Loading...
HomeMy WebLinkAbout2008-313 INDIAN RIVER COUNTY 5 `' STREET SW BRIDGE OVER LATERAL "C" CANAL 43`d AVENUE BRIDGE OVER SOUTH RELIEF CANAL AND OLD DIXIE HIGHWAY BRIDGE OVER SOUTH RELIEF CANAL AMENDMENT NO . 3 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING SERVICES AGREEMENT BETWEEN BRIDGE DESIGN ASSOCIATES , INC . AND INDIAN RIVER COUNTY, FLORIDA. This is an amendment to the existing Engineering/Land Surveying Services Agreement (AGREEMENT) dated March 18 , 2003 between Bridge Design Associates , Inc . (ENGINEER) and Indian River County (COUNTY) . This amendment addresses changes in "Section I" — "Project Limits and Description" , " Section III - Scope of Services " and " Section V - Compensation " . Amendment Description This Amendment includes the following : The ENGINEER will perform the necessary engineering services to the Old Dixie Highway Bridge over South Relief Canal Project by upsizing the drainage pipes to take in offsite drainage areas . "SECTION I — PROJECT LIMITS AND DESCRIPTION The project is located approximately 3300 feet north Along Old Dixie Highway between 2nd Street SW and 3 `d Place . The Old Dixie Highway road plans will be modified by upsizing the drainage pipes to take in offsite drainage areas extending from SW 6th court to Old Dixie Highway between 2nd Street SW and 1st Street SW . On the north end of the Project, the drainage system will be modified to include sufficient capacity to convey runoff from the Old Dixie Highway right-of- way to 3rd Place . On both ends of the Project , the additional drainage areas will be conveyed to the proposed dry retention areas . " SECTION III — SCOPE OF SERVICES " is being modified to incorporate the following : The permits and roadway portion of the plans for the improvement will be modified to take in offsite drainage areas . The drainage system will be modified to include sufficient capacity to convey runoff from the Old Dixie Highway right- of-way and off site drainage areas . Permit modification applications will be prepared and submitted to the St . Johns River Water Management District , Indian River Farms Water Control District, Corps of Engineers , Department of Environmental Regulation and any other applicable permits as outlined in the original AGREEMENT . S :APERSONNELAKimV2tN1H\September2t918VAmendment#3.dnc • "SECTION IV — COMPENSATION " is being modified to incorporate the following : The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered pursuant to this Agreement fees inclusive of expenses in accordance with the following : Bridge Design Associates , Inc . Lump Sum $ 119110 . 53 Permit Application Fees (Not To Exceed) $ 350 , 00 TOTAL Amendment No . 3 $ 119460 . 53 There are no soil borings , sketches and legal descriptions , raster images , or as -built plans included in the above fee . The AGREEMENT is hereby amended as specifically set forth here in . All other sections of the AGREEMENT shall remain in full force and effect and are incorporated herein . This Amendment No . 3 to the AGREEMENT regardless of where executed, shall be governed by and constructed by the laws of the State of Florida. In witness whereof the parties have executed this Amendment this 23rd day of September , 2008 . BRIDGE DESIGN ASSOCIATES INDIAN RIVER COUNTY, FLORIDA 1402 ROYAL PALM BEACH BLVD . BOARD OF COUNTY COMMISSIONERS BUILDING 200 ROYAL P BEACH, FL 33411 By : By . — Brian C . Rheault, P .E . Wesley S., D.,ayis, ice- Chgiftan Lident Board of County Commissioners Attest : /�7 Attest : Deputy Clerk of the Court Attest : Accepted : _ Cou ty Administrator Approveda to Fo m an e IS ciency : r County Attorney Page 2 of 2 SAPERS0NNEL\Kim\2008\September 2008\Amendment#3 . doc 5617911995 Line 1 01 . 23 : 06 p . m . 09 - 10 - 2008 218 BRIDGE DESIGN ASSOCIATES , INC . i C ON S U LT ING E N G IN E E R S BRIAN C. RHEAULT, P.E. President i September 10 , 2008 j Indian River County 1800 27' Street Vero Beach , Florida 32960 ATTENTION : Mike Nixon i REGARDING : Old Dixie Highway over South Relief Canal / Revised Proposal PROJECT NO . : 03-538 Dear Mike : Pursuant to your request, Bridge Design Associates , Inc. and Arcadis can perform the requested scope of work as follows : We will modify the drainage design to upsize the drainage pipes to take in offside drainage areas extending from SW 6'h Court to Old Dixie Highway between SW 2"d Street and SW I " Street, On the north end of the project, the drainage system will be modified to include sufficient capacity to convey runoff from the Old Dixie Highway right-of-way from the north project limit to 3'd Place . The plans will be modified to incorporate the appropriate drainage improvements . On both ends of the project, the additional drainage areas will be conveyed to the proposed dry storm water detention areas . The size of the detention areas will remain as currently proposed . Our fees will be as follows : Bridge Design Associates, Inc. $ 832 . 30 Arcadis / Design & Permitting $ 101278 . 23 Permitting Fees 350. 00 TOTAL $ 117460. 53 If you have any questions , please give me a call . Respectfully, BRIDGE DESIGN ASSOCIATES, INC . i lee i Brian C . Rheault, P . E . President BCR: kedS : 12003-Jobs10M38 Old Dixie over South RelieflCorrespondencelproposal 09- 10-08 . wpd 1402 Royal Palm Beach Boulevard • Building 200 • Royal Palm Beach, Florida . 33411 (561 ) 686-3660 • Fax : (561 ) 791 -1995 5617911995 Line 1 _..__. . 01 : 23 : 27 p . m . 09 - 10- 2008 3 /8 BRIDGE DESIGN ASSOCIATES. INC. OLD DIXIE HIGHWAY OVER SOUTH RELIEF CANA: I September 10, 2008 HOURLY BREAKDOWN OF SERVICES j EXHIBIT "A" CHIEF SENIOR ENGINEER ENGINEER CAD TOTAL ENGINEER ENGINEER INTERN TECHNICIAN TECHNICIAN HOURS COST pp LABOR ACTIVfIY d' BY BY IMy $130.50 $110.20 $62.35ACTIVITY ACTMTY $62.35 5 $89.90 DESIGN j Plan Mcdifigtions 30 2.0 5.0 $571 .30 Permit Coordination 2.0 $261 .00 i i TOTAL MANHOURS ' 510 0.0 0.0 0.0 2.0 5.0 DIRECT LABOR COST $652.50 $0.00 $0.00 $0.00 $179.80 $832.30 ENGINEERING FEES $832.30 I� I t I SA2003-Joba103-536 Old Me over South RefieACorrespondencelproposel modification 09-10.08 i ESTIMATE OF WORK EFFORT FOR ENGINEERING Old Dixie Highway & South Relief Canal O O C O v� O PROJECT MANAGER PROJECT ENGINEER Sfl. CA OD OPERATOR ACTIVITY TOTAL MAN HOURLY MAN HOURLYMAN I HOURLY MAN H E S RATEHOURS DESIGN ANALYSIS ' � 64.90 S 48.(18 $ 20.00 a DRAINAGE ANALYSIS - $ 64.90 24.0 $ 48.08 IF $ 20.00 24.D c+t ROADWAY PLANS 5.0 64.90 13.0 $ 48.08 18.0 S 20.00 36.0 h nl __ UTILITIES =64.90 S 48.0(1 S 20.00 _ PERMITTING 6-0 $ 48.08 - $ 20.00 20.0 c) SIGNNG & PAVEMENT MARKING PLANS 4808 $ 20.00 SIGNALQATION PLANS $ 48.08 $ 2000 TOTALS tt _0 78.0 80.0 DESIGN ANALYSIS $ $ SIGDRAINAGE ANALYSIS $ - $ 1 . 153.92 $ ROADWAY PLANS $ 324.50 $ 625.04 S 360.00 UTILITIES $ $ PERMITTING $ 389.40 673.12 $ SIGNING & PAVEME MARKING PLANS $ _ $ _ $ S $ $ TOTALS 5 773.90 5 2.452.08J. S 360.00 S 3,525 .98 BY COST FOR HOURLY ACTIVITY ACTIVITY RATE DESIGN ANALYSIS _ $ - #DIV10! DRAINAGE ANALYSIS 24.D $ 1 , 153.92 48.08 ROADWAYPIANS 36-0 $ 1 ,309.54 36.38 UTILITIES $ #DNfOI PERMITTING 20.0 $ 1 ,062.52 53.13 SIGNING & PAVEMENT MARKING PLANS $ #DN/0! SIGNALIZATION PLANS - $ VDIV/Q! TOTALS _ 80.0 $ 3, 525.98 $44.07 Average per hoar N J �n "' oWo� Hy,,.,,ys so�:n aelrer c.rele-2r-oe.w: _ Lo LTJ Ln ESTIMATE OF WORK EFFORT FOR ENGINEERING Old Dixie Highway & South Releif Canal 0 O N O 7 O Total Contract Cost Computations $ 3 , 525 . 98 Total Activity Salary Costs $ 3 . 525 . 98 a (a) Overhead Additives: (a1 ) Combined OH Percent 165.00% ri (a2 ) Combined OH Cost $ 5 817 87 _ Subtotal (Salary + Overhead) ( b) Operating Margin Percent $ 9 10. 00% ( b) Operating Margin Cost $ 934 . 38 Subtotal (Salary Related Cost) $ 10,278 . 23 Subtotal (Cost Elements of Basic Activities) $ 10,278.23 TOTAL LUMP SUM SUBCONTRACT AMOUNT $ _ REIMBURSABLE ITEMS ( Limiting Amount ) St . John River Water Management District Permit Fee $ 250.00 Indian River Farms Water Management District Permit Fees $ 100. 00 TOTAL REIMBURSABLE ITEMS $ 350 . 00 LUMP SUM = Ln Old Dixie Highway & South Relief Canal 8-27-08.xis r L7 i r_• Old Dixie Highway over Main Relief Canal HIGHWAY PAGE 1 OF 3 C= 0 0 N HIGHWAY TASK LIST c� CD ACTIVITY: A. ROADWAY PLANS PACKAGE SUBACTIVITY: 2 - DRAINAGE DESIGN & ANALYSIS I , I ' E _ BASIS OF NO. OF NO. OF TOTAL PROJECT PROJECT o.. TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS 0 1 . Design of Cross Drains Ea. 0 0 2 . Drainage Maps Sheet 0 3. Design of Outfall Ditches Ea. 0 4 . Ea. 0 5. Design of Storm Sewers Ea . 8 1 8 8.0 6. Design of Slormwater Retention- / Detention Fac. Ea. 2 4 8 8.0 revise flood routing calculations 7. Design of Special Drainage Systems L.S . 0 8. Preparation of Bridge Hydraulics Report Ea . 0 9. Draina a Design Report L.S . 1 8 8 8 -0 10 Investigate Outfall Requirements L.S . 0 11 Pond Sitigg Report L . S . 0 SUBTOTAL THIS SHEET 7 24 0 7 24 0 J l7 v U) _ U In Old Dixie Highway over Main Relief Canal o_ r` HIGHWAY PAGE 2 OF 3 o_ 0 0 N HIGHWAY TASK LIST o ACTIVITY: A. ROADWAY PLANS PACKAGE SUBACTIVITY: 3 - ROADWAY PLANS E a BASIS OF NO. OF NO. OF TOTAL PROJECT PROJECT TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS N ry 1 . Key Map Sheet 0 0 2 . Typical Section B Notes Sheet p 3. Summary of Quantities Each 0 4. Plan & Profiles Sheet 4 8 4 32 4.0 12 .0 16.0 5. Intersection Details Each p 6 . Intersection Profiles Sheet p 7. Sidestreet Profiles Sheet p 8. Drainage Structure Sheets Sheet 1 4 4 1 .0 1 .0 2.0 9. Miscellaneous Construction Details Sheet p 10. Summary of Drainage Structures Sheet 0 11 . Cross-Sections Ea. 0 12. Baseline Control Sheet 0 13 Cost Estimates Each 0 SUBTOTAL THIS SHEET 36 5 13 18 v r J tLJ G 7 L7 Old Dixie Highway over Main Relief Canal HIGHWAY PAGE 3 OF 3 - a� O O rNt c HIGHWAY TASK LIST o ACTIVITY: q ROADWAY PLANS PACKAGE SUBACTIVITY: 5 - ENV. SERVICES / PERMITS r BASIS OF NO . OF NO. OF TOTAL PROJECT PROJECT TASK ESTIMATE UNITS HOURS/UNIT SHEETS HOURS MANAGER ENGINEER SR. CADD REMARKS v N 1 . Preliminary Field Review L .S. 0 0 2. Agency Coordination ( Pre App Meeting) LS_ 0 3. Establish Wetland Jurisdictional Lines L.S. p 4. Agency Field Review L-S. 0 Prepare Welland Resouce / Dredge & Fill Permit 5. Application L-S- 0 6. SJRWMD PermitApplicalion L.S, 1 8 8 2.0 6.0 7. Coordinalion & Follow-Up - RAI Responses L.S . 1 8 8 2.0 6.0 8. IRFWMD Permit Application L .S . 1 2 2 1 .0 1 .0 9. Coordination & Follow-Up - RAI Responses L.S. 1 2 2 1 .0 1 1 .0 10. Health Department L.S. 0 11 Mitigation Coordination and Meetings L.S . 0 SUBTOTAL THIS SHEETI 20 E6t 14 0 Ln v) r` Lo L7