Loading...
HomeMy WebLinkAbout2004-068 4 CARTER ASSOCIATES , INC . , 1708 21 s' Street Vero Beach , FL 32960 zu7r Z ,oF rmmsnn rx 6 (561 ) 5624191 - (561 ) 562 -7180 Fax TO DATE 7McCully7, P . E . Indian River County Public Works 03/24/04 02- 116e 184025 1h Street ATTENTION: Vero Beach , FL 32960 Mr. Keith RE: Indian River Farms Water Control District Tilting Weir Gate Installations Change Order No , 1 WE ARE SENDING YOU : Attached Under separate cover via HAND DELIVERY the following items : Shop drawings Prints Plans Samples Specifications Copy of letter Change Order Other COPISS DATE NO. DESGF -11PTION 1 03/24/04 Copy of Change Order Notmrl nself eland the Contractor. A PR MAR 2 3 2004 BOARD OF COMMISSION THESE ARE TRANSMITTED as checked below: X For approval Approved as submitted Resubmit copies for approval X For your use Approved as noted Submit copies for distribution As requested Returned for corrections Return corrected prints For review and comment . Other FOR BIDS DUE , 2000 PRINTS RETURNED AFTER LOAN TO US REMARKS : With the County Commission approving the agenda item yesterday, I will forward the original change order to Mr. Gunter for execution by the District. I thank you for your assistance with this matter. COPY TO : Kim Massung- I . R. C. B . C . C . , w/enclosures SIGNED zz Steve Snoberger, P . E . N:\SDS\02-116E(I.R.F.W.C.D.GATES)\Construction\Correspondence\CO 1 AgendaItemToKeithTrans.doc Change Order No . 1 Date of Issuance: March 8, 2004 Effective Date: Project: Tilting Weir Gate Installations at Existing Water Owner. Indian River Farms Water Control District Owners Contract No.: N/A Control Structures Contract: For Replacing one Existing Radial Gate with a Tilting Weir Gate at the North, South and Main Relief Date of Contract: September 19, 2003 Canals as well as the Lateral "C" Canal Control Structures. Contractor. Met — Con, Inc. Engineer's Project No.: 02-116E The Contract Documents are modified as follows upon execution of this Change Order: Description: Grout Proposed Rip-Rap for Bank and Bottom Stabilization. Grouting is Required to Keep the Rip-Rap in Place During Opening of a Radial Gate Prior to Installation of the Tilting Weir Gate or During a "Flood" Condition where the Radial Gates are Opened Prior to the Tilting Weir Gate Creating a Tailwater Condition. Attachments : (List documents supporting change): Attachment "A", Letter from Indian River Farms Water Control District dated January 14, 2004 Attachment "B", Letter from Met — Con, Inc. dated March 7, 2004 identifying grouting costs CHANGE IN CONTRACT PRICE : CHANGE IN CONTRACT TIMES : Original Contract Price: Original Contract Times: ❑ Working days ,/ Calendar days Substantial completion (days or date): 270 $ 648. 548. 00 Ready for final payment (days or date): 300 [Increase] [Decrease] from previously approved Change [Increase] [Decrease] from previously approved Change Orders Orders No. N/A to No. N/A No. N/A to No. N/A Substantial completion (days): 0 $ 0.00 Ready for final payment (days): 0 Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial completion (days or date): 270 $ 648.548.00 Ready for final payment (days or date): 300 [Increase] [Decrease] of this Change Order: [Increase] [Decrease] of this Change Order: Substantial completion (days or date): 60 $_ 33.731 .09 Ready for final payment (days or date): 60 Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial completion (days or date): 330 $ : afth .09 Ready for final payment (days or date): 360 F Gomm D( " § �° ACCEPTED: � ° ACCEPTED: BY , Engineer 4rter°*soctaies,4r1c ' Owner - Indian River Farms Water Control District o - et-Con, Inc. atel �e ` ,- 9 Date: `�-= a k� Date- rd ate: 0 � Apj3rpved by rundtng Agentiy. (if applioble): Date: .; r 4