HomeMy WebLinkAbout2009-253 Q10a011aq Sd
INDIAN RIVER COUNTY A40 ! ;t S3
OLD DIXIE HIGHWAY BRIDGE OVER SOUTH RELIEF CANAL
AMENDMENT NO . 2 TO WORK ORDER It 9 TO THE PROFESSIONAL BRIDGE
DESIGN SERVICES AGREEMENT FOR ANNUAL BRIDGE SERVICES BETWEEN
BRIDGE DESIGN ASSOCIATES , INC . AND INDIAN RIVER COUNTY , FLORIDA .
This is an amendment to WORK ORDER #9 dated July 8 , 2008 to the agreement
(AGREEMENT ) dated October 3 , 2006 for Professional Bridge Design Services Annual
Contract between Bridge Design Associates , Inc . (ENGINEER ) and Indian River County
( COUNTY ) .
AMENDMENT DESCRIPTION
This Amendment includes the following :
The ENGINEER will perform the necessary engineering services to the Old Dixie Highway
Bridge over South Relief Canal Project by revising the plans to include a separate set of plans for
a 6" diameter directional bore under the South Relief canal , attachment of an 8 " diameter water
main to the new bridge and water main / force main deflections to avoid conflicts with drainage
structures .
" SECTION I — PROJECT LIMITS AND DESCRIPTION"
The project is located approximately 3300 feet north Along Old Dixie Highway between 2 °d
Street SW and P Place .
The work will include the replacement of the Old Dixie Highway Bridge over the South Relief
Canal , approximately 3300 feet of road and drainage improvements to the approaches of the
bridge , stormwater treatment ponds , utility improvements and other work necessary to complete
the project .
" SECTION III — SCOPE OF SERVICES " is being modified to include the following :
The preparation of plans and specifications for the water main and sanitary sewer force main
improvements associated with the Old Dixie Highway Bridge replacement over South Relief
Canal and associated road and drainage improvements . The plans will include a 6" diameter
directional bore under the South Relief canal , attachment of an 8 " diameter water main to the
new bridge and water main / force main deflections to avoid conflicts with drainage structures .
" SECTION IV — TIME FOR COMPLETION "
The final plans shall be completed and all appropriate permits obtained within six weeks after
notice to proceed .
" SECTION V — COMPENSATION " is being modified to incorporate the following :
The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered
pursuant to this Agreement fees inclusive of expenses in accordance with the following :
Bridge Design Associates , Inc . Lump Sum $ 84315 . 00
TOTAL Amendment No . 2 $ 8315 . 00
S 'V'_001 JubaA03 S { N Old Disk orct 5onah RelictA( lin'r ,p ,ndrnreAAmcndmcnlN2¢ WCN19VAmendmentk_lo R'O#9.duc
The AGREEMENT is hereby amended as specifically set forth here in . All other sections of the
AGREEMENT shall remain in full force and effect and are incorporated herein .
This Amendment No . 2 to the AGREEMENT regardless of where executed , shall be governed
by and constructed by the laws of the State of Florida .
In witness whereof the parties have executed this Amendment this 22nd day of
September 12009 .
BRIDGE DESIGN ASSOCIATES INDIAN RIVER COUNTY , FLORIDA
1402 ROYAL PALM BEACH BLVD . BOARD OF COUNTY
COMMISSIONERS
BUILDING 200
ROYAL PA BEACH , FL 33411
By : B _
rian C . Rheault, P . E . 4e.slevy S . Davis , -Chairman
President Board of Co un 'y Corumissl* oners
I �
Attest : 1 VA Attest :
Deputy Clerk of the Cou& a ; t
Attest : `'�— Accepte .
11 Cou ty Administrator
Approved is to Form and Legal Sufficiency :
IL /C
r
County Attorney
page 2 of .)
S :A2003-Jobs\03- 538 Old Dixie over South ReliclWonespondence\Amendment#2toWO#9\Amendment#2toWO#9 . doc
BRIDGE DESIGN ASSOCIATES , INC .
CONSULTING ENGINEERS
BRIAN C. RHEAULT, P.E.
President
August 5 , 2009
Indian River County
180027 1h Street
Vero Beach , Florida 32960
ATTENTION : Chris Kafer, P . E .
REGARDING : Old Dixie Highway over South Relief Canal
Utilities Services
PROJECT NO . : 03-538
Dear Chris ,
Pursuant to your request, Bridge Design Associates , Inc. can provide the necessary
engineering services for the above referenced project .
It is our understanding the County desires the force main to bore under the canal rather
than to hang the force main from the bridge .
Our fees for the above services will be as follows :
Bridge Design Associates , Inc. $ 290 . 00
Arcadis $ 8 , 025000
TOTAL $ 8 , 315 . 00
If you have any questions please give me a call .
Respectfully ,
BRIDGE DESIGN ASSOCIATES , INC .
Brian C . Rheault , P . E .
President
BCR: kedSA2003-Jobs\03-538 Old Dixie over South Relief\Correspondence\proposal 0&05-09 .wpd
1402 Royal Palm Beach Boulevard • Building 200 • Royal Palm Beach , Florida 33411
( 561 ) 686 -3660 • Fax : ( 561 ) 791 - 1995
OV, ARCADIS
ARCADIS
Infrastructure, environment, facilities 2081 Vista Parkway
West Palm Beach
Florida 33411
Tel 561 .697. 7000
Mr. Brian Rheault , P . E .
Fax 561 .697 .7751
Bridge Design Associates www. arcadismus.com
1402 Royal Palm Beach Boulevard
Building 200
Royal Palm Beach , Florida 33411
Transportation
Subject:
Old Dixie Highway over South Relief Canal
Dear Mr, Rheault:
Date :
We are pleased to submit this proposal for professional engineering services for the August 4 , 2009
modification to the plans for Old Dixie Highway over the South Relief Canal . The
current plans for the project show the existing sanitary sewer force main to be Contact:
relocated to the proposed bridge shelf. As requested by Indian River County , Henry Deibel
ARCADIS will modify the plans to detail a sanitary sewer directional bore crossing
Phone:
under the South Relief Canal . ( 561 ) 607-7075
ARCADIS will submit the revised plans to the County utilities division and the Florida Email:
Department of environmental Protection for review and approval . Hank. deibel@arcadis.
us . com
Compensation for these services will be as follows :
Our ref:
Engineering Design and Permitting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 71775 . 00
Florida License Numbers
Permit Application Fees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . $ 250 . 00 Engineering
EB00007917
Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . $ 8 , 025 .00 Geology
GB564
We thank you for the opportunity to submit this proposal . Please feel free to contact Landscape Architecture
our office if you have any questions or require any additional information . LC26000269
Surveying
Sincerely , L67062
ARCADIS
Henry W. Deibel , Jr. , P , E ,
Associate Vice President
Imagine the result
g:\Inr supporttadmin\marketing\proposals\wpb\2009\old dixie highway utility modifcations 84-09 doc