CERTIFICATE OF SUBSTANTIAL COMPLETION
PROJECT Fellsmere Convenience Center
DATE OF ISSUANCE : 09-28-09
OWNER Indian River County Solid Waste Dis osal District
OWNER ' S Contract No . 2008017 ENGINEER ' S Project No . 131858
CONTRACTOR Barth Construction ENGINEER Brown and Caldwell
This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the
following specified parts thereof.
Completed Phase I and Phase lI with City of Fellsmere CO and IRC Engineering acceptance
To : Indian River County and Indian River County Solid Waste Disposal District
OWNER
And To : Barth Construction
CONTRACTOR
The Work to which this Certificate applies has been inspected by authorized representatives of OWNER,
CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially complete in
accordance with the contract Documents on
.September 2 2009 (per change order number one approved 09 - 15 -09
DATE OF SUBSTANTIAL COMPLETION
A tentative list of items to be completed or corrected is attached hereto (N/A -- Punchlist Completed) . This list
may not be all -inclusive, and the failure to include an item in it does not alter the
responsibility of
CONTRACTOR to complete all the Work in accordance with the Contract Documents . The items in the
tentative list shall be completed or corrected by CONTRACTOR withinN( /A) Days ofthe above date of
Substantial Completion .
( Continued on next page)
FELLSMERE CONVENIENCE CENTER 00800 — Supplementary Conditions
00800 - 1
From the date of Substantial Completion, the responsibilities between OWNER and CONTRACTOR for
security, operation , safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as
follows :
RESPONSIBILITIES :
OWNER: THE OWNER IS TAKING OVER FULL OPERATION OF THE FACILITY
CONTRACTOR : THE CONTRACTOR HAS RELINQUISHED ALL CONTROL TO THE OWNER
PROJECT HAS ENTERED INTO WARRANTY PHASE
The following documents are attached to and made a part of this Certificate :
(N/A)
[For items to he attached see definition of Substantial Completion as supplemented and other specifically noted
conditions precedent to achieving Substantial Completion as required by Contract Documents.]
This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents
nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract
Documents .
Executed by ENGINEER on 12 k
ENGINEER : i3�OG✓� /�rt/D GfIZ06t ✓arZC�
By:
(Authorized Signature)
CONTRACTOR accepts this Certificate of Substantial Completion on , 20
CONTRACTOR .
By:
OWNER accepts this Certificate of Substantial Completion on 20
OWNER . Indian River CDunty and In nunt Solid Waste
/ Disposalis roc
B : 6 ,
( uthorized Signature) Wes ley S . Davis , Chairman
FELLSMERE CONVENIENCE CENTER 00800 — Supplementary Conditions
00800 - 2