Loading...
HomeMy WebLinkAbout2007-401 I I1LO / 0 -1 I {. C . I . AIA Document G701 � - 2001 Change Order PROJECT (Name and address) : CHANGE ORDER NUMBER: 015 OWNER: Indian River County Jail Expansion DATE: February 04, 2008 ARCHITECT: 4055 41 st Avenue Vero Beach, FL 32960 CONTRACTOR: TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 04083 FIELD: ❑ Peter R. Brown Construction, Inc. CONTRACT DATE: June 07, 2005 13830 58th Street North CONTRACT FOR: General Construction OTHER: ❑ Clearwater, FL 33760 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Provide all labor, materials and equipment to provide and install acoustic panels in the four (4) Dormitory Buildings in every otherjoist bay per Options A & B in Proposal Request #7 dated September 25, 2007 from CRA. The quote is for two hundred fifty-eight (258) panels thirty-two (32") inches wide by ninety-six (96") inches long. Work includes installing hat channels across joist for purpose of attaching acoustic panels. Funding for this work is from the Project Budget and specifically the Contractor's Contingency. TOTAL: $75 ,323 .00 The original Guaranteed Maximum Price was $ 18,301 ,631 .00 The net change by previously authorized Change Orders $ (493 .779.35) The Guaranteed Maximum Price priorto this Change Order was $ 17,807 .851 .65 The Guaranteed Maximum Price will be unchanged by this Change Order in the amount of $ 0.00 The new Guaranteed Maximum Price including this Change Order will be $ 17,807,851 .65 The Contract Time will be increased by Zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is September 10, 2007. NOTE : This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER, Clemons-Rutherford & oc ales, Inc. Peter R. Brown Construction , Inc. Indian River County BOC-C� ARCHITECT (Firmin rte) CONTRACTOR (Firm name) OWNER %Firm name) - 2027 Thomas Ale Rd.. T al ssee, F 13830 58th Street N r, Clearw er, FL : 8� 25th Street, Suite. N 118, V efo Beach, 32308 33760 PL 32960 ADDREADDRESS AGO FSS i u el BY (S _ ature) sie.wiure) William D. Rutherford Eduardo M. Vargas Sandra L. B��Yden (Typed name) (TSPed name) ( Typed nufne) DATE DATE DATE AIA Document G701m - 2001 . Copyright O 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING : This AIAe Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA* Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent passible under the law. This document was produced by AIA software at 16'37:12 on 02/12/2008 under Order No. 1000337851 _1 which expires on 1 /10/2009, and is not for resale. User Notes: (2320249868)