insurance policies shall be placed with insurers with a Best's rating of no less that A -VII. The insurer chosen shall also be licensed to do business in Florida. 5. The insurance policies procured, other than professional liability, shall be occurrence forms, not claims made policies. Professional liability shall be on a claims -made basis. 6. The insurance companies chosen shall provide certificates of insurance prior to signing of contracts, to the Indian River County Risk Management Department. 7. Each insurance company shall provide the Indian River County Risk Management Department with a certificate of insurance that states that 6 FA\Engineering\Capital Projects\Annual Geotechnical Services Contract\2008 RFQ\2008071 RFQ AGREEMENT-Ardaman & Assoc..doc the insurance company will provide 30 days notice to the Risk Management Department, of its intent to modify or cancel said policies of insurance. Such notice shall be in writing by registered mail, return receipt requested, and addressed to the Risk Manager of the Risk Management Department. 8. The GEOTECHNICAL PROFESSIONAL shall include all sub -contractors as insured under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein. 9. Any deductibles or self-insured retentions greater than $5,000 must be approved by the Risk Manager for Indian River County with the ultimate responsibility for same going to the GEOTECHNICAL PROFESSIONAL. SECTION XIX - INDEMNIFICATION GEOTECHNICAL PROFESSIONAL hereby agrees to indemnify, and hold harmless, the COUNTY, and the COUNTY's officers, employees and agents, from and against any and all claims from liabilities, damages, losses, costs, third party claims, judgments, and expense to persons or property, including reasonable attorneys' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of GEOTECHNICAL PROFESSIONAL, or of GEOTECHNICAL PROFESSIONAL's officers, employees, or agents, and GEOTECHNICAL PROFESSIONAL shall indemnify the COUNTY against any such claims and any judgments that may be entered in connection therewith, including reasonable attorneys' fees. SECTION XX — SAFETY The GEOTECHNICAL PROFESSIONAL is solely responsible for any job site safety. However, in accordance with generally accepted practices, the GEOTECHNICAL PROFESSIONAL may report any observed job site safety violations by others to the COUNTY. SECTION XXI — CHOICE OF LAW AND VENUE This Agreement shall be governed by the laws of the State of Florida. Venue for any lawsuit brought by either party against the other party or otherwise arising out of this Contract shall be in Indian River County, Florida, or in the event of a federal jurisdiction, in the United States District Court for the Southern District of Florida. SECTION XXII — ENTIRETY OF AGREEMENT This writing embodies the entire Agreement and understanding between the parties hereto, and there are no other Agreements and understandings, oral or written, with reference to the subject matter hereof that are not merged herein and superseded hereby. No alteration, change, or modification of the terms of this Agreement shall be valid unless made in writing and signed by both parties hereto. SECTION XXIII - SEVERABILITY If any provision, section, or paragraph of this agreement is determined by a court of competent jurisdiction to be void, illegal, or unenforceable, the remaining portions not found to be void, illegal, or unenforceable, shall remain in full force and effect. F:\Engineering\Capital Projects\Annual Geotechnical Services Contract\2008 RFQ\2008071 RFQ AGREEMENT-Ardaman & Assoc..doc IN WITNESS WHEREOF the parties hereto have executed these presents this 18th day of Novmbr _, 2008. ARDAMAN & ASSOCIATES, INC. a Title: )_T�(tnCJ.A WITNESS: BY: NAME: J& -)q N 104 R() 4t INDIAN RIVER COUNTY, FLORIDA BOARD OF COUNTY COMM,I$SI,ONERS B Wesley S. Davis, Chairman Board of GOvi ty Commissioners Approved by the 8C( O.V• l n r" . Clerk of the Court BY: Lzz / I NDE/UTY CLEKK OF COURT WILLIAM G. COLLINS, II COUNTY ATTORNEY 8 E Engineering\Capital Projects\Annual Geotechnical Services Contract\2008 RFQ\2008071 RFQ AGREEMENT-Ardaman & Assoc..doc EXHIBIT "A" ARDAMAN & ASSOCIATES, INC, FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1, 2008 through September 30, 2009) SITE PREPARATION PROCEDURES INSPECTION, SAMPLING AND TESTING SERVICES Monitoring of the removal of deleterious soils or materials Inspection of placement and compaction of fill material. Penetrometer tests. Sampling of natural or fill material Inspection of borrow areas. Engineering technician Senior engineering technician Density Tests: In-situ density tests, nuclear or drive sleeve method (minimum of four per trip) Sampling of natural or fill material for laboratory testing; Engineering technician ASPHALT: FIELD INSPECTION, SAMPLING AND LABORATORY TESTING Engineering technician time for field sampling Coring: Mobilization of coring equipment: With power supplied Without power supplied Certified engineering technician to inspect preparation of base course/surface installation or plant control Asphalt mix designs Marshall Stability and Flow Test (Includes pill densities) Extraction and gradation tests (sampled hot) Extraction and gradation tests (sampled from pavement) Density tests Depth measurements STRUCTURAL STEEL: Field inspection for visual examination of welds, ultrasonic testing, dye penetrant, magnetic particle, etc. Metals technician (Equipment charge determined by project) OVERTIME AND HOLIDAY Charges will be increased 50% for work performed during weekends and official holidays. SUB -CONTRACTING SERVICES Cost Plus 12% — _ Ardaman &Associates, Inc. $44.00/hour $52.00/hour $22.00/test $44.00/hour $44.00/hour $125.00/trip $100.00/trip $65.00/hour $550.00/design $95.00/test $95.00/test $135.00/test $22.00/test $8.00/test $52.00/hour EXHIBIT "A" ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1, 2008 through September 30, 2009) CONCRETE SAMPLING AND TESTING Cylinder samples (up to 4 cylinders per set): molding curing, and strength testing (ASTM C-31 and C-39). Cylinders shall be left in a place provided by the Contractor, covered with plastic caps and attempts made to provide shade thereon. If temperature of the air is critical to first 24 hours (during field curing), equipment to maintain such controls shall be provided by others. $80.00/set Additional cylinders $15.00/cylinder Technician time due to construction delays in excess of 1.0 hour on-site on the date cylinders are made $44.00/hour Technician time transporting cylinders from site to office if no other work is required $44.00/hour Curing and strength testing samples delivered to our laboratory (ASTM C-39) $15.00/cylinder Continuous monitoring of concrete placement and/or extra slump and temperature tests, technician time $44.00/hour Slump tests (ASTM C-143) $15.00/test Air Entrainment (ASTM C-173) $30.00/test Unit weight $35.00/test Yield tests $35.00/test Verification of mix design $225.00/each Fineness modules $44.00/each Plant control $44.00/hour Concrete blocks. Strength tests (determined by gross area) $30.00/block Concrete blocks. Absorption and strength tests (net area) $125.00/set of 3 Block Prism Assembly $220.00/set of 3 Flexural Strength Beams (up to 3 beams) $30.00 each additional beam $150.00/set of 3 Test beams made by others $50.00/each Grout Prisms 3/set (blocks supplied by others) $75.00/set Marsh Funnel Viscosity $35.00/test SAMPLING AND TESTING OF IN-PLACE CONCRETE/SOIL CEMENT Coring and testing of cored samples: Technician time (two technicians may be required) $44.00/hour Mobilization of coring equipment With power supplied $125.00/trip Without power supplied $100.00/trip Trimming, capping and strength test (ASTM C-42) $30.00/core Depth measurement $15.00/core Swiss Hammer Mobilization of equipment $50.00/trip Technician time $52.00/hour — _ Ardaman &Associates, Inc. EXHIBIT "A" ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1, 2008 through September 30, 2009) ENGINEERING Data Evaluation, Engineering Analysis, Design, Inspections, Field Monitoring, etc. Principal Engineer Per Hour $125.00 Senior Project Engineer (P.E. / Branch Manager) Per Hour $105.00 Project Engineer Per Hour $85.00 Staff Engineer Per Hour $75.00 CONSTRUCTION MONITORING AND FIELD TESTING Senior Field Technician Per Hour $52.00 Field Technician Per Hour $44.00 SUPPORT PERSONNEL Senior Technical Draftsman Per Hour $52.00 Technical Draftsman I Per Hour $44.00 Technical Secretary Per Hour $42.00 — _ Ardaman &Associates, Inc. EXHIBIT "A" ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1, 2008 through September 30, 2009) CLASSIFICATION TESTS Moisture Content (ASTM D-2216) Each $15.00 Organic Content • Loss on Ignition (ASTM D-2974) Each $30.00 • Wet Combustion (AASHTO T-194) Each $95.00 Unit Weight/Classification (Undisturbed Sample) Each $48.00 Grain Size Distribution • Sieve Analysis (ASTM D-421, D-422) Each $65.00 • Percent Fines (ASTM D-1140) Each $30.00 • Hydrometer Analysis (ASTM D-422) Each $85.00 Atterberg Limits (ASTM D-4318) • Plasticity Index Less than 150% Per Set $105.00 • Plasticity Index Greater than 150% Add'I Per Set $80.00 Shrinkage Limit (ASTM D-4943) Each $75.00 Specific Gravity (ASTM D-854) Each $65.00 Los Angeles Abrasion Each $350.00 COMPACTION TESTS Standard (ASTM D-698) or Modified Proctor (ASTM D-1557) Per Test $80.00 Maximum -Minimum Density (ASTM D-4253, D-4254) Per Set $95.00 Limerock Bearing Ratio (3 points) Per Test $275.00 CONSOLIDATION TESTS Incremental Consolidation Test (ASTM D-2435) • Up to Ten Load -Unload Increments Per Test $460.00 • More than Ten Load -Unload Increments Per Add'I Increment $50.00 Constant Rate of Strain Consolidation Test (ASTM D-4186) Each $560.00 PERMEABILITY TESTS Permeability Test on Sand Each $135.00 Permeability Test on Fine Grained Soil • k >10-8cm/sec Each $225.00 • k <10-8cm/sec Each $350.00 Test Duration Greater than 7 days Per Add'I Increment $20.00 Permeation with Fluids Other Than Water Add'I Per Test $115.00 STRENGTH TESTS Strength Index Tests (Torvane, Penetrometer, etc.) Each $12.00 Vane Shear Test Each $22.00 Unconfined Compression Test (ASTM D-2166) • Strength Only Each $50.00 • With Stress -Strain Curve Each $85.00 Triaxial Tests: • Unconsolidated -Undrained (ASTM D-2850) Each $185.00 • Unconsolidated -Undrained (with pore pressure response) Each $420.00 • Consolidated -Undrained (with pore pressure measurement) Each $420.00 • Consolidated -Drained on Sands Each $320.00 • Consolidated -Drained on Fine Grained Soils Each $480.00 • Use of Fluids Other Than Water Add'I Per Test $145.00 Direct Shear Tests (Coarse Grained Soils) • Conventional 2.3" Box Shear Per Normal Load $230.00 • With Stress Reversals Per Normal Load $340.00 • Conventional 12" Box Shear Per Normal Load $430.00 • Set -Up Charge for Geosynthetics Add'I Per Normal Load $70.00 in - _ Ardaman &Associates, Inc. EXHIBIT "A" ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1, 2008 through September 30, 2009) CHEMICAL TESTS pH Each $15.00 Specific Conductance Each $12.00 Fluoride Each $22.00 Sulfate Each $42.00 Chloride Each $42.00 Soil pH Each $25.00 Soil Specific Conductance Each $42.00 Soil Resistivity (ASTM G-57) Each $42.00 Carbonate Content Each $80.00 Corrosion Series (pH, sulfate, chloride and resistivity) Each $155.00 CHEMICAL LABORATORY SUBCONSULTANT SERVICES Laboratory Analytical Testing Cost + 12% GEOSYNTHETICS Geomembrane Thickness (ASTM D-1593) Per Sample $30.00 Geomembrane Density (ASTM D-792) Per Sample $46.00 Geomembrane Tensile Strength (ASTM D-638), Machine and Transverse Direction Per Set $110.00 Geomembrane Tear Resistance (ASTM D-1004), Machine and Transverse Direction Per Set $75.00 Weld Peel and Shear (ASTM D-413, D-882) Per Set $82.00 Geotextile Tensile Strength (ASTM D-4632) Per Set $110.00 Geotextile Trapezoidal Tear (ASTM D-4533) Per Set $130.00 SAMPLE PREPARATION AND SPECIAL TESTS Preparation of Samples for Testing (e.g., crushing for carbonate content determination, filtering of clayey soil for chemical tests) will be charged at $25.00 per sample. Prices for other tests on geomembranes and geotextiles will be determined per project based upon technician man-hours and other considerations. .16 — _ Ardaman &Associates, Inc. EXHIBIT "A" ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1, 2008 through September 30, 2009) MOBILIZATION AND DEMOBILIZATION • Men and Equipment • Portable Barge STANDARD DRILLING All Terrain Vehicle Auger Borings (4 -inch) Wash Borings - Cuttings Only (up to 3 inch) • Soil drilling • Rock drilling Standard Penetration Test (SPT) Borings (ASTM D-1586) in soil (N -values <50): • from surface to 25 feet • from 25 feet to 50 feet • from 50 feet to 100 feet • from 100 feet to 125 feet • from 125 feet to 150 feet Standard Penetration Test (SPT) Borings in high resistance soil/rock (N -values >50) Furnish, Install, and Remove Casing (up to 4 -inch): • from surface to 50 feet • from 50 feet to 100 feet • from 100 feet to 150 feet Drilling (Time Basis)/2 man -crew Drilling (Time Basis)/3 man -crew Support Water Truck (Time Basis) Rock Coring (N or H size) • from surface to 50 feet • from 50 feet to 100 feet • from 100 feet to 150 feet Field Permeability SAMPLING Additional SPT Sampling: • from 10 feet to 25 feet • from 26 feet to 50 feet • from 51 feet to 100 feet • from 101 feet to 125 feet • from 126 feet to 150 feet Undisturbed Samples: • Shelby Tube • Fixed -Piston Shelby, Osterberg, Pitcher SOUNDINGS Electric Dutch Cone Soundings Piezocone Soundings Muck Probing/Clay Sampling Cone/Piezoprobe Soundings (Time Basis) Piezoprobe Dissipation Monitoring OTHER CHARGES Clearing Difficult Access, Hole Location and Set -Up Standby Time Piezometer and Well Installation (plus materials) Bore Hole Grouting and Sealing (plus materials) Well Clearing/Sensitivity/Water Level Air Boat Use Instrumentation Unit Use Materials -R e AbOan &Associates, Inc. Borings $250.00 Per Job $5,000.00 Minimum Add'I Price Per LF $1.50 $8.00 Per Lineal Foot $9.00 $12.00 Per Lineal Foot $8.00 Per Lineal Foot $12.00 Per Lineal Foot $12.00 Lineal Foot Per Lineal Foot $13.00 Per Per Lineal Foot $14.50 $170.00 Per Lineal Foot $18.00 Per Lineal Foot $22.00 Crew -Hour Add'I Price Per LF $3.50 Per Lineal Foot $7.50 Per Lineal Foot $9.00 Per Lineal Foot $10.50 Per Crew -Hour $145.00 Per Crew -Hour $170.00 Per Day $120.00 Per Lineal Foot $26.00 Per Lineal Foot $28.00 Per Lineal Foot $32.00 Per Test $350.00 Per Additional Sample $23.00 Per Per Additional Sample $26.00 Per Per Additional Sample $29.00 $130.00 Per Additional Sample $34.00 Per Additional Sample $39.00 Crew -Hour Per Sample $100.00 Per Per Sample $110.00 Crew Hour Per Lineal Foot $9.50 Per Lineal Foot $10.50 Per Crew Hour $120.00 Per Crew Hour $170.00 Per Crew Hour $130.00 Per Crew -Hour $125.00 times 1.5 Per Crew -Hour rates $125.00 Per Crew -Hour $140.00 Per Crew -Hour $140.00 Per Crew -Hour $125.00 Per Day $300.00 Per Day $150.00 Per Job At Cost + 12% Normal drilling rates times 1.5 Normal drilling rates times 1.5 EXHIBIT "A" ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1, 2008 through September 30, 2009) ENVIRONMENTAL SITE ASSESSMENTS Phase I Environmental Site Assessments Tracts 50 acres or less (contiguous properties or per individual tract) Tracts between 51 and 500 acres (contiguous properties) Tracts greater than 500 acres Phase 11 Environmental Site Assessments Analytical Laboratory testing for hazardous or petroleum contamination (soil, sediment and groundwater) OTHER RELATED ENVIROMENTAL DRILLING CHARGES Support Water Truck Drumming Contaminated Soil/Drilling Fluids In 55 gallon drums (Disposal not Included) Drum Disposal Visqueen (100 feet by 20 feet) MONITORING WELL INSTALLATION Temporary 2 -inch PVC Wellpoint (Piezometer)) 2 -inch PVC NOTE: Double cased deep monitoring well (above cost x 2) VAULT/PAD INTALLATION — MONITORING WELLS Well Size 2" 4" 2" or 4" DIRECT PUSH GROUNDWATER SAMPLING Direct Push Sampler (minimum 1 day) ENVIRONMENTAL FIELD TESTING SERVICES Slug Injection/Withdrawal Permeability Test Double Ring Infiltrometer Test (ASTM D-3385-75) Per Day Per Drum Per Drum Per Roll Per Foot Per Foot Vault Size 8" w/pad 12" w/pad Above ground riser w/pad Per Day Each Each $2,100.00 $2,600.00 varies varies cost + 15% $150.00 $150.00 Varies $85.00 $18.00 $35.00 $275.00 $380.00 $275.00 $1,500.00 1 11 '.:1 /1 • SPECIAL DRILLING/SOUNDING Prices for special drilling (barge drilling; air boat sampling; amphibious drilling; NO wire line coring; large diameter borings; drilling in corrosive, contaminated or hazardous materials; drilling at great depths; installing large diameter temporary casing; etc.) field vane testing, and other specialized sampling or field tests will be determined per project. INSTRUMENTATION Prices for installation of monitor wells, inclinometers and settlement devices and prices for performing field permeability and packer tests will be determined per project. Ardaman &Associates, Inc. EXHIBIT "A" ARDAMAN & ASSOCIATES, INC. FEE SCHEDULE INDIAN RIVER COUNTY GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING AND CONSTRUCTION MATERIALS TESTING SERVICES (October 1, 2008 through September 30, 2009) GENERAL FIELD EQUIPMENT: Field Gas Chromatograph Per Day $300.00 Data Logger Per Day $240.00 Organic Vapor Analyzer (OVA 128 or Gastech) Per Day $120.00 Photo Ionization Detector (Photovac Tip) Per Day $110.00 Generator Per Day $95.00 Steam Cleaner Per Day $100.00 Surveying Equipment (Water Table Elevations) Per Day $55.00 Centrifugal Development Pump Per Day $50.00 Submersible Development Pump Per Day $100.00 Peristaltic Purging Pump Per Day $40.00 Magnetometer Per Day $35.00 Product/Water Interface Probe Per Day $35.00 pH/Conductivity Meter Per Day $25.00 Turbidity Meter Per Day $55.00 Water Level Indicator Per Day $20.00 Bailer Usage (Stainless Steel or Teflon -Per Each) Per Day $18.00 Measuring Wheel Per Day $8.00 35 mm Camera Per Day $8.00 Barricade (per unit) Per Day $3.00 Concrete Saw Per Day $100.00 EXPENDABLE SUPPLIES: High Capacity (0.45 micron) Filter Each $22.00 Disposable Teflon Bailer Each $18.00 Disposable Polyethylene Bailer Each $13.00 Isopropyl Alcohol (decontamination) Per Gallon $15.00 Deionized Water (decontamination) Per Five Gallon $14.00 16 oz. Soil Jars (soil headspace analysis) Per Box of 12 $10.00 Tygon Tubing Per Foot $2.50 Polyethylene Tubing Per Foot $.60 55 -gallon Drum Each $65.00 HEAVY EQUIPMENT: Vacuum Truck, Dump Truck, Crane, Excavator, Trackhoe, Backhoe, etc. Per Job Cost + 15% REMEDIATION EQUIPMENT: Cost is based on type of equipment and duration of project. Cost to be determined on project by project basis. — _ Ardaman &Associates, Inc.