HomeMy WebLinkAbout2008-080.i
C'
Board of County Commissioners
Administration - Building A (South)
1801 27th Street
Vero Beach, Florida 32960
Telephone: (772) 567-8000 FAX: (772) 778-9391
Project:
26th Street Roadway Improvements between 74th Avenue and 82nd Avenue
IRC Project No. 0809
WORK ORDER NO. 7, (Engineering/Surveying)
FOR
PROFESSIONAL SERVICES AGREEMENT
ANNUAL SURVEYING and MAPPING/GIS SERVICES
WITH
Carter Associates, Inc.
In accordance with Contract No. 0725
This Work Order No. 7 is in accordance with the existing AGREEMENT dated November 6,
2007 between Carter Associates, Inc. (SURVEYOR) and Indian River County (COUNTY). This
Work Order No. 7 amends the agreement as follows:
SECTION I — PROJECT LIMITS
This Work Order No. 7 is for the SURVEYOR to perform a Topographic Survey and field staking
on a portion of the "26`h Street Roadway Improvements between 74`h Avenue and 82"d Avenue
relating to Indian River Estates" being a portion of the Southwest '/4 of the Southeast '/4 of
Section 36, Township 32 South, Range 38 East, Owner: Robert H. Cook, Jr., Parcel ID
#32383600000700000003.0, having a physical address of 8000 26'h Street, Vero Beach,
Florida.
SECTION II - SCOPE OF SERVICES
As agreed upon between Carter Associates, Inc. and Indian River County, the SURVEYOR
shall provide Professional Land Surveying services to complete a sketch and description of a
Drainage and Maintenance Easement. Survey shall consist of a topographic survey showing
elevations and locations of all existing drainage ditches, structures and improvements within the
westerly 75 feet of the subject parcel. Topographic survey to also include the establishment of
the west property line of the subject parcel, horizontal and vertical control and cross sections at
100 -foot stations. A sketch and description of the proposed drainage and maintenance
easement will be prepared based on the topographic survey (existing conditions), roadway and
drainage design and county negotiations with the property owner. Underground improvements
that are not readily visible or obvious are not included in these tasks.
Services
also include staking in
the field, the
entire
proposed drainage and
maintenance
easement
as established/designed
by the survey
efforts
and scheduled by County
staff.
SECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT
1. Project shall be completed within thirty (30) business days from Notice to Proceed.
2. Deliverables SHALL BE CERTIFIED TO Indian River County Board of County
Commissioners and shall include three (3) signed and sealed 24" x 36" AND three (3)
reduced 81/2" x 11" — "legible" versions (for recording), electronic copies in AutoCAD
2007 and PDF formats.
Pave 2 of 2
26` Street Roadway Improvements between 74`" Avenue and 82 n Avenue
IRC Project No. 0809
SECTION IV —COMPENSATION
The COUNTY agrees to
pay,
and
the
SURVEYOR agrees
to accept,
for
services rendered as
identified in Sections I, II,
and
III of
this
Work Order No. 7, a
lump sum
fee
of $ 3,880.00
The AGREEMENT is hereby amended as
specifically
set
forth herein. All remaining sections of
the AGREEMENT shall remain in full force
and effect,
and
are incorporated herein.
IN WITNESS WHEREOF the parties hereto have executed these presents this 11th day
of March 2008.
OWNER' "�
BOARD, f COUNT_ 61COMMISSIONERS
IND[AN RIVER Cts TY, FLORIDA
Pew
i
2,f" i t J!) 15 A' 1•. ..
Approved by BCC March 11, 2008
ATTEST:
Jeffrey K. Barton, Clerk of Circuit Court
r
0ep6ty'Clerk
Apprqve as to For an g u Ic ncy:
t
/liam G. C611ins II, CTUNTY Attorney
010� 0 C�V' h.& A J
seph . Baird, COUNTY Administrator
Carter Associates Inc.
name and title)
Witnessed by:
KAAt=N I,-, K U F
(Printed name)