Loading...
HomeMy WebLinkAbout2008-222CZ)n8•A Board of County Commissioners, 1801 27th Street Vero Beach, Florida 32960 Telephone: (772) 5674000 FAX: 772-778=9391 WORK ORDER NO.9 (Engineering) FOR PROFESSIONAL BRIDGE DESIGN SERVICES AGREEMENT FOR ANNUAL BRIDGE DESIGN SERVICES CONTRACT WITH Bridge Design Associates, Inc. Indian River County Project No. 0206 This Work Order No. 9 is in accordance with the existing AGREEMENT dated October 3, 2006 between Bridge Design Associates, Inc. (ENGINEER) and Indian River County (COUNTY). This Work Order Number 9 amends the agreement as follows: SECTION I — PROJECT LIMITS Old Dixie Highway Bridge over South Relief Canal SECTION II — SCOPE OF SERVICES This Work Order No. 9 is for providing Construction Phase Service (Construction Engineering and Inspection) for the above mentioned project. SECTION III = TIME FOR COMPLETION During Bidding and Construction Phases. SECTION IV — COMPENSATION The COUNTY agrees to pay, and the ENGINEER agrees to accept, a fee for services rendered according to the "Scope of Services" identified in Section II and III of this Work Order Number 9, Hourly Not To Exceed $32,616.05. CADocuments and Settings\Administrator\Desktop\BCC_Bridge_Design_Work_Order_#9_06-30-08.doc PAGE TWO Work Order Number 9 Bridge Design Associates, Inc. June 30, 2008 The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein. IN WITNESS„WHEREOF the parties hereto have executed these presents this 8th day of _ July 2008, BRIDGE DESIGN ASSOCIATES, INC. BY: Title: kR l pe< Witnessed By: {1LR�/10 INDIAN RIVER COUIT'Y`; ILO]�IDA BOARD OF COUNT. -Y. CO KI' S10,D;ERS BY: SAND 110WD %IAIRPER90N Approved by the 1BCC J%�1y.-89 2008 tr ATTEST: 64T J ffrey K.' Bath Clerk of Circ0'C6iz`rt DEPUTY CLERK OA COURT UNTY WILLIAM G. COLLINS, II COUNTY ATTORNEY Approved as to Form and Legal Sufficiency C Documents and SettingsWdministrator\Desktop\BCC_Bridge_Design_Work_Order_#9_06-30-08.doc BRIDGE DESIGN ASSOCIATES, INC. June 24, 2008 Indian River County 184025 1h Street Vero Beach, Florida 32960 ATTENTION: REGARDING: PROJECT NO.: Dear Chris: Chris Kafer, P.E. Old Dixie Highway over South Relief Canal Construction Phase Services 03-538 BRIAN C. RHEAULT, P.E. President Pursuant to your request, Bridge Design Associates, Inc. can provide the necessary construction phase services at the above referenced project site. We propose to provide these services on an hourly, not to exceed basis. The attached Exhibit "A" is a manhour breakdown of tasks and commensurate fees. If you have any questions, please give me a call. Respectfully, BRIDGE DESIGN ASSOCIATES, INC. Brian C. Rheault, P.E. President BCR:kedS:\2003-Jobs\03-538 Old Dixie over South Reliet\Correspondence\proposal cps 01-31-08.wpd 1402 Royal Palm Beach Boulevard * Building 200 • Royal Palm Beach, Florida 33411 (561) 686-3660 0 Fax: (561) 791-1995 BRIDGE DESIGN ASSOCIATES, INC. OLD DIXIE HIGHWAY OVER SOUTH RELIEF CANAL June 24, 2008 HOURLY BREAKDOWN OF SERVICES EXHIBIT "A" 03-538 pro cps ENGINEERING FEES PDA Test TOTAL $26,316.05 $6,300.00 $32,616.05 ACTIVITY PROJECT MANAGER PROJECT ENGINEER CADD TECH FIELD REPT E.1. TOTAL HOURS BY ACTIVITY LABOR COST BY ACTIVITY $130.50 $110.20 $89.90 $62.35 Pre Construction Meeting 5.0 5.0 10.0 $1,203.50 Shop Drawing Reviews 8.0 16.0 24.0 $2,807.20 Pile Casting / Sheet Pile 2.0 8.0 10.0 $719.20 Pile Driving 16.0 80.0 96.0 1 $6,751.20 Pile Cas 16.0 24.0 40.0 $3,259.60 Pre -stressed decks - casting 8.0 16.0 24.0 $1,879.20 Pre -stressed decks - piacement 8.0 8.0 $498.80 Closure pours 8.0 8.0 $498.80 Post Tensioning 5.0 5.0 24.0 34.0 1 $2,699.90 End closure pours 8.0 8.0 $498.80 Sidewalks 16.0 16.0 $997.60 Barriers 16.0 16.0 $997.60 Approach slabs 8.0 8.0 $498.80 Approach slabs sidewalk 8.0 8.0 1 $498.80 Approach slabs barrier 8.0 8.0 $498.80 Final Inspection 5.0 5.0 10.0 $964.25 Final Report & Certification 8.0 8.0 $19044.00 TOTAL MANHOURS 31.0 68.0 0.0 237.0 336.0 DIRECT LABOR COST $4,045.50 $7,493.60 $0.00 $14,776.95 $26,316.05 03-538 pro cps ENGINEERING FEES PDA Test TOTAL $26,316.05 $6,300.00 $32,616.05