CARTER ASSOCIATES , INC . ,
1708 21 s' Street
Vero Beach , FL 32960 zu7r Z ,oF rmmsnn rx 6
(561 ) 5624191 - (561 ) 562 -7180 Fax
TO DATE 7McCully7, P . E .
Indian River County Public Works 03/24/04 02- 116e
184025 1h Street ATTENTION:
Vero Beach , FL 32960 Mr. Keith
RE:
Indian River Farms Water Control District
Tilting Weir Gate Installations
Change Order No , 1
WE ARE SENDING YOU : Attached Under separate cover via HAND DELIVERY the following
items :
Shop drawings Prints Plans Samples Specifications
Copy of letter Change Order Other
COPISS DATE NO. DESGF -11PTION
1 03/24/04 Copy of Change Order Notmrl nself eland the
Contractor. A PR
MAR 2 3 2004
BOARD OF
COMMISSION
THESE ARE TRANSMITTED as checked below:
X For approval Approved as submitted Resubmit copies for approval
X For your use Approved as noted Submit copies for distribution
As requested Returned for corrections Return corrected prints
For review and comment . Other
FOR BIDS DUE , 2000 PRINTS RETURNED AFTER LOAN TO US
REMARKS :
With the County Commission approving the agenda item yesterday, I will forward the original change
order to Mr. Gunter for execution by the District. I thank you for your assistance with this matter.
COPY TO : Kim Massung- I . R. C. B . C . C . , w/enclosures SIGNED zz
Steve Snoberger, P . E .
N:\SDS\02-116E(I.R.F.W.C.D.GATES)\Construction\Correspondence\CO 1 AgendaItemToKeithTrans.doc
Change Order
No . 1
Date of Issuance: March 8, 2004 Effective Date:
Project: Tilting Weir Gate Installations at Existing Water Owner. Indian River Farms Water Control District Owners Contract No.: N/A
Control Structures
Contract: For Replacing one Existing Radial Gate with a Tilting Weir Gate at the North, South and Main Relief Date of Contract: September 19,
2003
Canals as well as the Lateral "C" Canal Control Structures.
Contractor. Met — Con, Inc. Engineer's Project No.: 02-116E
The Contract Documents are modified as follows upon execution of this Change Order:
Description: Grout Proposed Rip-Rap for Bank and Bottom Stabilization. Grouting is Required to Keep the Rip-Rap
in Place During Opening of a Radial Gate Prior to Installation of the Tilting Weir Gate or During a
"Flood" Condition where the Radial Gates are Opened Prior to the Tilting Weir Gate Creating a
Tailwater Condition.
Attachments : (List documents supporting change):
Attachment "A", Letter from Indian River Farms Water Control District dated January 14, 2004
Attachment "B", Letter from Met — Con, Inc. dated March 7, 2004 identifying grouting costs
CHANGE IN CONTRACT PRICE : CHANGE IN CONTRACT TIMES :
Original Contract Price: Original Contract Times: ❑ Working days ,/ Calendar days
Substantial completion (days or date): 270
$ 648. 548. 00 Ready for final payment (days or date): 300
[Increase] [Decrease] from previously approved Change [Increase] [Decrease] from previously approved Change Orders
Orders No. N/A to No. N/A No. N/A to No. N/A
Substantial completion (days): 0
$ 0.00 Ready for final payment (days): 0
Contract Price prior to this Change Order: Contract Times prior to this Change Order:
Substantial completion (days or date): 270
$ 648.548.00 Ready for final payment (days or date): 300
[Increase] [Decrease] of this Change Order: [Increase] [Decrease] of this Change Order:
Substantial completion (days or date): 60
$_ 33.731 .09 Ready for final payment (days or date): 60
Contract Price incorporating this Change Order: Contract Times with all approved Change Orders:
Substantial completion (days or date): 330
$ : afth .09 Ready for final payment (days or date): 360
F Gomm D( " § �° ACCEPTED:
� ° ACCEPTED:
BY
, Engineer 4rter°*soctaies,4r1c ' Owner - Indian River Farms Water Control District o - et-Con, Inc.