HomeMy WebLinkAbout2003-281 ORIGINAL
� gtVER Board of County Commissioners �y
1840 25th Street b 1
q Vero Beach , Florida 32960
Z i Telephone : ( 772 ) 567 -8000
FAX : 772 -778 -9391
LORt�P
October 8 , 2003
WORK ORDER No : 1
FOR
PROFESSIONAL SURVEYING SERVICES AGREEMENT
FOR ANNUAL SURVEYING AND MAPPING SERVICES CONTRACT
IRC PROJECT NO . 0390
WITH
BURDETTE & ASSOCIATES , INC .
SPECIFIC PURPOSE SURVEY FOR
8th Street and 74th Avenue
Roadway Design and Improvement Project
IRC Project No . 03- 107
Sections 7 , 8 , 12 , 13 , 17 , & 18
Township 33 South , Range 38 East
Indian River County , Florida
All services performed under this contract shall be supervised and certified by a
licensed Surveyor and Mapper registered with the State of Florida and staff
employed directly with your firm . All survey procedures and final submittals shall
meet or exceed Minimum Technical Standards for Specific Purpose and
Horizontal Control Survey' s as set forth in Florida Statues Chapter 61 G17- 6
Florida Administrative code pursuant to section 472 . 027 , Florida Statues .
Furthermore all services performed shall adhere to F . D . O . T . safety procedures
and guidelines for Land Surveyors .
Indian River County bases the following specifications on minimum requirements
for this particular project . If the consultant so desires to modify or " enhance "
these requirements all modifications shall be submitted in writing to the County
Surveyor for approval prior to proceeding with task .
Minimum Specification Requirements as follows :
FAEngineering\Capital Projects\0390-Annual Survey Contracts 2003 -2004\Burdett\0390 Burdette WO # 1 - 8th St, 74th Ave-mob . DOC
w
Page 2
8 `h Street and 74`h Ave
Specific Purpose Survey
Work Order No : 1
Burdett & Assoc .
SCOPE OF SERVICES
Project Limits :
8th Street from 1000 ' West of 74th Avenue to the centerline intersection of
8th Street and 66th Avenue
74th Avenue from 1000 ' South of 8th Street to 100 ' North of 12th Street .
This also includes the proposed realignment of 74th Avenue
12th Street from 74th Avenue West 100 '
(Total project length approximately 13/4 miles )
SECTION I : SPECIFIC PURPOSE (TOPOGRAPHIC ) SURVEY :
The Consultant will prepare a Specific Purpose Survey , at a scale of 1 " = 40 '
delineating topographic detail of the project corridor. The survey will be used as a
Design Survey for the development of roadway improvement plans . The survey
will be comprised of a cover sheet containing a vicinity map , surveyor' s
certification , general project description , and other information pertinent to the
survey . There will be six detail sheets containing two rows of survey data utilizing
" match lines " . Existing right of way lines will be established based upon the
recorded plat of Indian River Farms Subdivision as recorded among the Land
Records of Indian River County in Plat Book 2 , Plat 25 , The Specific Purpose
Survey will adhere to , and the consultant will be responsible for:
Horizontal Datum to be based on the Florida State Plane Coordinate
System , East Zone , North American Datum of 1983/ 1990 Readjustment ,
Vertical Datum ( NGVD 1929) will be based upon existing benchmarks to
be provided by the County . Existing Benchmarks will lie within '/4 mile of
the project .
Cross Section data will be collected at even 100 ' stations along the
survey baseline ( Section Line ) and will extend 50 ' beyond the existing
right of way lines or top of canal banks . Cross section data will also be
collected at any visible grade breaks along the baseline . Where cross
sections cross existing canals data will be collected from top of bank to
existing waterline to water line to top of bank . Full canal cross -section data
will be collected at every 500 ' station .
F :\Engineering\Capital Projects\0390-Annual Survey Contracts 2003 -2004\Burdett\0390 Burdette WO # 1 - 8th St, 74th Ave-mob . DOC
'Page 3
8t' Street and 74"' Ave
Specific Purpose Survey
Work Order No : 1
Burdett & Assoc .
Topographic Data will include , but is not limited to curb and gutter,
sidewalks , surface and visible or obtainable sub — surface utilities and
markings , fences , mail boxes , signs , drives , buildings within 100 ' of the
existing right of way, culverts , drainage improvements , outlines of Groves ,
Woodlands and/or Vegetation , Large independent trees or clusters , etc .
Existing drainage improvement data will include pipe sizes , type of
material , invert elevations . It will be the County' s responsibility to insure
the catch basins and manholes , etc . are clear of debris . Detailed
Topographic data will also be collected at existing intersections as
necessary to accurately define existing conditions . Data will be collected
for the West half of the intersection at the 8th Street and 66th Avenue .
The survey shall also comply with the current Florida Minimum Technical
Standards ,
The Survey Baseline , Section Line , will be staked at the beginning and
end of the project limits , bend points , points of intersection and referenced
every +/- 1000 . ( 100 ' stations not to be set in the field )
Project Deliverables will consist of data files in AutoCAD 2000 format on CD
and One signed and sealed 24 " x 36 " Mylar plot at a scale of 1 " = 40 ' . Prior to
final delivery the Consultant will deliver one copy of the survey to the County
Surveyor for review and approval .
SECTION II : CONTROL SURVEY :
Control Survey data/sheets shall be incorporated and be a part of the Specific
Purpose Survey outlined above .
The survey shall also comply with the current Florida Minimum Technical
Standards ,
Project Deliverables will consist of data files in AutoCAD 2000 format on CD
and One signed and sealed Mylar plot . Prior to final delivery the Consultant will
deliver one copy of the survey to the County Surveyor for review and approval .
F :\Engineering\Capital Projects\0390-Annual Survey Contracts 2003-2004\Burdett\0390 Burdette WO # 1 - 8th St, 74th Ave-mob . DOC
Page '.
&4 'h ' Street and 74` ' Ave
Specific Purpose Survey
Work Order No : 1
Burdett & Assoc .
SECTION III : COMPENSATION ,
The COUNTY agrees to pay, and the SURVEYOR agrees to accept , a fee for
services rendered according to the "Scope of Services " identified in the attached
EXHIBIT "A" Fee Schedule and Man Hours .
A Lump Sum of $ 36 , 821 . 90
SECTION IV — TIME FOR COMPLETION
The Work Order No . 1 shall be completed within 90 calendar days from Notice
to Proceed .
The AGREEMENT is hereby amended as specifically set forth herein . All
remaining sections of the AGREEMENT shall remain in full force and effect , and
are incorporated herein .
IN WITNES WHEREOF the partied hereto have executed these presents
this 21 st days of October , 2003 .
BURDETTE & ASSOCIATES , INC . INDIAN RIVER COUNTY, FLORIDA
BOARD OF OUNTY COMMISSIOENRS
BY : C / BY • WO
R . MACHT , CHAIRPERSON
Title :
APPROVED BY THE BCC : 10 - 21 - 2003
Indian River County Approved Date
Administration ATTEST :
JEFFEREY K. BARTON
Budget LERK OFC COURT
�
LEL
Legal _
Risk Management B
DEPUTY CLERK OF COURT
Public Works
Engineering
JAMES E . CHANDLER
COUNTY ADMINISTRATOR
WILLIAM G. COLLINS , II
COUNTY ATTORNEY
F:\Engineering\Capital Projects\0390-Annual Survey Contracts 2003 -2004\Burdett\0390 Burdette WO # 1 - 8th St, 74th Ave-mob. DOC
EX H I B IT "All
,
BURDETTE & ASSOCIATES , INC.
SUBTOTAL SALARY COSTS $ 36,705.90 2295 GENESEA LANE
PER DIEM VERO BEACH , FL. 32963
DIRECT EXPENSES $ 116.00 772-231 -8750 FAX 772-231 -8752
SUBTOTAL $ 36,821 .90
MAXIMUM LIMITING FEE $ 369821 . 90 COUNTY ROAD: 8th STREET AND 74th AVE .
NOTES : COUNTY : INDIAN RIVER
1 . 4 CONC MON . @ $9 $ 36 . 00 SURVEY LOG No :
2. 80 BLUE PRINTS @ $ 1 $ 80 . 00 DATE : OCTOBER 6 , 2003
FIELD CREWS
PERSON ,
PROJECT
3 PERSON 3 PERSON 3 UNIT CADD
2PERSON , 2 MANAGER SURVEYOR
WORK TASK ( DAYS) UNIT GPS ( DAYS) , 2 UNIT GPSTECH/OFFICE CLERICAL
(HOURS) ( PLS) PROJ SURV SURVEYOR (HOURS)
DESCRIPTION $960 . 00 $840 GPS $920
CONTROL $ 1000 $120 (HOURS) $95 $75 (HOURS) $60 $39.62
6. 00 1 . 00 6 . 00 16 . 00
TOPO 6 . 00 1 . 50 6 . 00 12 . 00
X SECTIONS 9. 00 1 . 50 9. 00 18 . 00
STAKE BL Pi 's 0 . 63 0 . 63 1 , 25
REF BL Pi 's 0 . 75 0 . 50 0 . 75 1 . 50
NET CONTROL
VERT CONTROL 2 . 50 1 . 00 1 . 00 5 . 00
LOCATE PROP CORNERS
DELINEATE RW LINES PER
INDIAN RIV FARMS PLAT 4. 00 12 . 00
PREPARE SPEC PURP/CONTROL SURV 2 . 00 10 . 00 62 . 00
LOCATE BUILDING CORS
MEETINGS 4. 00
PROJECT TOTALS
SURVEY DAYS/MANHOURS 24. 88 0 . 00 0 . 00 10 . 50 37. 38 19. 00 109 . 75 0 . 00
BURDENED SALARY $23, 884. 80 $1 , 260 . 00 $ 37551 . 10 7425 . 00 6 , 585 . 00 $ -
F:\Engineering\Capital Projects\0390-Annual Survey Contracts 2003-2004\Burdett\0390 8th Street, 74th Ave, Final Cost Est Burdettl 10- 14-03
. doc