Loading...
HomeMy WebLinkAbout2008-021I, . Board of County Commissioners Administration - Building A (South) 1801 27th Street Vero Beach, Florida 32960 Telephone: (772) 567-8000 FAX: 772-778-9391 Project: San Sebastian Specific Purpose Record Survey IRC Project No. UPC 3014 WORK ORDER NO. 6, (Utilities/Surveying) FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPING/GIS SERVICES WITH Carter Associates, Inc. In accordance with Contract No. 0725 This Work Order No. 6 is in accordance with the existing AGREEMENT dated November 6`h 2007 between Carter Associates, Inc. (SURVEYOR) and Indian River County (COUNTY). This Work Order No. 6 amends the agreement as follows: SECTION I — PROJECT LIMITS This Work Order No. 6 is for the SURVEYOR to perform a "Specific Purpose Record Survey' of the Platted roadways within the subdivisions of San Sebastian Springs and San Sebastian Lakes as further identified in the attached "Exhibit A". SECTION II - SCOPE OF SERVICES As agreed upon between Carter Associates, Inc. and Indian River County, the SURVEYOR shall provide Professional Land Surveying services to complete all tasks as outlined in this Work Order No. 6 described within the attached "Exhibit A": SECTION III —TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT 1. Project shall be completed within thirty (30) business days from Notice to Proceed. 2. Deliverables to include five (5) signed and sealed hard copies and electronic copies in AutoCAD 2007 and PDF formats. SECTION IV — COMPENSATION The COUNTY agrees to pay, and the SURVEYOR agrees to accept, for services rendered as identified in Sections I, II, and III of this Work Order No. 6, a lump sum fee of $24,400.00 Attachment 1 1 OF 4 The AGREEMENT is hereby amended as specifically set forth herein. All remaining sections of the AGREEMENT shall remain in full force and effect, and are incorporated herein. IN WITNESS WHEREOF the parties hereto have executed these presents this 15th day Of January 200$. OWNER BOARD OF COUNTY COMMISSIONERS INDIAN RIVER COUNTY, FLORIDA L iCi , (S' nature) Sandra L. Bowcfei'-hainan._ (Printed name and title) Approved by DCC January 15, 2008 ATTEST: * Jeffrey K. Bart oh;.Clerk of Circuit Court vV:,i� Deputy Clerk Approvo as to Form and Le a ufficiency: i "!am G. Collins II, COUNTY Attorney Vz D: ^ �1�(1 a-1Jt osep A. Baird, COUNTY Administrator length 2OF4 Witnessed by: C> B PROPOSAL EXHIBIT "A" WORK ORDER NO.6 FOR PROFESSIONAL SERVICES AGREEMENT ANNUAL SURVEYING and MAPPING/GIS SERVICES CONTRACT N0.0725, 2007.2009 SCOPE: GENERAL DESCRIPTION Project consists of approximately 13,000 linear feet of road rights-of-way located within five subdivisions: 1. San Sebastian Springs (PB 11, Pg 58 & 92) 2. San Sebastian Springs Unit II (PB 12, Pg 91) 3. San Sebastian Springs Unit III (PB 13, Pg 53) 4. San Sebastian Lakes (PB 13, Pg 54) 5. San Sebastian Springs Unit IV (PB 13, Pg 55) A Specific Purpose Record Survey will be conducted for the purposes of identifying and mapping existing improvements within the platted rights-of-way and contiguously platted utility easements. These improvements shall be all above ground appurtenances including, but not limited to pavements, curbs, walks, manholes, valve covers, inlets, culverts, driveways, mail boxes and cable utility boxes. An AutoCadd (version 7) base map will be generated including the platted right-of-ways, easements and lot lines with the addresses of all houses for the purposes of the County's engineering design and contractor as-builts. FIELD SURVEY • Field locate right-of-way centerline monumentation necessary to determine boundaries of subject roadways. Survey control will be performed by GPS, based upon NAD 83/99 horizontal datum. • Field locate all above ground appurtenances within the platted rights -of -ways and contiguously platted utility easements. • Establish elevations on found centerline control based upon NAVD 88 vertical datum to best accuracies available utilizing GPS procedures. • Cross section rights of way at 100 foot intervals. • Field verify all house addresses. FINAL MAPPING • Compute record plat rights -of -ways and contiguous easements, orient to field control. • Identify all field located improvements by symbol and/or text description. • Establish centerline stationing and geometry. • Publish State Plane Coordinates and elevations on all located centerline control. • Identify lot numbers and house addresses. • Provide certified map(s) and AutoCadd (version 7) file on disc. TOTAL LUMP SUM $ 24,400.00 3OF4 SCOPE: (Continued) SPECIFIC NOTES: 1. All work to be completed in compliance with the Florida Minimum Technical Standards 61G17-6 Florida Administrative Code pursuant to chapter 472.027 Florida Statutes. 2. All matters of public record to be shown on the survey including, but not limited to agreements, easements, reservations, restrictions and rights of way shall be based entirely upon information contained within the record subdivision plats of the area being surveyed. 3. In the event that the surveyor is requested to research public records the client will be responsible for reimbursement of said services on a time and materials basis. 4. Final mapping to be provided consist of plan views only and does not include profile view mapping. 4OF4