HomeMy WebLinkAbout2008-313 INDIAN RIVER COUNTY
5 `' STREET SW BRIDGE OVER LATERAL "C" CANAL
43`d AVENUE BRIDGE OVER SOUTH RELIEF CANAL AND
OLD DIXIE HIGHWAY BRIDGE OVER SOUTH RELIEF CANAL
AMENDMENT NO . 3 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING
SERVICES AGREEMENT BETWEEN BRIDGE DESIGN ASSOCIATES , INC . AND
INDIAN RIVER COUNTY, FLORIDA.
This is an amendment to the existing Engineering/Land Surveying Services Agreement
(AGREEMENT) dated March 18 , 2003 between Bridge Design Associates , Inc . (ENGINEER)
and Indian River County (COUNTY) . This amendment addresses changes in "Section I" —
"Project Limits and Description" , " Section III - Scope of Services " and " Section V -
Compensation " .
Amendment Description
This Amendment includes the following :
The ENGINEER will perform the necessary engineering services to the Old Dixie Highway
Bridge over South Relief Canal Project by upsizing the drainage pipes to take in offsite drainage
areas .
"SECTION I — PROJECT LIMITS AND DESCRIPTION
The project is located approximately 3300 feet north Along Old Dixie Highway between 2nd
Street SW and 3 `d Place .
The Old Dixie Highway road plans will be modified by upsizing the drainage pipes to take in
offsite drainage areas extending from SW 6th court to Old Dixie Highway between 2nd Street SW
and 1st Street SW . On the north end of the Project, the drainage system will be modified to
include sufficient capacity to convey runoff from the Old Dixie Highway right-of- way to 3rd
Place . On both ends of the Project , the additional drainage areas will be conveyed to the
proposed dry retention areas .
" SECTION III — SCOPE OF SERVICES " is being modified to incorporate the following :
The permits and roadway portion of the plans for the improvement will be modified to take in
offsite drainage areas . The drainage system will be modified to include sufficient capacity to
convey runoff from the Old Dixie Highway right- of-way and off site drainage areas .
Permit modification applications will be prepared and submitted to the St . Johns River Water
Management District , Indian River Farms Water Control District, Corps of Engineers ,
Department of Environmental Regulation and any other applicable permits as outlined in the
original AGREEMENT .
S :APERSONNELAKimV2tN1H\September2t918VAmendment#3.dnc
•
"SECTION IV — COMPENSATION " is being modified to incorporate the following :
The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered
pursuant to this Agreement fees inclusive of expenses in accordance with the following :
Bridge Design Associates , Inc . Lump Sum $ 119110 . 53
Permit Application Fees (Not To Exceed) $ 350 , 00
TOTAL Amendment No . 3 $ 119460 . 53
There are no soil borings , sketches and legal descriptions , raster images , or as -built plans
included in the above fee .
The AGREEMENT is hereby amended as specifically set forth here in . All other sections of the
AGREEMENT shall remain in full force and effect and are incorporated herein .
This Amendment No . 3 to the AGREEMENT regardless of where executed, shall be governed
by and constructed by the laws of the State of Florida.
In witness whereof the parties have executed this Amendment this 23rd day of
September , 2008 .
BRIDGE DESIGN ASSOCIATES INDIAN RIVER COUNTY, FLORIDA
1402 ROYAL PALM BEACH BLVD . BOARD OF COUNTY COMMISSIONERS
BUILDING 200
ROYAL P BEACH, FL 33411
By : By . —
Brian C . Rheault, P .E . Wesley S., D.,ayis, ice- Chgiftan
Lident Board of County Commissioners
Attest : /�7 Attest :
Deputy Clerk of the Court
Attest : Accepted : _
Cou ty Administrator
Approveda to Fo m an e IS ciency :
r
County Attorney
Page 2 of 2
SAPERS0NNEL\Kim\2008\September 2008\Amendment#3 . doc
5617911995 Line 1 01 . 23 : 06 p . m . 09 - 10 - 2008 218
BRIDGE DESIGN ASSOCIATES , INC .
i
C ON S U LT ING E N G IN E E R S
BRIAN C. RHEAULT, P.E.
President
i
September 10 , 2008 j
Indian River County
1800 27' Street
Vero Beach , Florida 32960
ATTENTION : Mike Nixon
i
REGARDING : Old Dixie Highway over South Relief Canal / Revised Proposal
PROJECT NO . : 03-538
Dear Mike :
Pursuant to your request, Bridge Design Associates , Inc. and Arcadis can perform the requested
scope of work as follows :
We will modify the drainage design to upsize the drainage pipes to take in offside drainage areas
extending from SW 6'h Court to Old Dixie Highway between SW 2"d Street and SW I " Street, On
the north end of the project, the drainage system will be modified to include sufficient capacity to
convey runoff from the Old Dixie Highway right-of-way from the north project limit to 3'd Place . The
plans will be modified to incorporate the appropriate drainage improvements . On both ends of the
project, the additional drainage areas will be conveyed to the proposed dry storm water detention
areas . The size of the detention areas will remain as currently proposed .
Our fees will be as follows :
Bridge Design Associates, Inc. $ 832 . 30
Arcadis / Design & Permitting $ 101278 . 23
Permitting Fees 350. 00
TOTAL $ 117460. 53
If you have any questions , please give me a call .
Respectfully,
BRIDGE DESIGN ASSOCIATES, INC .
i
lee
i
Brian C . Rheault, P . E .
President
BCR: kedS : 12003-Jobs10M38 Old Dixie over South RelieflCorrespondencelproposal 09- 10-08 . wpd
1402 Royal Palm Beach Boulevard • Building 200 • Royal Palm Beach, Florida . 33411
(561 ) 686-3660 • Fax : (561 ) 791 -1995
5617911995 Line 1 _..__. .
01 : 23 : 27 p . m . 09 - 10- 2008 3 /8
BRIDGE DESIGN ASSOCIATES. INC.
OLD DIXIE HIGHWAY OVER SOUTH RELIEF CANA:
I
September 10, 2008
HOURLY BREAKDOWN OF SERVICES j
EXHIBIT "A"
CHIEF SENIOR ENGINEER ENGINEER CAD TOTAL
ENGINEER ENGINEER INTERN TECHNICIAN TECHNICIAN HOURS COST pp
LABOR
ACTIVfIY d'
BY BY IMy
$130.50 $110.20 $62.35ACTIVITY ACTMTY
$62.35 5 $89.90
DESIGN j
Plan Mcdifigtions 30
2.0 5.0 $571 .30
Permit Coordination 2.0
$261 .00
i
i
TOTAL MANHOURS '
510 0.0 0.0 0.0 2.0
5.0
DIRECT LABOR COST $652.50
$0.00 $0.00 $0.00 $179.80
$832.30
ENGINEERING FEES $832.30
I�
I
t
I
SA2003-Joba103-536 Old Me over South RefieACorrespondencelproposel modification 09-10.08
i
ESTIMATE OF WORK EFFORT FOR ENGINEERING
Old Dixie Highway & South Relief Canal
O
O
C
O
v�
O PROJECT MANAGER PROJECT ENGINEER Sfl. CA OD OPERATOR ACTIVITY TOTAL
MAN HOURLY MAN HOURLYMAN I HOURLY MAN
H E S RATEHOURS
DESIGN ANALYSIS '
� 64.90 S 48.(18 $ 20.00
a
DRAINAGE ANALYSIS - $ 64.90 24.0 $ 48.08 IF $ 20.00 24.D
c+t ROADWAY PLANS 5.0 64.90 13.0 $ 48.08 18.0 S 20.00 36.0
h
nl __ UTILITIES =64.90
S 48.0(1 S 20.00 _
PERMITTING 6-0 $ 48.08 - $ 20.00 20.0
c) SIGNNG & PAVEMENT
MARKING PLANS 4808 $ 20.00
SIGNALQATION PLANS $ 48.08 $ 2000
TOTALS tt _0 78.0 80.0
DESIGN ANALYSIS $ $
SIGDRAINAGE ANALYSIS $ - $ 1 . 153.92 $
ROADWAY PLANS $ 324.50 $ 625.04 S 360.00
UTILITIES $ $
PERMITTING $ 389.40 673.12 $
SIGNING & PAVEME
MARKING PLANS $ _ $ _ $
S $ $
TOTALS 5 773.90 5 2.452.08J. S 360.00 S 3,525 .98
BY COST FOR HOURLY
ACTIVITY ACTIVITY RATE
DESIGN ANALYSIS _ $ - #DIV10!
DRAINAGE ANALYSIS 24.D $ 1 , 153.92 48.08
ROADWAYPIANS 36-0 $ 1 ,309.54 36.38
UTILITIES $ #DNfOI
PERMITTING 20.0 $ 1 ,062.52 53.13
SIGNING & PAVEMENT
MARKING PLANS $ #DN/0!
SIGNALIZATION PLANS - $ VDIV/Q!
TOTALS _ 80.0 $ 3, 525.98 $44.07 Average per hoar
N
J
�n
"' oWo� Hy,,.,,ys so�:n aelrer c.rele-2r-oe.w: _
Lo
LTJ
Ln
ESTIMATE OF WORK EFFORT FOR ENGINEERING
Old Dixie Highway & South Releif Canal
0
O
N
O
7
O
Total Contract Cost Computations $ 3 , 525 . 98
Total Activity Salary Costs $ 3 . 525 . 98
a (a) Overhead Additives:
(a1 ) Combined OH Percent 165.00%
ri (a2 ) Combined OH Cost $ 5 817 87
_ Subtotal (Salary + Overhead)
( b) Operating Margin Percent $ 9 10. 00%
( b) Operating Margin Cost $ 934 . 38
Subtotal (Salary Related Cost) $ 10,278 . 23
Subtotal (Cost Elements of Basic Activities) $ 10,278.23
TOTAL LUMP SUM SUBCONTRACT AMOUNT $ _
REIMBURSABLE ITEMS ( Limiting Amount )
St . John River Water Management District Permit Fee $ 250.00
Indian River Farms Water Management District Permit Fees $ 100. 00
TOTAL REIMBURSABLE ITEMS $ 350 . 00
LUMP SUM =
Ln
Old Dixie Highway & South Relief Canal 8-27-08.xis
r
L7
i
r_•
Old Dixie Highway over Main Relief Canal
HIGHWAY PAGE 1 OF 3
C=
0
0
N
HIGHWAY TASK LIST
c�
CD ACTIVITY: A. ROADWAY PLANS PACKAGE SUBACTIVITY: 2 - DRAINAGE DESIGN & ANALYSIS
I ,
I
' E _
BASIS OF NO. OF NO. OF TOTAL PROJECT PROJECT
o.. TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS
0
1 . Design of Cross Drains Ea. 0
0
2 . Drainage Maps Sheet
0
3. Design of Outfall Ditches Ea. 0
4 . Ea. 0
5. Design of Storm Sewers Ea . 8 1 8 8.0
6. Design of Slormwater Retention- / Detention Fac. Ea. 2 4 8 8.0 revise flood routing calculations
7. Design of Special Drainage Systems L.S . 0
8. Preparation of Bridge Hydraulics Report Ea . 0
9. Draina a Design Report L.S . 1 8 8 8 -0
10 Investigate Outfall Requirements L.S . 0
11 Pond Sitigg Report L . S . 0
SUBTOTAL THIS SHEET 7 24 0 7 24 0
J
l7
v
U) _
U
In
Old Dixie Highway over Main Relief Canal
o_
r`
HIGHWAY PAGE 2 OF 3
o_
0
0
N
HIGHWAY TASK LIST
o ACTIVITY: A. ROADWAY PLANS PACKAGE SUBACTIVITY: 3 - ROADWAY PLANS
E
a BASIS OF NO. OF NO. OF TOTAL PROJECT PROJECT
TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS
N
ry 1 . Key Map Sheet
0
0
2 . Typical Section B Notes Sheet p
3. Summary of Quantities Each 0
4. Plan & Profiles Sheet 4 8 4 32 4.0 12 .0 16.0
5. Intersection Details Each p
6 . Intersection Profiles Sheet p
7. Sidestreet Profiles Sheet p
8. Drainage Structure Sheets Sheet 1 4 4 1 .0 1 .0 2.0
9. Miscellaneous Construction Details Sheet p
10. Summary of Drainage Structures Sheet 0
11 . Cross-Sections Ea. 0
12. Baseline Control Sheet 0
13 Cost Estimates Each
0
SUBTOTAL THIS SHEET 36 5 13 18
v
r
J
tLJ
G
7
L7
Old Dixie Highway over Main Relief Canal
HIGHWAY PAGE 3 OF 3 -
a�
O
O
rNt
c HIGHWAY TASK LIST
o ACTIVITY: q ROADWAY PLANS PACKAGE SUBACTIVITY: 5 - ENV. SERVICES / PERMITS
r
BASIS OF NO . OF NO. OF TOTAL PROJECT PROJECT
TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS
v
N 1 . Preliminary Field Review L .S. 0
0
2. Agency Coordination ( Pre App Meeting) LS_ 0
3. Establish Wetland Jurisdictional Lines L.S. p
4. Agency Field Review L-S. 0
Prepare Welland Resouce / Dredge & Fill Permit
5. Application L-S- 0
6. SJRWMD PermitApplicalion L.S, 1 8 8 2.0 6.0
7. Coordinalion & Follow-Up - RAI Responses L.S . 1 8 8 2.0 6.0
8. IRFWMD Permit Application L .S . 1 2 2 1 .0 1 .0
9. Coordination & Follow-Up - RAI Responses L.S. 1 2 2 1 .0 1 1 .0
10. Health Department L.S. 0
11 Mitigation Coordination and Meetings L.S . 0
SUBTOTAL THIS SHEETI 20 E6t 14 0
Ln
v)
r`
Lo
L7