HomeMy WebLinkAbout2009-301C Board of County Commissioners
4 1801 27th Street co C7
Vero Beach, Florida 32960
Telephoite: ( 772) 567- 8000
ORI�Q+ FAX: ( 772) 77&9391
RENEWAL OF
PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT
FOR ANNUAL GEOTECHNICAL SERVICES
This shall serve as mutual consent to extend the Agreement between Indian River County
and Ardaman & Associates , Inc . for Professional Geotechnical Services from November 19 ,
2009 to � 18 , 2010 .
All provisions of the original agreement, approved November 18 2009 shall remain in
fVie= b rLYLLry
full force and effect . The fee schedule for November 19 , 2009 through Novem 181 2010 shall
rc (oruwry
remain in effect from November 19 , 2009 through Nevpmlao 181 2010 as stated in " Exhibit A"
( attached) . _O_ fill
ARD /%AIA `d & ASSOCIATES , INC . INDIAN RIVER COUNTY, 'F1 . ORIDA
r ' .. �c . illseu �er Peter D . 0 ' Bryan Chamirman
TIT E : --
-� Approved by BCC _�! ovember 17 , 2009
i} Attest :
l � Jeffrey K . Barton , Clerk of Circu Court
William G . Collins , 11 , County Attorney
Approved as to Form and Legal Sufficiency • <.
Joseph . Baird
County Administrator
I ) , iiin ' n : it . , . . I : n = i . L 1 , ; I ' I , III 1 4
' ' I . .
EXHIBIT " A"
ARDAMAN & ASSOCIATES , INC .
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING�SERVICES
( November 19 , 2009 through -� bre r 18; 2010) —Oil!
SITE PREPARATION PROCEDURES INSPECTION , SAMPLING AND TESTING SERVICES
Monitoring of the removal of deleterious soils or materials
Inspection of placement and compaction of fill material .
Penetrometer tests . Sampling of natural or fill material
Inspection of borrow areas .
Engineering technician $44 . 00/hour
Senior engineering technician $ 52 . 00/hour
Density Tests :
In-situ density tests , nuclear or drive sleeve method
( minimum of four per trip) $22 . 00/test
Sampling of natural or fill material for
laboratory testing ; Engineering technician $44 . 00/hour
ASPHALT : FIELD INSPECTION , SAMPLING AND LABORATORY TESTING
Engineering technician time for field sampling $44 . 00/hour
Coring :
Mobilization of coring equipment :
With power supplied $ 125 . 00/trip
Without power supplied $ 100 . 00/trip
Certified engineering technician to inspect
preparation of base course/surface installation or plant control $65 . 00/hour
Asphalt mix designs $ 550 . 00/design
Marshall Stability and Flow Test ( Includes pill densities ) $ 95 . 00/test
Extraction and gradation tests (sampled hot) $95 . 00/test
Extraction and gradation tests (sampled from pavement) $ 135 . 00/test
Density tests $ 22 . 00/test
Depth measurements $ 8 . 00/test
STRUCTURAL STEEL :
Field inspection for visual examination of welds , ultrasonic
testing , dye penetrant, magnetic particle , etc .
Metals technician $ 52 . 00/hour
( Equipment charge determined by project)
OVERTIME AND HOLIDAY
Charges will be increased 50 % for work performed during weekends and official holidays .
SUB -CONTRACTING SERVICES
Cost Plus 12 %
JW ® Ardarnan & Associrttes . Ir7c .
EXHIBIT "A"
ARDAMAN & ASSOCIATES , INC .
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
f=ebruary
( November 19 , 2009 through Nerremb f8 , 2010 )
CONCRETE SAMPLING AND TESTING
Cylinder samples ( up to 4 cylinders per set) : molding
curing , and strength testing (ASTM C-31 and C- 39 ) .
Cylinders shall be left in a place provided by the
Contractor , covered with plastic caps and attempts
made to provide shade thereon . If temperature of
the air is critical to first 24 hours (during field curing ) ,
equipment to maintain such controls shall be provided
by others . $80 . 00/set
Additional cylinders $ 15 . 00/cylinder
Technician time due to construction delays in excess
of 1 . 0 hour on-site on the date cylinders are made $44 . 00/hour
Technician time transporting cylinders from site to office
if no other work is required $44 . 00/hour
Curing and strength testing samples delivered to our
laboratory (ASTM C -39 ) $ 15 . 00/cylinder
Continuous monitoring of concrete placement and/or
extra slump and temperature tests , technician time $44 . 00/hour
Slump tests (ASTM C- 143) $ 15 . 00/test
Air Entrainment (ASTM C - 173 ) $30 . 00/test
Unit weight $ 35 . 00/test
Yield tests $ 35 . 00/test
Verification of mix design $225 . 00/each
Fineness modules $44 . 00/each
Plant control $44 . 00/hour
Concrete blocks . Strength tests (determined by gross area ) $ 30 . 00/block
Concrete blocks . Absorption and strength tests ( net area ) $ 125 . 00/set of 3
Block Prism Assembly $220 . 00/set of 3
Flexural Strength Beams ( up to 3 beams ) $ 30 . 00 each additional beam $ 150 . 00/set of 3
Test beams made by others $ 50 . 00/each
Grout Prisms 3/set ( blocks supplied by others ) $ 75 . 00/set
Marsh Funnel Viscosity $ 35 . 00/test
SAMPLING AND TESTING OF IN -PLACE CONCRETE/SOIL CEMENT
Coring and testing of cored samples :
Technician time (two technicians may be required ) $44 . 00/hour
Mobilization of coring equipment
With power supplied $ 125 . 00/trip
Without power supplied $ 100 . 00/trip
Trimming , capping and strength test (ASTM C -42 ) $ 30 . 00/core
Depth measurement $ 15 . 00/core
Swiss Hammer
Mobilization of equipment $ 50 . 00/trip
Technician time $ 52 . 00/ hour
'� AitJarnran t� Assu � aztE� n . inc .
EXHIBIT " A"
ARDAMAN & ASSOCIATES , INC .
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTINGyySERVICES
( November 19 , 2009 through Ii�}eve rtAbUear 'f$ , 2010 )
ENGINEERING
Data Evaluation , Engineering Analysis ,
Design , Inspections , Field Monitoring , etc.
Principal Engineer Per Hour $ 125 . 00
Senior Project Engineer ( P . E . / Branch Manager) Per Hour $ 105 . 00
Project Engineer Per Hour $85 . 00
Staff Engineer Per Hour $75 . 00
CONSTRUCTION MONITORING
AND FIELD TESTING
Senior Field Technician Per Hour $52 . 00
Field Technician Per Hour $44 . 00
SUPPORT PERSONNEL
Senior Technical Draftsman Per Hour $52 . 00
Technical Draftsman I Per Hour $44 . 00
Technical Secretary Per Hour $42 . 00
11W 7M Andaman & Ass<ocia ( es , Inc
EXHIBIT " A "
ARDAMAN & ASSOCIATES , INC .
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
rU0-rLi li y
( November 19 , 2009 through NevcniFier 18 , 2010 ) --«- -. 5 _
CLASSIFICATION TESTS
Moisture Content (ASTM D-2216 ) Each $ 15 . 00
Organic Content
• Loss on Ignition (ASTM D -2974 ) Each $ 30 . 00
• Wet Combustion (AASHTO T- 194 ) Each $ 95 . 00
Unit Weight/Classification ( Undisturbed Sample ) Each $48 . 00
Grain Size Distribution
• Sieve Analysis (ASTM D -421 , D -422 ) Each $65 . 00
• Percent Fines (ASTM D - 1140) Each $30 . 00
• Hydrometer Analysis (ASTM D -422 ) Each $ 85 . 00
Atterberg Limits (ASTM D -4318 )
• Plasticity Index Less than 150 % Per Set $ 105 . 00
• Plasticity Index Greater than 150 % Add 'I Per Set $ 80 . 00
Shrinkage Limit (ASTM D -4943 ) Each $75 . 00
Specific Gravity (ASTM D-854 ) Each $65 . 00
Los Angeles Abrasion Each $350 . 00
COMPACTION TESTS
Standard (ASTM D -698 ) or Modified Proctor (ASTM D - 1557 ) Per Test $80 . 00
Maximum-Minimum Density (ASTM D -4253 , D -4254 ) Per Set $ 95 . 00
Limerock Bearing Ratio ( 3 points ) Per Test $275 . 00
CONSOLIDATION TESTS
Incremental Consolidation Test (ASTM D-2435 )
• Up to Ten Load - Unload Increments Per Test $460 . 00
• More than Ten Load - Unload Increments Per Add 'I Increment $ 50 . 00
Constant Rate of Strain Consolidation Test (ASTM D -4186 ) Each $560 . 00
PERMEABILITY TESTS
Permeability Test on Sand Each $ 135 . 00
Permeability Test on Fine Grained Soil
• k > 10-8cm/sec Each $225 . 00
• k < 10-8cm/sec Each $ 350 . 00
Test Duration Greater than 7 days Per Add ' I Increment $20 . 00
Permeation with Fluids Other Than Water Add ' I Per Test $ 115 . 00
STRENGTH TESTS
Strength Index Tests (Torvane , Penetrometer, etc . ) Each $ 12 . 00
Vane Shear Test Each $22 . 00
Unconfined Compression Test (ASTM D -2166 )
• Strength Only Each $ 50 . 00
• With Stress - Strain Curve Each $ 85 . 00
Triaxial Tests :
• Unconsolidated - Undrained (ASTM D -2850 ) Each $ 185 . 00
• Unconsolidated - Undrained (with pore pressure response ) Each $420 . 00
• Consolidated - Undrained (with pore pressure measurement ) Each $420 . 00
• Consolidated - Drained on Sands Each $ 320 . 00
• Consolidated - Drained on Fine Grained Soils Each $480 . 00
• Use of Fluids Other Than Water Add 'I Per Test $ 145 . 00
Direct Shear Tests ( Coarse Grained Soils )
• Conventional 2 . 3 " Box Shear Per Normal Load $230 . 00
• With Stress Reversals Per Normal Load $ 340 . 00
• Conventional 12 " Box Shear Per Normal Load $430 . 00
• Set- Up Charge for Geosynthetics Add ' I Per Normal Load $ 70 . 00
Ardaman & Associates . Inc.
EXHIBIT " A"
ARDAMAN & ASSOCIATES , INC .
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
Fe brvar ��
( November 19 , 2009 through Nevember `� zy 8 , 2010 ) --��-
CHEMICAL TESTS
pH Each $ 15 . 00
Specific Conductance Each $ 12 . 00
Fluoride Each $22 . 00
Sulfate Each $42 . 00
Chloride Each $42 . 00
Soil pH Each $25 . 00
Soil Specific Conductance Each $42 . 00
Soil Resistivity (ASTM G- 57 ) Each $42 . 00
Carbonate Content Each $80 . 00
Corrosion Series ( pH , sulfate , chloride and resistivity) Each $ 155 . 00
CHEMICAL LABORATORY SUBCONSULTANT SERVICES
Laboratory Analytical Testing Cost + 12 %
GEOSYNTHETICS
Geomembrane Thickness (ASTM D - 1593 ) Per Sample $ 30 . 00
Geomembrane Density (ASTM D -792 ) Per Sample $46 . 00
Geomembrane Tensile Strength (ASTM D -638 ) , Machine and
Transverse Direction Per Set $ 110 . 00
Geomembrane Tear Resistance (ASTM D- 1004 ) , Machine and
Transverse Direction Per Set $75 . 00
Weld Peel and Shear (ASTM D -413 , D-882 ) Per Set $82 . 00
Geotextile Tensile Strength (ASTM D-4632 ) Per Set $ 110 . 00
Geotextile Trapezoidal Tear (ASTM D -4533 ) Per Set $ 130 . 00
SAMPLE PREPARATION AND SPECIAL TESTS
Preparation of Samples for Testing ( e . g . , crushing for carbonate content determination , filtering of clayey soil
for
chemical tests ) will be charged at $25 . 00 per sample . Prices for other tests on geomembranes and geotextiles will be
determined per project based upon technician man- hours and other considerations .
ow in Ard ., m ,w x As >GClciieS , Inc
EXHIBIT " A"
ARDAMAN & ASSOCIATES , INC .
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTINGUSERVICES
r�e 10 Jl
( November 19 , 2009 through Nevembm t , 2010
MOBILIZATION AND DEMOBILIZATION
• Men and Equipment $ 250 . 00
• Portable Barge Per Job $ 5 , 000 . 00 Minimum
STANDARD DRILLING
All Terrain Vehicle Add ' I Price Per LF $ 1 . 50
Auger Borings (4- inch ) Per Lineal Foot $9 . 00
Wash Borings - Cuttings Only ( up to 3 inch )
• Soil drilling Per Lineal Foot $8 . 00
• Rock drilling Per Lineal Foot $ 12 . 00
Standard Penetration Test ( SPT) Borings
(ASTM D - 1586 ) in soil ( N -values < 50) :
• from surface to 25 feet Per Lineal Foot $ 12 . 00
• from 25 feet to 50 feet Per Lineal Foot $ 13 . 00
• from 50 feet to 100 feet Per Lineal Foot $ 14 . 50
• from 100 feet to 125 feet Per Lineal Foot $ 18 . 00
• from 125 feet to 150 feet Per Lineal Foot $22 . 00
Standard Penetration Test (SPT) Borings in
high resistance soil/rock ( N -values > 50 ) Add 'I Price Per LF $ 3 . 50
Furnish , Install , and Remove Casing ( up to 4- inch ) :
• from surface to 50 feet Per Lineal Foot $ 7 . 50
• from 50 feet to 100 feet Per Lineal Foot $ 9 . 00
• from 100 feet to 150 feet Per Lineal Foot $ 10 . 50
Drilling (Time Basis )/2 man-crew Per Crew- Hour $ 145 . 00
Drilling (Time Basis )/3 man-crew Per Crew- Hour $ 170 . 00
Support Water Truck (Time Basis ) Per Day $ 120 . 00
Rock Coring ( N or H size )
• from surface to 50 feet Per Lineal Foot $26 . 00
• from 50 feet to 100 feet Per Lineal Foot $28 . 00
• from 100 feet to 150 feet Per Lineal Foot $32 . 00
Field Permeability Per Test $ 350 . 00
SAMPLING
Additional SPT Sampling :
• from 10 feet to 25 feet Per Additional Sample $23 . 00
• from 26 feet to 50 feet Per Additional Sample $26 . 00
• from 51 feet to 100 feet Per Additional Sample $29 . 00
• from 101 feet to 125 feet Per Additional Sample $ 34 . 00
• from 126 feet to 150 feet Per Additional Sample $39 . 00
Undisturbed Samples :
• Shelby Tube Per Sample $ 100 . 00
• Fixed - Piston Shelby, Osterberg , Pitcher Per Sample $ 110 . 00
SOUNDINGS
Electric Dutch Cone Soundings Per Lineal Foot $9 . 50
Piezocone Soundings Per Lineal Foot $ 10 . 50
Muck Probing/Clay Sampling Per Crew Hour $ 120 . 00
Cone/Piezoprobe Soundings ( Time Basis ) Per Crew Hour $ 170 . 00
Piezoprobe Dissipation Monitoring Per Crew Hour $ 130 . 00
OTHER CHARGES
Clearing Difficult Access , Hole Location and Set- Up Per Crew- Hour $ 125 . 00
Standby Time Per Crew- Hour $ 125 . 00
Piezometer and Well Installation ( plus materials ) Per Crew- Hour $ 140 . 00
Bore Hole Grouting and Sealing ( plus materials ) Per Crew- Hour $ 140 . 00
Well Clearing /Sensitivity/Water Level Per Crew- Hour $ 125 . 00
Air Boat Use Per Day $ 300 . 00
Instrumentation Unit Use Per Day $ 150 . 00
�Materials Per Joh At Cost + 12 "
Je ' t'� �v(v ' & Associ ite' s , Inc . Nomi , fl drilling
E3 c, ult : NfrWI ll �lrillin � i � � rr; tuiir 1 5
EXHIBIT " A"
ARDAMAN & ASSOCIATES , INC .
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
(='e 6 ro cc��x.rcc1� j
( November 19 , 2009 through x'18 , 2010 )
ENVIRONMENTAL SITE SITE ASSESSMENTS
Phase I Environmental Site Assessments
Tracts 50 acres or less (contiguous properties or per individual tract) $ 2 , 100 . 00
Tracts between 51 and 500 acres ( contiguous properties ) $2 , 600 . 00
Tracts greater than 500 acres varies
Phase II Environmental Site Assessments varies
Analytical Laboratory testing for hazardous or petroleum contamination
(soil , sediment and groundwater) cost + 15 %
OTHER RELATED ENVIROMENTAL DRILLING CHARGES
Support Water Truck Per Day $ 150 . 00
Drumming Contaminated Soil /Drilling Fluids
In 55 gallon drums ( Disposal not Included ) Per Drum $ 150 . 00
Drum Disposal Per Drum Varies
Visqueen ( 100 feet by 20 feet) Per Roll $85 . 00
MONITORING WELL INSTALLATION
Temporary 2 -inch PVC Wellpoint ( Piezometer)) Per Foot $ 18 . 00
2- inch PVC Per Foot $35 . 00
NOTE : Double cased deep monitoring well (above cost x 2 )
VAULT/PAD INTALLATION — MONITORING WELLS
Well Size Vault Size
2 " 8" w/pad $275 . 00
4" 12 " w/pad $ 380 . 00
2 " or 4" Above ground riser w/pad $275 . 00
DIRECT PUSH GROUNDWATER SAMPLING
Direct Push Sampler ( minimum 1 day) Per Day $ 1 , 500 . 00
ENVIRONMENTAL FIELD TESTING SERVICES
Slug Injection/Withdrawal Permeability Test Each $250.00 + $80.00hour
Double Ring Infiltrometer Test (ASTM D -3385-75 ) Each $ 500 . 00
SPECIAL DRILLING/SOUNDING
Prices for special drilling ( barge drilling ; air boat sampling ; amphibious drilling ; NO wire line coring ; large
diameter
borings ; drilling in corrosive , contaminated or hazardous materials ; drilling at great depths ; installing large diameter
temporary casing ; etc . ) field vane testing , and other specialized sampling or field tests will be determined per project
.
INSTRUMENTATION
Prices for installation of monitor wells , inclinometers and settlement devices and prices for performing field permeability
and packer tests will be determined per project .
IM No A tan ai & Assoc : rit : ; . inc .
EXHIBIT " A"
ARDAMAN & ASSOCIATES , INC .
FEE SCHEDULE
INDIAN RIVER COUNTY
GEOTECHNICAL AND ENVIRONMENTAL ENGINEERING
AND CONSTRUCTION MATERIALS TESTING SERVICES
Feld roti rLl
( November 19 , 2009 through November 8 , 2010 ) I ry '
GENERAL FIELD EQUIPMENT :
Field Gas Chromatograph Per Day $300 . 00
Data Logger Per Day $240 . 00
Organic Vapor Analyzer ( OVA 128 or Gastech ) Per Day $ 120 . 00
Photo Ionization Detector ( Photovac Tip) Per Day $ 110 . 00
Generator Per Day $ 95 . 00
Steam Cleaner Per Day $ 100 . 00
Surveying Equipment (Water Table Elevations ) Per Day $ 55 . 00
Centrifugal Development Pump Per Day $ 50 . 00
Submersible Development Pump Per Day $ 100 . 00
Peristaltic Purging Pump Per Day $40 . 00
Magnetometer Per Day $ 35 . 00
Product/Water Interface Probe Per Day $35 . 00
pH /Conductivity Meter Per Day $25 . 00
Turbidity Meter Per Day $55 . 00
Water Level Indicator Per Day $20 . 00
Bailer Usage (Stainless Steel or Teflon- Per Each ) Per Day $ 18 . 00
Measuring Wheel Per Day $ 8 . 00
35 mm Camera Per Day $ 8 . 00
Barricade ( per unit) Per Day $ 3 . 00
Concrete Saw Per Day $ 100 . 00
EXPENDABLE SUPPLIES :
High Capacity (0 . 45 micron ) Filter Each $22 . 00
Disposable Teflon Bailer Each $ 18 . 00
Disposable Polyethylene Bailer Each $ 13 . 00
Isopropyl Alcohol (decontamination ) Per Gallon $ 15 . 00
Deionized Water (decontamination ) Per Five Gallon $ 14 . 00
16 oz . Soil Jars (soil headspace analysis ) Per Box of 12 $ 10 . 00
Tygon Tubing Per Foot $2 . 50
Polyethylene Tubing Per Foot $ . 60
55-gallon Drum Each $ 65 . 00
HEAVY EQUIPMENT :
Vacuum Truck , Dump Truck , Crane , Excavator,
Trackhoe , Backhoe , etc . Per Job Cost + 15%
REMEDIATION EQUIPMENT :
Cost is based on type of equipment and duration of project . Cost to be determined on project by project basis .
.16 Ardkrnan & Assoc atels , Inc .