Change Order 3� S 22, c \"\ OUG s ( o
02,0- I 3
PROJECT (Name and address): CHANGE ORDER NUMBER: 014 OWNER:
Indian River County Jail Expansion DATE: November 8, 2007 ARCHITECT:
4055 41 st Avenue
Vero Beach, FL 32960 CONTRACTOR: ED
TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 04083 FIELD: ❑
Peter R. Brown Construction,]Inc. CONTRACT DATE: June 07, 2005
13830 58th Street North, Clearwater, FL CONTRACT FOR: General Construction OTHER: ❑
33760
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives)
Item 1 Provide all labor, materials and equipment to install a canopy at the sheriffs Office Auto Maintenance Garage
on.the west side:of the building. The design was per the County's requirements. Work includes providing signed and sealed
drawings for permitting, installing concrete footings, posts, decking and sealants. Canopy is to be 100 lineal feet long and
23 feet wide. Funding for this work is from the Project Budget and specifically the Contractor's Contingency.
TOTAL $78,925.00
Acceptance of this change order will not change the Guaranteed Maximum Price but the Contractors Contingency will be
reduced.by $78,925.00.
"elite project's substantial completion date of September 10, 2007 remains unchanged. This work will take place after that
date and will be substantially complete forty-five (45) days after delivery of materials.
The original Guaranteed.Maximum Price was $ 18,301 ,631 .00
The net change by previously authorized Change Orders $ (493,779.35)
The Guaranteed Maximum Price prior to this Change Order was $ 17,807,851 .65
The Guaranteed Maximum Price willbe unchanged by this Change Order in the amount of $ 0.00
The new Guaranteed Maximum Price including this Change Order will be $ 17,807,851 .65
The Contract Time will beunchanged by Zero ( 0 ) days.
The date of Substantial Completion as of the date of this Change Order therefore is September 10, 2007
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor; in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Clemons-Ri h rford & A sociates, Inc. Peter R. Brown Construction, Inc. Indian River County BOCC
ARCHIT (Firm name CONTRACTOR (Firm name) OWNER (Firm name)
2027 t masvilIeRd , T assee, FL 13830 58th Street North, Clearwater, FL 1801 27" Street
3 33760 Vero Beach, FL ..32960 , E _
- -ADD ADDRESS ADDRESS ��//jj'' , {1-1,1,
( i 4
( ign re) gnatu BY ('51naturre)
William D. Rutherford Bdazdo M. Vargas Birt dra* V6 >;`I5haiPin'zyj'
(Typed
re) (Typed name) (Typed name) -
L
DAT DATE DATE
AIA Document G701TM - 2001 . Copyright 01979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This A10
Document is protected by U.S. Copyright Law and International Treatles. Unauthorized reproduction or distribution of this AIA` Document, or any
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AIA software at 13:28:41 on 02/07/2008 under Order No.1 000337851 —1 which expires on 1/10/2009, and is not for resale.
User Nates: (2125370166)