HomeMy WebLinkAbout2007-259(a-b) 7 �C 7 x_200 7 . � 5 `t t - i AIA Document G704TM — 2000 j _ a1 Certificate of Substantial Completion PROJECT: PROJECT NUMBER: 5054. 181 OWNER: ❑ (Name and address): CONTRACT FOR: General Construction ARCHITECT: ❑ IRC Emergency Operations Center CONTRACT DATE: June 6, 2006 CONTRACTOR: ❑ 4225 43' Avenue Vero Beach, Florida 32967 FIELD: ❑ TO OWNER: TO CONTRACTOR: OTHER: ❑ (Name and address): (Name and address): Indian River County Tamer Construction, Co. 184025th Street 800 N. Magnolia Avenue, Suite 500 Vero Beach, Florida 32960 Orlando, Florida 32803 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: Complete Building Facility as Permitted and Site Plan Approved. The Work performed under this Contract has been reviewed and found to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate, which is also the date of commencement of applicable warranties required by the Contract Documents, except as stated below: Warranty Date of Commencement Complete Project Z407/23/07 Donadio & Associates, /23/07 Architects, P.A. ARCHITECT DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective: $10,000.00 The Contractor will complete or correct the Work on the list of items attached hereto within Fourteen ( 14 ) days from the above date of Substantial Completion. / Turner Construction, Co. CONTRACTOR DATE The Owner accepts the Work or designated portio ally complete and will assume full possession at 8:o0A.M . (time) on 0724107 (date). Indian River County J e OWNER BY Jos ph A . Baird DATE Cou ty Administrator / As au horiz d pursuant to Resolution The responsibilities of the Owner and ntractor for security, maintenance, heat, utilities, darryt e to the Work and insurance # 2007 -075 shall be as follows: (Note: Owner 's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) Contractor shall be responsible for Security, Maintenance, Heat, Utility, Damage to Work & Insurance until a Certificate of Occupancy is obtained. AIA Document G704w - 2000. Copyright m 1963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This AIA° Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any 1 portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 08:16:37 on 07/25/2007 under Order No.1000270401 _1 which expires on 11/1612007, and is not for resale. (743569217) User Notes: Rl�✓ JP OFFICE OF THE ADMINISTRATION BUILDING PROJECT MANAGER �I July 24, 2007 To : Lou Fiore, Senior Project Manager, Turner Construction Tony Donadio, Donadio & Associates, Architects Re : Emergency Operations Center, Certificate of Substantial Completion, Interior Punch List Clarification of Space titles vs. Room Numbers Lou & Tony For clarification purposes, the punchlists indicate the room number and the space title at the time of the punchlist. At the time of the actual punchlist the space titles were as originally shown in the drawings. They have been modified in some cases. For simplicity' s sake only the room numbers as shown on the plans should be used in reference to these punchlist comments, not the space titles. Space titles are as shown on the attached plan. Sincerely, Steve Blum, Architect Project Manager 1840 2r Street, Vero Beach, FL 32960.3365 Voice: (772) 226-1531 Fax: (772) 978-1781 Suncom 214-1531 e-mail: sblum(dirceoxcom , I D O N A D I O & Associates, Architects, P.A. TO: LOU FIORE TURNER CONSTRUCTION STEVE BLUM INDIAN RIVER COUNTY LYNN WILLIAMS INDIAN RIVER COUNTY TOM FRAME INDIAN RIVER COUNTY JIM LEVERONI DONADIO AND ASSOCIATES FROM: ANTHONY J. DONADIO, AIA, NCARB DONADIO & ASSOCIATES, ARCHITECTS, P.A. DATE: TUESDAY - JUNE 12, 2007 ISSUE DATE: JUNE 229 2007 PROJECT NO, 5054.18 REGARDING: INDIAN RIVER COUNTY EMERGENCY OPERATIONS CENTER INTERIOR PUNCH LIST TIME: 1 : 30 P.M. WEATHER: OVERCAST/ WINDY Lobby 001 1 . Exterior Door 001 — Threshold needs to be cleaned of dirt and debris. 2. Weather stripping needs to be secured tighter at the floor area. 3 . Lobby area needs to be cleaned of dirt and debris at the tile floor. 4. To the left of exterior Door 001 fingerprints on the wall need to be touched up with paint. 5 . North wall underneath the pass-thru window, drywall needs to be repainted where it has been touched-up . 6. Pass-thru window needs to have sill track installed and secured in place. 7 . Underside of countertop pass-thru steel angle needs to be painted to match the wall at the bottom of the countertop. Also, any openings or gaps in the steel angle need to be caulked. 8. Pass-thru window needs to be cleaned of dirt and debris and aluminum frame caulked where it abuts the drywall opening. 9. Aluminum head for the pass-thru window needs to be cleaned of drywall mud and the speaker panel in the window needs to be set plumb, evidently the louvers are on an angle. 10. Metal door frame 068 needs to be repainted at the edges where it has been chipped with paint. 60917th Street Vero Beach, Florida 32960 Phone 772 794 2929 Fax 772 562 8600 RECEIVED Email dm@donadio-arch.com License No . AA0002238 ' JUL 2 4 2007 TURNER 1 Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/ 12/07 June 22, 2007 Page 2 Lobby 001 (continued) 11 . West wall electrical outlet opening cut too large, drywall needs to be patched and repaired and outlet cover plate needs to be set flush. That is also true of the TV outlet on this same wall . 12. South corner of the west wall needs to be touched-up with paint where it has been chipped. Also in this area there is a scratch in the drywall. Also, on the south side of the return to the right of door 003A there is a bump in the drywall approximately 18 " off the floor at that outside corner. 13 . Doors 003A — Hollow metal frame needs to be touched-up with paint at the edges where it has been chipped. Also, in side face of door at the middle hinge scratch in the door needs to be fixed/repaired . Door does not latch properly into the strike. 14. To the left of Door 003A escutcheon plate needs to be installed on the plumbing clean-out. 15. South wall just to the right of the door stop for Door 002 needs to be touched-up with paint, there are marks on the wall. 16. Drywall to the right of door frame 0002 is pulled away from the metal frame, needs to be patched and repaired up on the top right of the top hinge. Also, where the drywall abuts 002 door frame needs to be sanded and repainted. 17 . To the right of Door 001 drywall corner is chipped around the complete perimeter of the door, needs to be patched, repaired and repainted. 18. Drywall above Door 001 just below the exit light fingerprints on the drywall need to be repainted . 19. Ceiling tile missing above Door 003A. 20. Ceiling grid along the east wall above and to the right of exterior Door 001 , the main grid and the cross ceiling tee need to be set flush to the grid, they are uneven at this time. 21 . Ceiling grid to the top left of Door 001 is bent, that is the 3r1 ceiling grid off the north wall and the I " full ceiling tile off the east wall . 22. Ceiling grid off the main runner grid in front of Door 003A, 3rd grid perpendicular to the door is bent needs to be repaired. 23. All walls in this area need to be cleaned of drywall dust. 24. Top of ceramic tile base needs to be cleaned of dirt, debris and also paint overspray of the complete perimeter of the room. 25. Ceramic tile base to the right of Door 003A, inside corner is very irregular, the tile does not set flush to the wall, this needs to be corrected. Restroom 002 1 . Wood door 002 needs to be cleaned of dirt and debris. Also, top left on the inside face glue on the door needs to be cleaned. 2. Floor drain cover needs to be cleaned of tape, grout, etc. 3 . All plumbing accessories need to be cleaned of protective film. 4. Ceramic tile needs to be cleaned of paint, dirt and debris in numerous areas. 5 . Top edge of 2x 6 ceramic rile trim needs to be cleaned of paint around the complete perimeter where it abuts the drywall, top edge. 6. Drywall above Door 002 where it abuts the metal frame, the door head needs to be sanded and repainted. 7 . Ceramic tile floor needs to be cleaned of dirt and debris. 8. Ceramic tile base to the right or to the east of the toilet fixtures , water closet voids at the grout joint between the floor and ceramic the base directly under the toilet paper holder. 9. Caulking at the wall hung lavatory and ceramic the on the right side is not done neatly needs to be redone. Rough and irregular. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 3 Media Production Room 003 1 . Left of Door 003A drywall needs to be sanded and repainted, irregular areas. 2. North wall to the left of the electrical outlet dirt mark on the wall needs to be sanded and repainted. 3. West wall, the short wall off of Door 003A, outside corner, fingerprints need to be repainted. 4. North wall a little bit to the right of the westernmost electrical outlet fingerprints on the wall basically between the 2 electrical outlets need to be repainted . 5 . Door 003A hollow metal door frame needs to be touched-up with paint where it has been chipped in numerous areas. Also, metal frame for the view light needs to be repainted at the screw head locations and areas where paint has been chipped or peeling off. 6. Drywall to the left of door frame 003B needs to be re-sanded and repainted. Un-sufficient coats of paint and irregularity in the drywall. 7. Drywall around light switch to the left of Door 003B opening cut too large, needs to be patched and repaired. 8 . Borrowed light BL4 drywall underneath the hollow metal frame at the bottom left comer and to the left of the jamb needs to be sanded and repainted, drywall is irregular. 9. Electrical outlet below borrowed light 4, drywall is irregular, needs to be patched and repaired around electrical outlet cover. 10. Borrowed light BU drywall needs to be patched and repaired on the bottom left and right comers there are voids in the frame. Also, bottom edge of the hollow metal frame paint irregular need to be sanded and repainted that is also typical of borrowed light #4. 11 . South wall below the borrowed light BL2 marks in the drywall need to be patched and repaired. 12. South wall easternmost electrical outlet drywall needs to be patched and repaired, irregular drywall around the perimeter. 13. Carper tiles in numerous locations near the door jambs and in the corners carpet tile is buckled up not setting flush to the floor. All joints need be set flush, replace. 14. All screws in the borrowed lights heads need to be painted to match the frame color. 15. Ceiling grid is bent, that is the ceiling grid to the top right of Door 003A, the 4" & 5d' ceiling grid off the north wall and V full tile off the east wall. 16. Ceiling tile missing off the east wall . 17. Ceiling tile damaged that, 2nd full tile off the east wall and 5th' full tile off the north wall, comer is chipped. 18 . Ceiling grid off the southeast corner of the west wall marks on the grid need to be cleaned. 19. Ceiling grid the 7ih grid off of Door 003B , red marks on the grid need to be cleaned. 20. Door 003E does not have any locksets installed. Computer Room 004 1 . Transition between carpet and raised flooring needs to he looked at, area is not tight and secure, this is the vinyl finished raised floor. 2. No vinyl base or base installed at the perimeter of the access flooring. 3. Cable work is still being done in this room. Room has not been cleaned yet. 4. Walls need to be touched-up with paint in numerous locations of fingerprints and scuff marks. 5 . All access floor tiles need to be set flush and level . 6. All penetrations to the acoustical ceiling needs to be cut in a neat flashing and escutcheon put around the openings . Right now they are all cut very irregular. 7 . North wall towards the west end above the electrical panel, the ceiling grid is missing. 8. Ceiling grid above the electrical panel on the east wall , grid is cut due to the conduit coming out of the panel. This needs to be done in a clean and neat fashion. Not acceptable. 9. In this same area ceiling grid to the right of the electrical panel on the east wall needs to be repainted or replaced, glue on the grid. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 4 Computer Room 004 (continued) 10. All dirt and debris and construction waste needs to be cleaned up underneath the access flooring. 11 . Ceiling tile the 2nd & 3`d ceiling tile off the east wall and the 2nd full ceiling tile off the north wall, both tiles are damaged. 12 . Ceiling tile off the west wall, middle of the data room, two tiles off the west wall, red marks on the tile, clean or replace. 13 . Ceiling tile about the center of the room, 1 " full ceiling tile off the south wall, chipped. 14. Still work going on in Computer Room 004. This area needs to be re-inspected, once all work is completed. Multi-Purpose 005 1 . Pair of door 0051 - outside face of door needs to be cleaned of scuff marks on the door finish between the bottom and middle hinges over the width of the door. 2 . Metal door light frames need to be touched-up with paint at the edges where it has chipped and also at the screws. 3 . To the right of Door 0051 drywall needs to be repainted and also redone where it abuts the right side of the door frame. That is also true of the left side, the drywall needs to be sanded and repainted, very irregular. Right side, left side and at the head of hollow metal door frame for 0051 need to sand and repaint it. 4. Above Door 0051 ceiling grid has red mark on it, needs to be cleaned. 5 . To the left of Door 0051 red marks on the drywall need to be repainted. 6. Carpeting in front of Door 0051 stains on the carpet needs to be removed and replaced. 7. Right and left outside corners of the drywall in front of Door 0051 , needs to be sanded and repainted. Chips on the drywall. 8 . Ceiling grid above the right door inside the room, I " grid off the wall is bent, needs to be replaced. 9. Base counter and countertop in front of Media Room 003 countertop needs to be cleaned of dirt and debris. Also, countertop needs to be caulked where it abuts the hollow metal window frames and where the cabinet abuts drywall, needs to be caulked in place. 10. All cabinetry in this area needs to be cleaned of dirt, debris and all doors need to be set level and plumb. 11 . As a suggestion backsplash would be better if it was removed and the countertop caulked to the drywall and also, to the underside of the hollow metal frame. This would be a suggestion to have removed. 12 . Underside of countertop where it abuts the base cabinet, glue is on the face of the cabinet that is to the far right, east end needs to be removed. Also, at the joint and the countertop wood chips need to be cleaned off the bottom edge. 13 . Electrical outlets between borrowed lights 2, 3 & 4 need to be sanded and repainted around the electrical outlet covers. Also, outlet cover needs to be cleaned of paint. 14. Drywall around the perimeter of borrowed light #4 at the jamb and the head, especially at the corner, needs to be sanded and repainted, very irregular. That is also true on borrowed light 2 & 3 . 15 . Borrowed lights need to be repainted at the sill of the windows where there appears to have been peeling of paint and it has been repainted. 16. Drywall to the right of borrowed light #2 fingerprints, dirt marks on the walls needs to be repainted. 17 . Inside corner of drywall to the boxed out column to the right of borrowed light #2 needs to be sanded and repainted, very irregular. That is also true of the outside corner above the drywall header leading to Computer Room 004. 18. Drywall to the left of Door 004 needs to be touched-up with paint, fingerprints. Also, to the bottom right of hollow metal door frame 004 vinyl base is not adhered and also drywall is irregular. Needs to be sanded and repainted. D O N A D I O & Associates , Architects, P.A . Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 5 Multi-Purpose 005 (continued) 19. South wall of the Alcove leading to Computer Room 004, marks on the drywall need to be touched-up with paint and also scuff marks and screw heads above the vinyl base needs to be patched and repaired. 20. On the inside comer as you approach into the Multipurpose Room 005 behind the base at the outside corner there is a dent in the drywall, this needs to be patched and repaired and the drywall be applied. Also, above this same area there are red marks on the drywall, need to he repainted. 21 . Lens of light fixture needs to be cleaned of drywall mud in front of Door 004. 22. Above Door 004 to the top right against the south wall ceiling tile is setting flush to the grid. 23 . East wall to the left of Corridor 006 Data Outlet 11/12C drywall needs to be patched and repaired around the data outlet and also the electrical outlet to the right of this . 24. Electrical outlet cover needs to he set flush to the drywall. 25. Drywall header leading into Corridor 006 top edge needs to be sanded and repainted. The outside edge corner is irregular. 26. Outside corners to the left and right of the entrance into Corridor 006 needs to be sanded and repainted. Chipped. Also, fingerprints on it to the right of the entry to drywall opening and the Corridor 006, fingerprints on the drywall. 27 . East wall to the right of Corridor 006, fingerprints, dirt marks on the drywall and also drywall around the Data Outlet 36 & 36C and electrical outlet and junction box cover plate needs to be sanded and repainted. 28 . Boxed out drywall column D1 , to the left of that column approximately 8ft, there is a smudge mark in the drywall , needs to be sanded and repainted. Also, on the bottom left corner of boxed out column, vinyl base has dirt on it. Right outside corner needs to be repainted where it is chipped and also in that same area there are irregularities in the drywall needs to be sanded and repainted. 29. To the right of boxed out column B1 between boxed out column and the entry corridor 001 irregularity in the paint finishes needs to be sanded and repainted . 30. Vinyl base joint boxed column B1 and entrance to Corridor 006 needs to be cut tighter. 31 . Drywall header leading into Corridor 001 , top edge of the header is irregular needs to be sanded and repainted at the right side edge of the header. 32. South wall , boxed out header, at the electrical projection screen is unacceptable, the finish at the top edge where it abuts the ceiling tile is very irregular and that is also true of where the frame for the projection screens abut the drywall header, very irregular, this needs to be corrected the complete length of this south wall. 33 . Door 0018, hollow metal door frame needs to be cleaned of dirt and debris and red marker. Also, bottom right and left needs to be cleaned of carpet glue . 34. South wall drywall above fire extinguisher cabinet to the right of Door 0018 approximately 8- 1 Oft. up, very irregular, needs to be sanded and repainted. 35 . Drywall above vinyl base between the fife extinguisher cabinet on the south wall and the electrical outlet cover scuff marks and chips in the drywall need to be sanded and repainted. Also, to the right of the light switch and to the right of fire extinguisher cabinet there are fingerprints all over the drywall , needs repainted. 36. South wall to the left of entrance to Corridor 024 approximately 5ft in, paint finish is irregular, needs to be sanded and repainted approximately 8- 10ft off the floor. 37 . Drywall between the electrical outlet on the south wall and the entrance to Corridor 024, marks on the drywall above the vinyl base needs to be repainted approximately 6 inches and 2ft. above the vinyl base in this area. 38 . The south drywall below the westernmost projection screen on the left side of the westernmost projection screen, drywall wall in this area is very irregular, needs to be sanded and repainted that is the finish. 39. Boxed out steel column Al , left edge of the drywall is chipped in numerous locations and also approximately 2ft off the floor and the base of this drywall encasement has a chip in the drywall needs to be patched and repaired. D O N A D I O & Associates, Architects, P.A . MEMNON Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 6 Multi-Purpose 005 (continued) 40. Drywall between Column Al and entrance to Corridor 031 red pin marks on the drywall needs to be repainted. Also in this same area to the right of Data Outlet 33/34C approximately 8- 10ft up paint finish is very irregular needs to be sanded and repainted. 41 . Entrance into Corridor 031 outside corner to left is chipped needs to be patched and repaired. Also, the top right inside corner where the header and wall meet drywall is irregular in this area needs to be sanded and repainted. 42 . Drywall above the top right portion of the header leading into Corridor 031 paint finish is irregular needs to be sanded and repainted. 43 . Electrical outlet cover plate between Corridor 031 and entrance into Door 005 has been sanded and repainted, irregular, cover plate needs to be cleaned of paint overspray . Also, to the bottom right of this area, small chips in the drywall need to be repainted. 44. Alcove leading into Door 005 left outside corners approximately 2-3ft off the floor need to be sanded and repainted. 45. Boxed out column A2 , to the right side of Alcove towards Door 005, first two feet of the drywall is very irregular, wavy, this needs to be repaired. 46. Drywall to the left of Door 005 is irregular in numerous areas from the floor to the top head of the frame needs to be sanded and repainted. That is also true of the drywall to the bottom right of door frame 005 . 47 . Hollow metal door frame needs to be sanded and repainted at the top right comer where the paint finish is very irregular and also above the middle hinge. 48. Drywall to the right of Door 005 marks and chips and irregularities in the drywall need to be sanded, patched and repainted. That is also true of the north wall approximately 711 up off the floor. 49. Boxed out column A2, the right face which would be the east face of the column is very irregular running from the vinyl base up approximately 3-4ft.and continuing up in numerous areas this needs to be sanded and repainted and to be in flush and smooth conditions . 50. Drywall between column A2 and borrowed light BL6, numerous areas are very irregular that is above the vinyl base at the level of the counter and up along the wall approximately at the 7ft height, horizontal lines and irregularity in the drywall and also irregularity in the paint finishes. This needs to be corrected. 51 . To the left of borrowed light BL6, drywall adjacent to the frame and approximately 12 inches out on the left side is very irregular, needs to be sanded and repainted. That is also true of the top right and left corners of this same borrowed light. 52. Drywall between borrowed lights BL6 and BL5 drywall is irregular and rough paint finish around electrical outlet and at the jambs. 53. Drywall above the heads of borrowed light 5 & 6 needs to be sanded, caulked and repainted. 54. All carpet tiles joints need to be set flush and tight. 55 . Carpet in front of Computer Room Door 004, at the opening to Computer Room 004, dirt marks on the carpet tile need to be cleaned and other numerous areas at the electrical floor outlets, the floor outlets in front of borrowed light 3 opposite the east wall between Corridors 06 and Door 04, dirt marks on the carpet needs to be cleaned or carpeting be replaced. 56. Numerous locations of joints are not fit tight. Carpet tile joints needs to be redone or set flush. 57. Carpet tile on the floor boxes need to be glued flush and tight to the covers of the four outlet boxes. 58 . Drywall in this room is very irregular. Numerous areas of the drywall has waves at the taped joints, paint finish is rough and irregular. All this is visible from the center of the room. This is not acceptable and needs to be re-looked at and addressed. 59. Transitions between the access flooring and the concrete floor at the carpet tile, needs to be flush and level. Concerned about wear of the carpet where these joints are uneven particularly in Corridors 011 & 020 and At the Alcove to Door 004, Alcove to Door 005 & access to Corridors 024 & 025 . D O N A D I O & Associates, Architects. P.A . Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 7 Corridor 006 1 . Drywall to the left of Door 007 above the vinyl base, holes in the drywall need to be sanded and repainted . Pencil marks on the walls need to be cleaned and repainted . Fingerprints above Door 007, needs to be repainted . 2. Bottom right and left of the hollow metal door frames 007 needs to be repainted. 3 . Door 007, scratch mark on the door around the lockset, needs to be patched and repaired and glued to the left and on the frame of the view lights. 4. Drywall to the right of Door 007 at the outside corner, fingerprints on the drywall need to be cleaned and repainted and also outside comer edge needs to be sanded and repainted. 5 . Inside corner to the left of Door 008, drywall is irregular in numerous locations needs to be sanded and repainted. 6. Electrical outlet to the left of Door 010, drywall opening cut too large, drywall is irregular needs to be sanded and repainted. 7. Drywall, bottom right of Door 010, needs to be repainted and vinyl base on either side of hollow metal door frame 010 needs to be cut tight to the frame. ESF-18 - Room 007 1 . This room is currently full of data cabling through-out the room. 2. Inside corner to the right of Door 007, at the bottom needs to be sanded and repainted. 3 . West wall, drywall below to the bottom right of the wall stop and above the electrical outlet a chip in the drywall, needs to be repainted. Also, along the electrical outlet cover drywall needs to be sanded and repainted and above the vinyl base in general area on this wall. 4. North wall, drywall around Data TV outlet 15 needs to be patched and repaired and also electrical outlet cover needs to set flush to the drywall to the right of the TV outlet 15. 5 . Scuff marks, fingerprints on the wall need to be repainted. 6. East wall, around electrical outlet needs to be sanded and repainted. Drywall is irregular. 7. Southeast angled portion of the wall left inside corner needs to be repainted where it has patched and repaired. Also to the right of this area fingerprints on the drywall . 8. Electrical outlet to the left of Door 007 drywall is irregular around to the top right of electrical outlet, this needs to be patched and repaired. 9. Three ceiling tiles are missing in this room at this time. 10. Carpet is full of dirt, debris, ceiling tile, pieces of ceiling tile, drywall mud, etc. This area needs to be cleaned and re-inspected once all the cabling material is removed. ESF-17 - Room 008 1 . Hollow metal door frame 008 bottom right on the outside face, dent in the hollow metal frame needs to be patched and repaired and scratch on the head needs to be patched and repaired. 2. Hollow metal door frame bottom left at the carpet needs to be repainted. 3. Drywall above Door frame 008, mark on the drywall needs to be cleaned and repainted. 4. Bottom left drywall of Door 008 drywall is irregular needs to be sanded and repainted. 5 . Electrical outlet cover to the right of TV outlet 16 needs to be cleaned of paint, caulking, etc . 6. Drywall around Data Outlet 19/20C and electrical outlet on the east wall needs to be repainted where it has been patched and repaired around these two items. 7. Electrical outlet to the right of Door 008 drywall needs to be sanded and repainted, irregular. 8 . Vinyl base needs to be cleaned of scuff marks, dirt and debris and drywall mud, etc. 9. Six ceiling tiles have not been set in place at this time. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/ 12/07 June 22, 2007 Page 8 ESF-16 -Room 009 1 . Door 009 outside face needs of be cleaned of glue, dirt, etc. 2 . Bottom left and right of Door frame needs to be repainted where it has been scratched. Also, wood frame for the view light top and bottom needs to be cleaned of glue. 3 . Painters tape needs to be removed from all the electrical outlet cover plates and switch plates . 4. Drywall at the Door 009, head of door frame needs to be repainted. 5 . Vinyl base to the bottom left of Door 009 is not adhered to the drywall . That is also true to the bottom right. 6. West wall left inside corner needs to be sanded and repainted, irregular. 7 . South wall between data outlet and the right inside corner irregularities above the vinyl base needs to be patched, sanded and repainted. 8. Electrical outlet on the south wall needs to be sanded and repainted. Drywall is irregular, pin holes in the drywall finish. 9. East wall, drywall around Data Outlet 43/44C needs to be sanded and repainted, irregularities, pin holes in the drywall finish. 10. East wall left inside corner at the bottom above the vinyl base needs to be sanded and repainted. Drywall is irregular. 11 . Drywall around electrical outlet and TV Outlet 21 needs to be sanded and repainted drywall is irregular. 12. The diagonal cut ceiling tile just above Door 009 comer is chipped. 13 . Four ceiling tiles are not in place at this time. 14. Ceiling tile to the right between the return air grille and the drywall has blue ink on the tile needs to be cleaned or replaced. ESF-19 - Room 010 1 . Hollow metal door frame 010 needs to be touched-up with paint on the bottom edges outside and inside of the door frame. 2. Top right hollow metal door frame jamb, on the inside of the room has over-run of paint, needs to be sanded and repainted. 3. Drywall where it abuts the hollow metal door frame needs to be repainted in numerous areas and also to the bottom left of hollow metal door frame 010 needs to be sanded and repainted. 4. Inside corner to the left of Door 010, just below the metal hinge, drywall is irregular in this corner needs to be sanded and repainted. 5 . Electrical outlet on west wall, where opening is cut too large, irregular drywall needs to be patched, sanded and repainted. 6. Drywall below Data Outlet 37/38 on the south wall , dents in the drywall needs to be sanded and repainted. 7. North wall drywall to the right of electrical outlet, drywall is irregular needs to be sanded and repainted. That is also true of the drywall around this electrical outlet cover plate. 8. North wall to the left of the angled corner and in the angled corner fingerprints on the drywall need to be cleaned and repainted. Also inside corners in numerous areas need to be sanded and repainted. Drywall is irregular. 9. One ceiling tile not in place. 10. Ceiling tile, the 2°d full tile off the south wall and the 3rd full tile off the east wall corner is chipped. 11 . The 3`d ceiling grid is damaged off the south wall and In full ceiling tile off the east wall . Ceiling is bent needs to be replaced. 12. North wall of drywall, head vinyl base and vinyl base needs to be cleaned of glue . Also, scratch in the drywall approximately 2 to 3 feet in from the outside comer needs to be sanded and repainted. 13 . Electrical outlet on the south wall drywall needs to be sanded and repainted where it is irregular and also marks on the drywall to the right of this outlet needs to be repainted. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/ 12/07 June 22, 2007 Page 9 ESF-19 - Room 010 (continued) 14. Drywall to the right of Door frame 012, where it abuts the hollow metal frame needs to be sanded and repainted, irregular. Also, the outside corner between Door 012 & 013 above the vinyl base needs to be sanded and repainted, very irregular. 15 . Drywall above door frame 013 and 012 needs to be repainted, brush marks are showing. Also, to the top left of door frame 103 a mark on the drywall needs to be repainted and fingerprints above Door 012 need to be repainted on the drywall above the right and left corner of Door 012. 16. Drywall around the Johnson Control to the right of Door 013 is irregular, needs to be sanded and repainted and also to the right of this the inside corner is irregular needs to be sanded, caulked and repainted . 17. Bottom left of hollow metal Door 014 drywall is irregular approximately 3ft. off the floor and above the vinyl base in this same area. Needs to be sanded and repainted. 18. Drywall to the right of Door 014 between the hollow metal frame and inside corner this area needs to be sanded and repainted. 19. West wall to the left of door 014, outside corner is very irregular needs to be sanded and repainted and also above the vinyl base in this same area drywall is irregular needs to be sanded and repainted. 20. Drywall to the left of hollow metal door frame 016 needs to be sanded and repainted where it abuts the hollow metal frame and also fingerprints in this same area. 21 . To right of door frame 016, approximately 5ft up on the wall marks on the drywall need to be repainted. 22 . Ceiling grid, I st ceiling grid off the north wall is dirty, needs to be replaced or cleaned the complete length of the corridor. 23 . Inside corner at the drywall header as you are coming off the Multi-Purpose Room 005 , grid is irregular, this needs to be repaired. ESF-15 - Room 012 1 . Outside face of Door 012 needs to be cleaned of glue and drywall mud. 2. Hollow metal frame needs to be touched-up with paint where it has been scuffed on the inside and outside edges. 3 . Bottom right of edge of hollow metal frame just above the vinyl base needs to be repainted. 4. Drywall to the left of hollow metal door 012, left of the bottom hinge needs to be sanded and repainted. That is also true to the left of the middle hinge. 5. Hollow metal door frames need to be sanded and repainted above the top hinge and to the left of the closure. paint over-runs. 6. Drywall at the top right of Door 012, paint finish is irregular needs to he sanded and repainted. 7. West wall bottom left electrical outlet irregularity in the drywall needs to be sanded and repainted . 8. Right hand side corner on the left wall inside corner and drywall on the north wall is irregular, needs to be sanded and repainted. 9. North wall drywall around the electrical outlet needs to be patched and repaired, opening cut too large and also to the top right and right to Data Outlet 27/28D marks on the drywall the complete length of the wall from the data outlet to the right inside corner. 10. Electrical outlet on the east wall drywall needs to be sanded and painted. Drywall is irregular. It . South wall drywall around electrical outlet adjacent to TV Outlet 29 outlet cover needs to be set flush to the drywall . 12. South wall to the left of the electrical outlet and door stop drywall is irregular needs to be sanded and repainted. 13 . One ceiling tile missing. D O N A D I O & Associates , Architects. P.A . Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 10 ESF-14 - Room 013 1 . Scratches on door to the left and at the escutcheon of the lockset, needs to be repaired. 2. Hollow metal door frame on the bottom left at the outside Corridor 011 there is a small dent in the edges , needs to be patched and repaired. 3 . Bottom inside face of Door 013 scratch on the door. Also, adjacent to the escutcheon plate, dirt marks on the door needs to be cleaned. 4. Bottom left of hollow metal Door 013 bottom right needs to be cleaned where paint is on the hollow metal frame. That is also true on the bottom hollow metal frame where it abuts the carpet. 5 . Electrical outlet to the left of Door 013 , drywall needs to be sanded and repainted. 6. South wall to the right of the electrical outlet drywall above the vinyl base chip in the drywall and marks, glue on the drywall needs to be patched and repaired and repainted. 7 . East wall drywall above the vinyl base in numerous areas there is chips, irregularities need to be sanded and repainted. Also, glue and marks on the drywall need to be repainted. 8. North wall above the vinyl base irregularities in the drywall and also around electrical outlet need to be sanded and repainted. 9. Electrical outlet to the right of TV outlet 28, outlet cover needs to be set flush to the drywall . 10. Angled wall to the right of Door 013 , right and left inside corners approximately 2 to 3 Ft. off the floor needs to sanded and repainted. Irregular. Rooms 014 & 015 1 . Door 014 needs to be cleaned of glue on the outside face and also scuff marks/scratch on the finish above the kick plate needs to be repaired. 2 . Drywall above Door 014 needs to be sanded, caulked and repainted where it abuts the hollow metal door frame. 3. To the right of the hollow metal door frame 014 approximately 2ft. off the finished floor needs to be sanded and repainted. That is also true up towards the top right edge of the door frame . 4. Right inside corner, to the right of Door 014, drywall approximately 6- 12 inches needs to be sanded and repainted. 5. East wall just to the right of Door 014, irregularities in the drywall coming up above the vinyl base and approximately 2ft up needs to be sanded and repainted. 6. Outside corner of the north wall, approximately 3ft up, irregularities in the drywall and the corner needs to be sanded and repainted. That is also true up about 4 or 5 ft off the outside corner is chip , drywall mud needs to be sanded and repainted. Also, in this same area joint in the vinyl base in not acceptable . 7 . North wall drywall around the electrical outlet needs to be sanded and repainted. Also, above the vinyl base approximately the first third of this north wall there is a irregularity in the drywall, needs to be sanded and repainted. 8. Drywall around electrical outlet and TV Outlet 33 needs to be sanded and repainted. hregular. 9. East wall, to the left inside corner, marks and fingerprints on the drywall needs to be patched and repainted. 10. Drywall around electrical outlet to the left of Data 33/34D needs to be sanded and repainted. Drywall is irregular. 11 . Drywall to the top right of Data Outlet 45/46D drywall is irregular, needs to be sanded and repainted. That is on the south wall. 12. South wall far right inside corner glue above the drywall needs to be removed and repainted. 13 . West wall drywall around the electrical outlet cover needs to be sanded and repainted and electrical outlet needs to be set plumb and level . 14. North wall adjacent to Room 016 drywall around TV Outlet 32 and electrical outlet in this same area needs to be patched and repaired. Opening cut too large, drywall is damaged. Same wall electrical outlet above the vinyl base drywall needs to be sanded and repainted. Irregularities in the drywall. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 11 Rooms 014 & 015 (continued) 15. North wall the outside corner leading to Door 014 outside corner needs to be sanded and repainted . 16. Drywall above the vinyl base just to the left of Door 014, left wall needs to be sanded and repainted. 17 . Floor box covers not installed at this time. 18 . Ceiling grid in front of Door 014 to the right of the return air grille it looks like it has blue marker or painters tape on needs to be removed or repaired. 19. Ceiling grid at the outside corner adjacent to wall of Room 013 is dirty. 20. Ceiling grid at the west wall leading off of Door 014 approximately 3 tiles towards the center of room is dented and needs to be replaced . 21 . Drywall above Door 014 where it abuts the hollow metal door frame, head needs to be sanded, caulked and repainted . ESF- 13 - Room 016 1 . Carpet in front of Door 016 needs to be cleaned of dirt and debris. 2. Face of Door 016 above the kick plate has scratches on it, needs to be patched and repaired and kick-plate needs to be cleaned of glue. 3 . Inside face of door adjacent to lockset escutcheon plate scratches on the finish of the door. 4. Paint on the wood trim at the view light windows. 5. Screws in the strike where the latch at the lockset needs to be set flush. 6. Drywall where it abuts the head of Door 016 needs to be sanded, caulked and repainted. Also, to the right of the door mark on the drywall at the center hinge needs to be repainted. That is also true of top left of Door 016, marks on the drywall. 7. North wall, drywall around electrical outlet plate needs to be sanded and repainted. Drywall is irregular and electrical outlet needs to be cleaned of paint. 8. West wall, drywall around electrical outlet and Data Outlet 19/20B needs to be sanded and repainted . Also in this same area drywall above the vinyl base needs to be repainted. 9. West wall towards the left inside corner, gouge in the drywall needs to be patched and repaired. 10. South wall , about the middle of the room above the vinyl base pin holes in the drywall, needs to be sanded and repainted and there are some irregularities below the data outlet and to the right of electrical outlet cover plate that needs to be sanded and repainted along with the drywall around the electrical outlet cover. 11 . Left inside corner of the south wall approximately 3ft. up the wall needs to be painted that is the drywall leading into the comer and the corner needs to be sanded and repainted. 12. East wall, about the middle of the wall above the vinyl base irregularities in the drywall need to be sanded and repainted. Also, the electrical outlet cover plate on this wall needs to be set flush to the drywall . 13 . South wall, middle of the wall approximately 2ft. down from the ceiling fingerprints on the wall needs to be repainted. 14. Ceiling tile off the southwest corner needs to be set flush into the grid. ESF-12-017 1 . Bottom left inside corner of door chip in the door of Room 017 . 2 . Drywall where it abuts the hollow metal door frame head needs to be sanded, caulked and repainted. 3. Drywall to the left of the hollow metal door frame 017 that bottom left needs to be sanded, caulked and repainted. 4. Vinyl base to the left of hollow metal door frame 017 irregularity in the drywall behind the vinyl base, base needs to be removed, drywall needs to be sanded and repainted and vinyl base re-installed. 5 . Inside corner on drywall area to the left of hollow metal door frame 017, drywall needs to be sanded and repainted. 6. Wall stop is loose, needs to be secured. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 12 ESF-12-017 (continued) 7 . North wall, drywall above the vinyl base just below the electrical outlet needs to be repainted. 8. Left inside comer of north wall, pin holes in the drywall needs to be sanded and repainted approximately 2ft. up off the floor. 9. West wall , above the vinyl base between the right inside comer and the data outlet irregularities in the drywall needs to be sanded and repainted. 10. Electrical outlet to the left of TV outlet 26, drywall needs to be patched, sanded and repainted. 11 . West wall, lft. before the left inside corner irregularities in the drywall on the west wall and on the south wall a foot off the inside corner and the inside corner just above the vinyl base needs to be sanded and repainted. 12. South wall to the bottom left of Data Outlet 15/16C above the vinyl base the drywall needs to be repainted and dirt and debris needs to be cleaned off the drywall along the complete length of the vinyl base and this wall . 13 . Drywall to the right of Door 017 is irregular needs to be sanded, caulked and repainted. Also, finish just above the light switch is rough and irregular and at the top right of the door frame 017 needs to be sanded and repaired. 14. Screw head showing at the door head just above the closure of Door 017 closure. Needs to be patched and repaired. 15 . Carpet needs to be cleaned of dirt and debris. 16. Ceiling tiles chipped. That is the 2nd full ceiling tile off of the south wall and possibly the center of the room. ESF-11- 018 1 . Hollow metal frame left outside edge needs to be cleaned of red marker. 2. Center of Door 018 needs to be cleaned of dirt and debris, which is just to the left of lockset. 3 . Hollow metal door frame left inside edge above the lockset needs to be sanded and repainted. 4. Wood frame around the view light needs to be cleaned of drywall mud. 5. Bottom left of Door 018 is irregular approximately 2ft. up needs to be sanded and repainted. 6. To the right of electrical light switch, drywall is irregular, needs to be sanded and repainted. That is also true of the electrical outlet on the north wall to the left of Door 108 . 7. Above the vinyl base in numerous areas on the north , west and south walls, chips in the paint, irregularities in the drywall, etc. need to be sanded and repainted. 8. West wall, top left of Johnson ' s Control Box and the bottom left and right in that general area there is irregularities in the drywall need to be sanded and repainted. 9. Drywall around electrical outlet to the right of Data 9/101) needs to be sanded and repainted. Also, on the drywall around Data 11 /12D. 10. South wall, electrical outlet to the right of TV Outlet 25, a hole in the drywall needs to be patched, sanded and repainted. Also, just to the top left of this TV Outlet drywall mud on the wall needs to be cleaned. 11 . Northwest corner on the west wall vinyl base drywall is very irregular behind the vinyl base at this location. Base needs to be removed, drywall needs to be corrected to set flush and smooth and need vinyl base re- installed. 12. Ceiling tile at middle of the room, approximately 2 full ceiling tiles off the north wall, chip in the tile. 13 . Ceiling tile, V full the off the east wall and 2"d tile off the south wall , tile is chipped and also grid in this same area is damaged. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 13 ESF-010 - Room 019 1 . Outside face of Door 019 scratches on the door. 2 . Drywall above hollow metal door frame 019 needs to be sanded, caulked and repainted where it hits the door head. 3. Bottom right hollow metal door frame 019 caulking is pulled away from the door, needs to be patched and repaired. Also, in this same area to the right of the upper hinge, stain on the drywall needs to be repainted. 4. Electrical outlet on the west wall, drywall to the right of the outlet needs to be sanded and repainted. Also, left inside corner of the west wall above the vinyl base needs to be sanded and repainted. Pin holes in the drywall . 5 . South wall to the left of Data Outlet 5/61), drywall needs to be patched, sanded and repainted. Also, just below this data outlet above the vinyl base irregularities in the drywall need to be sanded and repainted. 6. Left end of the south wall escutcheon plate needs to be put on the clean out. 7 . East wall , drywall below the electrical outlet needs to be sanded and repainted, drywall is irregular. Also, outlet cover needs to be set flush to the wall. 8. Drywall at the bottom of TV Outlet 24 needs to be sanded and repainted. Irregular. 9. North wall, drywall around electrical outlet needs to be sanded and repainted. Also, to the bottom left just above the vinyl base irregularity in the drywall at this same location. Needs to be sanded and repainted . 10. Ceiling tile at the northeast corner needs to be set flush into the grid. Corridor 020 1 . East wall adjacent to Room 016 drywall above the vinyl base approximately 4 to 6 ft. in, irregularities and marks on the drywall , need to be cleaned. Also, to the top left of the opening leading to Corridor 011 marks on the drywall, fingerprints need to be cleaned and repainted. 2 . South end of the east wall above the vinyl base, glue needs to be cleaned off the drywall and irregularities in the drywall in this area need to be sanded and repainted. It occurs in approximately in a 6ft. area, approximately 3ft. off the south inside corner. Exterior Door 020 1 . Weather stripping frame needs to be cleaned of drywall mud, paint, etc. Also, screw missing on the bottom left edge. 2. Exterior door kick plate needs to be cleaned of paint, dirt and debris. 3. Left and right outside corners of the drywall on either side of Door 020, needs to be sanded and repainted. 4. Right inside corner to the right of Door 020 needs to be sanded and repainted approximately 2ft. up. 5 . Hollow metal door frame 021 where the drywall abuts a round the bottom 2-3ft. this drywall area needs from the outside corner in needs to be sanded and repainted and hollow metal frame cleaned of drywall dust, paint and debris . 6. Right side of hollow metal door frame 021 where the drywall abuts it needs to be sanded, caulked and repainted. 7 . Top right of hollow metal door frame 021 needs to be repainted. 8 . Drinking fountains need to be re-caulked where they abut the ceramic tile. Caulking is irregular and excessive. 9. Drywall where it abuts the grout joints for the ceramic tile at the drinking fountains, recommend that the grout joint gets painted the same as the wall color. This area does not provide irregularity in an edge contract. 10. Part of ceramic tile where it abuts the drop ceiling over the drinking fountain needs to be cut in properly with paint, very irregular, not acceptable. That is also true of the top right and left edges of the dropped header. Needs to be patched, repaired and repainted. 11 . Carpet edge where it abuts the porcelain floor tile at the drinking fountains, need to be cut in properly. D O N A D I O & Associates, Architects, P.A . Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 14 Exterior Door 020 (continued) 12. Drywall to the top left of Door 022 needs to be sanded and repainted . Drywall is irregular. That is also true of the left side between the middle and bottom hinge. 13 . West wall to the right of Door 002 marks on the drywall along this whole needs to be repainted. 14. Up to the top right inside corner needs to be caulked and repainted. 15 . North wall of Corridor 020 opposite the Restrooms, west end above the vinyl base, drywall irregular for approximately 5-6ft. for the complete length, there is irregularities in the drywall, dents and chips, etc. This needs to be patched and repaired and repainted. 16. Southeast outside corner of Room 017 and Corridor 020 needs to be sanded and repainted. 17 . West wall , the drywall to the left of Door 017 drywall needs to be sanded and repainted around electrical outlet cover. 18 . Drywall above door frame 017 needs to be sanded and repainted and that is also true to the top left of the hollow metal door frame. Women's 021 1 . Ceramic tile floor needs to be cleaned of dirt and debris . 2. Ceramic tile walls need to be cleaned of dirt, debris and access paint and access grout. 3 . Ceramic tile 2x6 trim needs to be cleaned of paint and top edge needs to be cut in where it abuts the drywall. 4. Cove base tile face where it abuts the ceramic tile floor needs to be cleaned of grout. 5 . Accessories need to be cleaned or have protective film removed. 6. Toilet paper holder needs to be secured firmly to the wall . Men's Restroom 022 1 . Ceramic tile floor needs to be cleaned of dirt and debris along with ceramic tile walls. 2. 2x6 ceramic tile top edge trim needs to be cleaned of paint and needs to be properly cut in where it abuts the drywall . 3 . Floor drain cover needs to be cleaned of grout, tape and grout. 4. To the right of hollow metal Door 020 grout needs to be filled in, voids in the grout. That is also true of the left inside corner to the left of hollow metal door frame 022 . 5 . Above the water closet approximately 5-6 tiles above the grab bar voids in the grout, this needs to be filled in . 6. Protective coverings need to be removed from the toilet fixtures . 7. Numerous areas where the vertical grout joints are not filled in . This needs to be corrected. Mechanical Room 023 1 . Door 023 outside face of wood door is a scuff mark about the middle of the door below the lockset. 2. No locksets installed on this door. 3 . Floor needs to be cleaned of dirt and debris. 4. Vinyl base needs to be installed. 5 . All penetrations need to be sealed leaving this Mechanical Room. 6. Any handprints, dirt and debris on the wall need to be touched-up with paint. Corridor 024 1 . Electrical outlet between Door 019 and 023B drywall needs to be sanded and repainted, irregular. 2. Also, this same area to the left, small scuff mark on the wall and irregularity above the vinyl base needs to be sanded and repainted. 3 . Bottom left and bottom right of Door 023B above the vinyl base irregularity in the drywall needs to be sanded and repainted. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 15 Corridor 024 (continued) 4. Middle of the wall to the right of Door 023B mark on the drywall needs to be patched and repaired. 5 . Outsides corners of door opening 024 needs to be sanded and repainted. 6. Carpeting does not extend fully to the threshold, needs to be corrected. Also, carpeting in this area needs to be cleaned of dirt and debris, drywall mud and dust in the area of Door 024. 7. Top right face of hollow metal door frame 024 needs to be sanded and repainted. Finish is very irregular. 8 . Paint needs to be removed from the weather stripping and the weather strip frame that goes around the door. 9 . Drywall opening, right and left metal jamb to Door 024 is very irregular, not plumb. This needs to be looked at not acceptable. 10. To the right of Door 024, drywall above vinyl base needs to be cleaned of dirt, debris, sanded and repainted where it is irregular. 11 . West wall, south inside corner just to the right, irregularities in the drywall need to be sanded and repainted. 12. Drywall above the vinyl base, approximately 6ft. off the south inside corner and 12ft. off the south inside comer, irregularities in the drywall need to be sanded and repainted. 13 . Drywall above the Johnson Control Unit, approximately 3ft., fingerprints on the wall needs to be repainted. 14. Carpet at the intersection of Corridor 024 & 025 , stains in the carpet this needs to be corrected. Also, the carpet color between the Corridors and the Multi-Purpose Room do not match. This needs to be looked at and corrected if possible. 15 . Two ceiling tiles not in place in this area. 16. Ceiling grid above Door 024 is unacceptable, ceiling tile not setting flush. Grid needs to be set level off the drywall . 17 . Ceiling grid does not set flush to the west wall, needs to be corrected. Corridor 025 1 . Top right of Door 026, drywall needs to be repainted. Fingerprints above the header of the door frame and to the right of the door frame at the outside edge of the drywall. 2. Bottom right of Door 026 above the vinyl base drywall, needs to be repainted. 3. East wall, to the left of Door 027, drywall needs to be repainted above the vinyl base in numerous locations and also below the Johnson Control Unit. 4. Drywall to the top left of Door 028, marks on the drywall needs to be repainted and that also true of both door frame 027 . 5 . To the right of door frame 029, marks on the drywall and the outside corner at this location needs to be sanded and repainted. 6. Left inside comer of Door 030 needs to be sanded and repainted . That is also true of the drywall above the vinyl base between the outside and the inside corner to the left of Door 030. 7 . Outside corner, to the right of Door 030, needs to be sanded and repainted. 8 . North wall to the left of electrical outlet, drywall is irregular, needs to be sanded and repainted . Also, drywall around the electrical outlet is irregular needs to be sanded and repainted. That is to the left of the outlet, around the outlet and to the bottom right of the outlet. 9. Center of this north wall above the vinyl base drywall is irregular and dents in the drywall needs to be sanded and repainted. Also, joint in the vinyl base is unacceptable at this area. 10. Ceiling grid just to the left of the A/C grille is damaged, chipped, needs to be cleaned and replaced. ESF-S -Room 026 1 . Outside face of Door 026 scratches on the door below the lockset the complete width of the door and also dirt and fingerprints at the hinge side opposite the view light. 2. To the right of Door 026 bottom right drywall is cracked needs to be patched and repaired . D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/ 12/07 June 22. 2007 Page 16 ESF-8 -Room 026 (continued) 3 . South wall left inside corner bottom corner needs to be repainted and also above the vinyl base at this area drywall needs to be repainted. 4. South wall vinyl base is not adhered completely to the drywall . 5 . To the left of door frame 026, drywall needs to be repainted where the door frame paint has gotten on the drywall. 6. One ceiling tile not in place. 7 . Data outlet on the east wall has not been secured to the junction box. ESF-7- Room 027 & ESF-6 - Room 028 1 . Drywall to the left of door frame 027 is irregular needs to be sanded and repainted. 2. West wall to the left of Door 027 , the west wall adjacent to Room 029, drywall around the electrical outlet cover needs to be sanded and repainted. That is also true about the drywall around TC Outlet 30. 3 . South wall , left inside corner needs to be sanded and repainted and also drywall above the vinyl base on the south wall to the right of this inside corner needs to be cleaned of vinyl base adhesive. 4. East wall, center of the wall needs to be cleaned of dirt and debris. 5 . Drywall around electrical outlet needs to be sanded and repainted. Irregular. 6. Drywall above the vinyl base to the bottom right Data Outlet 37/38B needs to be patched and repaired and repainted. 7. Southwest outside corner that is the southwest corner adjacent to Room 028 needs to be sanded and repainted. 8. East wall, to the right of Door 027 marks on the drywall above the door stop needs to be patched and repaired. That is also true above the vinyl base on the south end of the wall. 9. Right inside corner to the right of Door 027 needs to be sanded and repainted. Very irregular. 10. Carpet at the southeast outside corner of Room 029 needs to be secured to the floor, at this time it is not. 11 . Floor boxes are not installed at this time. ESF-5 - Room 029 1 . Bottom left of door frame 029, dent in the frame, this needs to be repaired. 2 . Bottom right of Door 029 drywall is irregular, needs to be sanded and repainted. 3 . West wall, left inside corner needs to be sanded and repainted . Drywall irregular. That is also true of drywall around electrical outlet on this wall . 4. One ceiling tile not in place. 5 . South wall, 2nd full ceiling tile off the west wall tile is damaged. ESF-4 - Room 030 1 . Outside face of Door 030 glue below the lockset needs to be removed. 2. Inside corner to the right of Door 030 drywall is irregular above the vinyl base needs to be sanded and repainted. 3 . South wall, drywall to the right of the electrical outlet marks on the drywall need to be cleaned and repainted. 4. Right inside comer of the south wall needs to be sanded and repainted. Drywall is irregular. That is also true of the drywall leading into this comer at this same location . 5. Drywall to the left of TV Outlet 18 needs to be sanded and repainted. 6. Drywall to the top left of Data Outlet 25126C needs to be repainted. 7. West wall, the right inside comer approximately up 2-3ft. needs to be sanded and repainted. Irregularities in the corner. 8. North wall between electrical outlet and the left inside corner the drywall above the vinyl base needs to be repainted. 9. North wall „ marks on the drywall to the upper right of Data Outlet 27/28C . D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 17 ESF-4 - Room 030 (continued) 10. Drywall where it abuts the hollow metal door frame on the left side of the hollow metal door frame 030 needs to be sanded and repainted. 11 . Door 030 does not set plumb and hollow metal door frame 030 needs to be adjusted. 12. One ceiling tile not in place. Corridor 031 1 . Drywall to the left of Door 032 marks on the drywall need to be repainted. Irregularities in the drywall need to be sanded and repainted. 2. West end of south wall to the right of Door 032 adhesive needs to be removed from the drywall, cleaned, sanded and repainted. Also, drywall around the electrical outlet needs to be sanded and repainted. 3. To the left of Door 034 bottom left drywall needs to be sanded and repainted at the door frame and at the inside corner. 4. Vinyl base missing on the outside to the right of Door 034. 5 . Fingerprints and dirt marks on the walls need to be repainted in numerous this occurs . 6. Drywall to the left of Door 035 at the hollow metal door frame and approximately 311. to the left at the door above the vinyl base needs to be sanded and repainted, irregular drywall finish. 7 . Top right of hollow metal door frame 035 needs to be sanded and repainted. 8. To the right of door frame 035, the bottom right at the outside corner drywall needs to be patched and repainted. 9. Outside corners leading into Corridor 031 needs to be sanded and repainted . ESF-9 - Room 032 I . Top right of hollow metal door frame 032 drywall needs to be sanded and repainted. 2. Top left at the ceiling drywall is damaged, needs to be patched, repaired and repainted. 3 . All fingerprints and dirt marks on the drywall need to be repainted. 4. Electrical outlet to the left of door 032 needs to be cleaned of paint. 5. West wall to the right of Data Outlet 29/300 damage in the drywall needs to be sanded, patched and repaired just above the vinyl base. 6. South wall, drywall around the Data Outlet 31/32C needs to be sanded and repainted. 7. East wall, drywall around electrical outlet needs to be sanded and repainted. 8. To the bottom right of door frame 032 between the door frame and the inside corner drywall needs to be sanded and repainted approximately 1 ft. to 18 inches up off the floor. ESF-3 - Room 033 1 . Door outside face of the wool door has been scratched above the lockset. 2. Bottom left of window frame for view light needs to be patched and repaired. 3 . To the right of door frame 033 frame has been pulled from the drywall, this needs to be patched, repaired and re-caulked. 4. Door 033 does not set plumb and door frame 033 needs to be corrected. 5 . Bottom right corner of Door 033 needs to be cleaned of glue and adhesive. 6. To the bottom left Door 033 at the door frame 033 opening the drywall needs to be sanded and repainted. 7 . Fingerprints on drywall in this area need to be repainted . 8. North wall, drywall around the TV Outlet 17 and electrical outlet need to be patched and repaired in this area. 9. South wall, drywall around electrical outlet, cover plate needs to be sanded and repainted where it is irregular. That is also true of the bottom right of that same outlet. 10. South wall between Date Outlet 23/24 and left inside corner above the vinyl base drywall is irregular needs to be sanded and repainted . D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22. 2007 Page 18 ESF-3 - Room 033 (continued) 11 . Right inside corner to the right of Door 033 needs to be sanded and repainted. 12. Light fixture parabolic lens is damaged. That is the light fixture at the far end of the room to the west end. ESF-2- Room 034 1 . Outside face of Door 034 needs to be cleaned of glue and red marker. 2. Drywall to bottom left of hollow metal door 034 needs to be sanded and repainted. 3 . North wall drywall around electrical outlet and Data Outlet 3/4C needs to be sanded and repainted . Also, drywall above the vinyl base between electrical outlet and left inside corner of north wall needs to be sanded and repainted. Drywall irregular. 4. West wall, drywall around electrical outlet needs to be sanded and repainted and electrical outlet cover needs to be set flush to the wall . 5 . South wall, drywall around TV Outlet 12 needs to be sanded and repainted. Opening cut too large. 6. South wall above the vinyl base and to the left of the electrical outlet, marks on the wall need to be cleaned and repainted. 7. Door wall stop is loose, needs to be re-secured. 8 . Ceiling tile in front of Door 034 to the right of the light fixture, chipped. ESF-1- Room 035 1 . Outside face of door needs to be cleaned of glue to the bottom right of lockset. 2. Drywall to the bottom of hollow metal door frame 035 needs to be sanded and repainted. 3 . Top right corner of hollow metal door frame 035 is dented, needs to be repaired . 4. South wall to the bottom right of electrical outlet, marks on the drywall need to be repainted . 5. Drywall around TV Outlet 14 needs to be patched, repaired and repainted. _Break Room 038 & Food Preu. 039 1 . Outside face of Door 038 at bottom left lockset, scratches in the finish. 2. To the left of door frame 038 drywall needs to be patched and repaired about 2ft. off the floor. 3. Fingerprints and marks on the walls need to be painted. 4. East wall, to the right of Door 039 drywall around electrical outlet needs to be patched and repaired at the top right and also the bottom right a gouge in the drywall needs to be patched and repaired above the vinyl base. 5 . No fire extinguishers installed at this time. 6. Top right of Door 039 is dented needs to be repaired. 7. Drywall above Door 039 needs to be patched and painted . 8 . Wall stops at Door 039 is loose, needs to be secured. 9 . Drywall between 039 and the base cabinets need to be cleaned of dirt and debris on the wall. That is in the location of where the refrigerator location is. 10. All cabinetry needs to be cleaned of dirt inside and out, door and drawers need to be set adjusted be level and plumb. 11 . Countertop is unacceptable, front face of counter should be at least 1 inch overhang off the base cabinet and is very uneven and irregular. Cabinet drawer faces extend out past the edge of the countertop, this is unacceptable this needs to be corrected. 12 . Vinyl tile needs to be installed under the ice maker location and drywall in this area needs to be patched and repaired and vinyl base installed. 13. Sink needs to be caulked where it abuts the countertop. 14. Vinyl tile is cut short of the cabinetry on the exterior west wall, this needs to be corrected. 15 . West wall of vinyl base, where it abuts the face of the kitchen base cabinet, cut too short, this needs to be extended . D O N A D I O & Associates, Architects, P.A . Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22. 2007 Page 19 Break Room 038 & Food Prep. 039 (continued) 16. Exterior windows need to be cleaned of drywall mud, paint. etc. 17. Window sills need to be caulked where the drywall abuts the underside of the Corian sills . 18 . South wall, drywall around the electrical outlet and Data Outlet 1/2C need have drywall sanded and repainted . Irregular. Also, scuff marks and pencil marks on the drywall need to be patched and repaired. 19. South wall, drywall around electrical outlet to the left of TV Outlet 13 needs to be sanded and repainted. 20. Carpet and vinyl threshold transition needs to be installed at Doors 038 & 039. 21 . Right hand corner to the right of Door 038 vinyl tile not installed. 22. First accent pattern that is in front of Door 039 there is only 2 tiles wide in width and length. Pattern accent tile is extending under the vinyl base this needs to be the field tile, this needs to be corrected. 23 . The 5d' ceiling grid off the north wall and V full tile off the east, grid is damaged needs to be repainted or replaced. 24. The 3rd and 7th ceiling grid off the north wall is damaged needs to be replaced and that is the I " full tile off the exterior wall which is the west wall. 25 . VCT flooring needs to be cleaned and waxed as per the specifications. 26. East wall center of the wall vinyl tile is short of the vinyl base, concrete slab is exposed. Also, in this Same area the joint in the VCT tile unacceptable, too large. 27 . VCT needs to be caulked where it abuts the hollow metal door frames . Janitors Room 040 1 . No lockset installed in Door 040. 2. Hollow metal door frame is damaged at the top right corner and at the right and left side of the door. 3 . Door needs to be cleaned of carpet adhesive below the lockset opening on the outside face and the inside face of the door. 4. Drywall ceiling around the A/C vent needs to be sanded and repainted and the vent needs to he set flush to the ceiling. 5 . Mop shelf needs to be cleaned of protective covering. 6. Ceramic file walls need to be cleaned of dirt and debris. That is also true of the ceramic tile floor. 7. Ceramic tile where it abuts the drywall needs to be cleaned of paint and cut in properly. 8. Ceramic tile cove where it abuts the mop sink is broken and chipped on the right side. This needs to be corrected and marker needs to be removed from the ceramic tile in this location. Mechanical Room/Electrical Room 041 1 . Door 041 no lockset installed. 2. Exterior face of Door 041 scratches on the door. 3 . Floor needs to be cleaned of dirt and debris and base installed at the walls . 4. All marks, fingerprints , dirt, etc., needs to be cleaned up off the walls and walls need to he painted. 5 . Drywall to the right of the hollow metal door frame 041 needs to be sanded and repainted, drywall irregular. That is also true of the head of the hollow metal door frame where the drywall abuts it. 6. No fire extinguisher installed at this time. 7 . Electrical outlet to the Door 041 opening cut too large, drywall needs to be patched, repaired and repainted. 8 . Floor drain needs to be cleaned of tape and concrete. 9. All penetrations in the drywall need to be sealed properly for rated and non-rated walls . D O N A D I O & Associates, Architects , P.A. Indian River County Emergency Operations Center Interior Punch List - Tuesday - 06/12/07 June 22, 2007 Page 20 General Notes: 1 . All closures need to be adjusted to meet the ADA 51b Closing Force. 2. All view light window wood frames have holes for the fasteners, need to be putted. 3 . All silencers need to be installed in the hollow metal door frames. 4. All fire extinguisher cabinets need to be caulked where they abut the drywall. 5 . All flush valves need to be checked to make sure there are batteries installed. Toilets not flushing. 6. All electrical outlet covers in the larger Multi-Purpose Room need to be cleaned of paint, etc . 7 . All hollow metal door frames need to be repainted approximately 12 inches up from the floor on both right and left sides inside and out, and also where the hollow metal frame abuts the carpet. Scratches, glue, etc. on the hollow metal frames . Typical conditions . 8. All carpet tiles the joints need to be set flush and level in the field, along the walls and at the doors. 9. The vinyl base where it abuts the hollow metal door frames, on either side, needs to be cut tight to the door frame and need to be secured or glued in place. 10. All kick plates need to be cleaned of fingerprints , glue, etc. 11 . All carpet needs to be vacuumed and cleaned in all the rooms, etc. 12. All the electrical outlet plug devices, not the cover plates need to be cleaned of paint. 13. No outside or inside preformed vinyl base corners have been installed. 14. All rooms wherever fingerprints and dirt marks occur need to be repainted. 15 . Hollow metal door frames where they abut the vinyl floor tile needs to be caulked. End of Interior Punch List of 06/12/07 D O N A D I O & Associates, Architects, P.A. ID200 7. -ID D O N A D I O & Associates, Architects, P. A. TO: LOU FIORE TURNER CONSTRUCTION STEVE BLUM INDIAN RIVER COUNTY LYNN WILLIAMS INDIAN RIVER COUNTY TOM FRAME INDIAN RIVER COUNTY JIM LEVERONI DONADIO AND ASSOCIATES FROM: ANTHONY J. DONADIO, AIA, NCARB DONADIO & ASSOCIATES, ARCHITECTS, P.A. DATE: FRIDAY - JULY 6, 2007 ISSUE DATE: SUNDAY —JULY 089 2007 PROJECT NO. 5054.18 REGARDING: INDIAN RIVER COUNTY EMERGENCY OPERATIONS CENTER EXTERIOR BUILDING PUNCH LIST TIME: 2: 00 P.M. WEATHER: SUNNY & HUMID EOC Exterior Building Punch List East Elevation 1 . Main entrance doors leading into the front Lobby top right corner needs to be re-caulked, paint finish is chipped and caulking. 2 . Threshold at main entrance door needs to be caulked where it abuts the concrete. 3 . Sides of main entrance doors at the strike side and the outside edges need to be repainted. 4. Covered entrance concrete sidewalk needs to be cleaned of stain, dirt and debris, etc. 5 . To the right of the front entrance door concrete slab and sidewalk has paint on it needs to be cleaned. 6. Covered entry area wall opposite the front entrance doors need to be repainted. 7. Covered entry area wall opposite the front entrance doors, the south and north inside corners have dirt and debris in it and also smudges on the wall. 8 . Front entrance covered entry metal drip edge needs to be cleaned of paint and tar on the north and south sides where it abuts the building and front face. 9. Front left south corner of the metal drip edge, caulking needs to be removed from the bottom edge. 10. North face of the covered entry , the left bottom panel needs to be repainted and the right middle panel needs to be repainted, smudge marks and white paint on the panel. RECENED 609 17'h Street Vero Beach, Florida 32960 Phone 772 794 2929 Fax 772 562 8600 JUL 2 '� 200 1 7 Email daa@donadio-arch.com License No. AA0002238 TURNER IRC Emergency Operations Center Exterior Building Punch List - Friday - 07/06/07 July 08, 2007 Page 2 East Elevation (continued) 11 . Exterior windows to the right of the front entrance door top track for the impact screen needs to be caulked to the tilt-up panel. Also, some areas around this panel have not been painted. 12. To the left, south of the covered entry junction box is still taped over. This is not to be used, needs to be plated or removed. 13 . Below hose bibb need to repaint panel. Dirt and smudge marks . That is typical throughout the bottom accent color of the building. 14. Fifth panel to the south or the left of the covered entry, smudge marks on the filed color needs to be repainted . 15 . Sixth panel at the Yd lower accent tile from the covered entry, finish around this area doesn't have sufficient coats of paint, pin holes in the paint finish, needs to be re-coated. 16. Fourth panel from the south corner needs to be patched up with paint. 17 . Second panel from the south corner, the bottom panel needs to be recoated with paint, concrete is exposed, does not appear to have sufficient coat of paint, pin holes expose the concrete . 18 . Finial on the Flag Pole seems to be bent. This needs to be checked to make sure it is secured and plumb. South Elevation 1 . To the right of the easternmost concrete entrance cover, pin holes in the paint finish in numerous areas starting at the east comer and coming towards the easternmost covered entry. Insufficient coats of paint, concrete is exposed by pin holes, etc. . 2 . First accent tile to the right of the easternmost covered entry on the south elevation needs to be repainted at the outside edges, concrete exposed. 3. Eastern covered entry on the south elevation joints and bottom left panel to the bottom left of the ceramic tile concrete finish is showing, paint is peeling off the panel. 4. Inside east covered entry clip angles for the concrete tilt-up walls need to be caulked at the voids where the steel angles abut the concrete panels and repainted. 5 . Interior alcove leading to the easternmost exterior door needs to be repainted. Dirt on the walls and throughout appears to be insufficient coats of paint on the side panels to the left and right sides of the door. 6. Top joint above easternmost door on the south elevation needs to be re-caulked, caulk joint is cracking just above the light fixture. 7. Inside panel opposite the entrance door of the southeastern covered entry, corners and wall opposite the door need to be repainted, dirt throughout. S . Threshold at exterior doors leading to Mechanical Room needs to be caulked at the concrete sidewalk. 9. To the right of exterior Mechanical Room door, abandoned emergency drain line opening left in the pre-cast panel needs to be sealed and caulked. 10. Southwest covered entry — steel clip angles need to be caulked where they abut the pre-cast panels. 11 . Threshold needs to be caulked at the southwest entrance exterior doors where it abuts the concrete. 12. Right and left inside corners leading to the exterior door, at the southwest enclosure, needs to be repainted, insufficient coats of paint. 13. To the left or west of the southwest covered entry caulking between the concrete slabs and the tilt-up panels is pulled away from the building, needs to be re-caulked. West Elevation 1 . Second panel to the north from the south corner of the west, paint finish has been damaged at the bottom, needs to be patched and repaired. 2. Fifth panel in from the south corner of the west elevation upper panel imperfections in the finish in two locations , needs to be corrected. Same occurs on the seventh panel in from the south corner of the west elevation, imperfections in the panel finish need to fixed and repainted. D O N A D I O & Associates, Architects, P. A. IRC Emergency Operations Center Exterior Building Punch List - Friday - 07/06/07 July 08, 2007 Page 3 West Elevation (continued) 3 . West exterior , top track for the impact screen needs to be caulked where it abuts the pre-cast panel . 4. Precast panel joint above the southernmost window on the west elevation, insufficient finish inside the joint, paint finish needs to be redone. 5 . Exterior door leading into the Mechanical Room off the Equipment enclosed area, threshold needs to be caulked where it abuts the concrete slab. 6. Penetrations thru the west exterior wall at the Equipment enclosure for Electrical, A/C , etc. this needs to be sealed. Electrical conduit, at main service panel, going into the building has not been sealed where it penetrates, that is the same also for small electrical conduit to the right of the automatic transfer switch. 7. Inside screen wall opposite the Emergency Generator, joint between pre-cast panels is very rough and irregular, not uniform. Exposed edges of concrete need to be painted. 8. Back wall A/C enclosure opposite the Emergency Generator there is void in the gravel area underneath the panel, needs to be filled in. 9. South end of the Emergency Generator gravel area appears to have more dirt than gravel, this needs to be cleaned and leveled, insufficient thickness of gravel. Need more gravel installed so that no dirt comes through or is visible. 10. Recess above pair of doors leading into from the enclosed Equipment area, between the transfer switch and the light, has not been painted, needs to be painted. 11 . Outside west face of the Equipment enclosure, center of sodded area wet soil just, at the edge of the pavement need to check and see if no lines are broken or if this is condensate area. 12. North end of west elevation, near the Utility Main, two conduits projecting out of the pre-cast panel above grade are left open , if these are not being used they need to be closed off. North Elevation 1 . First panel off the west corner of the north elevation, center panel finish is irregular, needs to be patched and repaired. Also, in this same area at the west corner of the north elevation, finish is damaged on the bottom panel, needs to be patched and repaired. 2. Western most covered entry area outside face the north face accent color needs to be cut in properly to the reveal joints. 3 . Inside West covered entry on the north face, steel angles needs to be caulked where they abut the concrete and repainted. 4. Inside West covered entry, left and right inside corners of the panel opposite the entrance door and also the right and left panels adjacent to the entrance door need to be repainted. That includes the right and left inside corners. 5 . North Elevation, Center covered entry, area inside corners opposite the door and on right and left sides of the doors need to be repainted. 6. North Elevation, Center covered entry, clip angles needs to be caulked where they abut the concrete. 7 . Tilt up Panel below the hose bibb needs to be cleaned of dirt and debris. 8 . Tilt-up panel to the left of the exterior intake grille , imperfection in the panel, this needs to seen if this can taken care of with the paint finish. 9. East covered entry on the north elevation; clip angles needs to be caulked where they abut the panel and repainted. 10. Right side East covered entry on the north elevation, above opening leading into exterior entry door alcove, pre-cast panel has been damaged needs to be patched and repaired. Also, true in this same area where the ceiling and the wall panel meet, needs to be re-caulked. 11 . Left and right panels and left and right inside corners adjacent to the easternmost exterior entrance door on the north elevation need to be repainted. D O N A D I O & Associates, Architects, P.A. IRC Emergency Operations Center Exterior Building Punch List - Friday - 07/06/07 July 08, 2007 Page 4 GENERAL NOTES: 1 . All spacers at the ceramic accent tile need to be removed. 2 . All ceramic accent tiles, the edges of the tile need to be painted to match the adjacent surface color. 3. Pre-cast panel reveal around the perimeter of the accent tile do not have the finish coat of paint on it. Paint needs to be applied. Just the primer on the panel at this time. That occurs at numerous locations. 4 . All joints at the tilt up panels, the caulked joints and the reveal joints, edges of the recess do not have sufficient coats of finished paint. 5. Perimeter of accent tile on the building needs to be caulked, that is the void between the backside of the tile and the concrete panel, prior to being painted. 6. All metal drip edges on the covered entry areas and the main building, need to have any bleed over from the tar and paint removed from the finish. 7 . All exterior walls need to be touched-up with paint where there is dirt, scratches, etc . on all four elevations where this occurs. 8. All exterior door thresholds need to be caulked where they abut the concrete sidewalk. 9. All concrete entry pads leading into all exterior doors needs to be cleaned of dirt, debris and paint. 10. Aluminum gates at the Satellite Farm and dumpster enclosures finish is unacceptable. Panel faces of the gates, have been ground in certain areas giving the panels a uneven finished look. Not acceptable. 11 . Provide verification of exterior coating finish millage meets manufactures specifications, Some areas paint finish seem thin . END OF EXTERIOR BUILDING PUNCH LIST FOR EMERGENCY OPERATIONS CENTER , D O N A D I O & Associates, Architects , P.A. 'D D O N A D I O & Associates, Architects, P.A. TO: LOU FIORE TURNER CONSTRUCTION STEVE BLUM INDIAN RIVER COUNTY LYNN WILLIAMS INDIAN RIVER COUNTY TOM FRAME INDIAN RIVER COUNTY JIM LEVERONI DONADIO AND ASSOCIATES FROM : ANTHONY J. DONADIO, AIA, NCARB DONADIO & ASSOCIATES, ARCHITECTS, P.A. DATE: FRIDAY - JUNE 15, 2007 ISSUE DATE: JUNE 22, 2007 PROJECT NO, 5054.18 REGARDING: INDIAN RIVER COUNTY EMERGENCY OPERATIONS CENTER INTERIOR PUNCH LIST TIME: 2:00 P.M. WEATHER: SUNNY / CLEAR Radio / Communications Room 037 1 . Carpet needs to be cut in place at Door 037, where the carpet and the access flooring meet and have proper transitions strip. 2. Door 037, right side edge above the middle hinge has chipped. 3. Hollow metal door frame needs to be cleaned of fingerprints and repainted, especially above the carpet and between the top and middle hinge. 4. Closure for Door 037 needs to be adjusted so that the door latches properly at the strike. 5 . Wall stop needs to be installed for Door 037. 6. Access flooring installed, no vinyl base installed at this time. 7 . Drywall at the access flooring intersection needs to be corrected, very irregular and rough, not acceptable to receive vinyl base. 8 . Walls need to be touched-up in numerous locations where there is fingerprints and red pencil marks, etc. That is typical of all walls throughout. 9. Drywall around quad electrical outlet to the left of Data Outlet 37/37AD needs to be sanded and repainted, very irregular. 10. Column A2, drywall box out left corner edge of this drywall boxed column needs to be sanded and repainted in numerous areas and edges are very irregular and uneven, need to be corrected . RECEIVED 609 17th Street Vero Beach, Florida 32960 Phone 772 794 2929 Fax 772 562 8600 Email dm@donadio-arch.com License No. AA0002238 JUL 2 Q 20017 lUtaNLK Indian River County Emergency Operations Center Interior Punch List - Friday - 06/15/07 June 22, 2007 Page 2 Radio / Communications Room 037 (continued) 11 . Ceiling grid above Door 037 , where the grid abuts the drywall, needs to be set flush and be cleaned of any drywall mud, etc . 12. Ceiling grid around boxed out column A2 needs to be fixed, very uneven and irregular. 13. The 2"d full ceiling tile off the south wall and 2"d full ceiling tile off the west wall , tile is chipped. Also, in this same area ceiling grid is dirty . 14. Ceiling grid in the southeast portion of the room, between the two light fixtures and the A/C Grille is dirty, needs to be cleaned. Mapping Room 042 1 . Hollow metal door frame 042 needs to be touched-up with paint at the base. 2. Vinyl base to the left of the hollow metal door frame 042 is not cut tight to the door frame. 3 . Insulation of the pair of doors 042 gap between the doors seems excessive, strike does not engage sufficiently. Also, closures needs to be adjusted so the door closes and latches properly. 4. Left side door without lockset does not set plumb into the door frame, bottom edge left side is lower than the right side door panel . 5 . Drywall above hollow metal door frame 042 needs to be sanded, caulked and repainted. 6. Drywall around light switch to the left of door 042 needs to be sanded and repainted. 7 . Fingerprints, dirt marks, glue, etc . needs to be cleaned and drywall repainted in these areas, especially true of the north wall above the duplex outlet, large stain on the wall . 8 . South wall, drywall around the electrical outlet needs to be sanded and repainted. 9 . Drywall around electrical outlet and TC outlet #1 needs to be sanded and repainted , drywall is irregular. 10. West wall, to the left or south of the duplex outlet there is a gouge in the drywall and irregular above the vinyl base, this needs to be corrected, sanded and repainted. 11 . The 2"d full ceiling tile off the west wall adjacent to the light fixture and caddy comer from the supply air grille, centered in line with Door 042, tile is damaged at both corners needs to be replaced . Radio / Radiology - Room 043 1 . Door 043 , numerous areas have glue or scuff mark on the door on the outside face, corridor side. 2. Right side Door 043 above the vinyl base approximately 6-8 inches drywall needs to be sanded and repainted, very irregular. 3 . Top right corner drywall needs to be sanded and repainted where hollow metal door frame paint from the drywall . 4. Bottom left of Door 043 vinyl base not cut tight to the hollow metal door frame . 5 . Electrical outlet to the left of door frame 043 drywall needs to be sanded and repainted. 6. East wall, jog in the drywall outside corners need to be sanded and repainted where it has been chipped above the vinyl base . 7 . Fingerprints, dirt marks, stains, etc. on the drywall areas need to be cleaned and repainted where they occur in this room. 8 . Electrical outlet covers need to be set plumb. 9. Drywall around TV outlet #2 and electrical outlet in this same location need to be sanded and repainted . Very irregular. 10. South wall, west end approximately 2ft. in from the right hand side corners , drywall needs to be sanded and repainted. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/ 15/07 June 22, 2007 Page 3 Storaee Room 044 1 . Corridor side of door face 044 needs to be cleaned of glue and scratch marks, and also red marker throughout the whole face of the door. 2. Strike side of door above the lockset needs to be cleaned of paint and also chip on the inside edges of door, needs to be patched and repaired. 3 . South wall, left inside corner needs to be sanded and repainted above the vinyl base and also drywall needs to repainted. 4. Electrical Data Outlet 13AD & 14AD drywall needs to be sanded and repainted around the perimeter. 5 . Scuff marks, vinyl base glue, stains, etc, on the walls need to be cleaned and repainted where they occur, especially along the west wall above the vinyl base and the north wall . 6. Vinyl tile needs to be cleaned of scuff marks, dirt, etc . and adhesive. 7 . Vinyl tile is cut too short along the west wall near the electrical outlet. ESF-911 - Room 045 1 . Door 045 , corridor side needs to be cleaned of dirt, glue, etc . 2. Drywall to the left of hollow metal door frame 045 at the middle hinge needs to be sanded and repainted, drywall is irregular. Also, adjacent to the lower left hand side drywall is irregular needs to be sanded and repainted. 3 . South wall drywall around electrical outlet needs to be sanded and repainted. Also, south wall at the boxed out Column A4 needs to be cleaned of drywall dust all over the vinyl base and the carpeting. Outside corners need to be sanded and repainted. Drywall above the vinyl base has a bow in it, needs to be corrected. 4. East wall drywall around the electrical outlet cover needs to be sanded and repainted around it and below it. Marks in the drywall , irregularities , etc . Also, painters tape needs to be removed from electrical outlet and data covers. 5. South wall between electrical outlet and the right inside corner, gouges in the drywall needs to be patched and repaired. 6. Left inside corner, south wall needs to be sanded and repainted above the vinyl base. 7. North wall to the bottom right of the data outlet and to the bottom left of the electrical outlet above the vinyl base drywall is irregular needs to be sanded and repainted. Also, drywall around data outlet and electrical outlet needs to be sanded and repainted, drywall is irregular. 8 . North wall, left inside corner above the vinyl base, approximately 18-24 inches need to be sanded and repainted. Very irregular. 9. West wall , to the left of the right inside corner drywall needs to be sanded and repainted above the vinyl base . Also, on this wall electrical outlet cover plate needs to be set flush to the drywall. 10. Fingerprints, dirt marks, stains, etc . need to be cleaned and repainted where they occur, especially on the north wall directly above the electrical outlet approximately 6ft. high and to the right approximately 3ft. high. 11 . At this time one light fixture is open, appears to being worked on. 12. Ceiling grid at the center of the room off the north wall to the right of the westernmost light fixture, grid is cut too short, the 3" grid off the north wall, this needs to be replaced . 13. The 2n1 ceiling grid off the west wall in front and between the return air grille and the 2x2 light fixture finish is damaged on the grid . EMD SA - Room 047 1 . Bottom left of Door 048 , drywall on the outside face needs to be sanded and repainted above the vinyl base and also nicks on the drywall in this area need to be corrected. 2. Vinyl base needs to be set tight to the hollow metal door frame at Door 048 and 049. D O N A D I O & Associates , Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/15/07 June 22, 2007 Page 4 EMD SA - Room 047 (continued) 3 . To the left of hollow metal Door 048 at the bottom left above the vinyl base drywall needs to be sanded and repainted and also on other areas along the vinyl base between door frame 048 and left inside corner which is to the right of door 049. 4. To the right of hollow metal door frame 049, drywall where it abuts the hollow metal frame needs to be sanded, caulked and repainted the complete length. 5 . South wall above the vinyl base to the bottom right of the electrical outlet and to the left of Door 049 needs to be sanded and repainted. Damaged drywall and also vinyl base adhesive needs to be removed from the wall. 6. Drywall around Data Outlet 7 & 8B and around the duplex electrical and quad outlets needs to be sanded and repainted. 7. South wall ceiling grid is unacceptable, it is a double ceiling grid with no tile between the two grids, this needs to be corrected and Fixed. Unacceptable . Production / Storage Room 048 1 . This room is locked at this time. Unable to access. EMD Room 049 1 . Outside face of Door 049 on the hinge side, scratches in the door finish. 2 . Carpet needs to be cut tight to the hollow metal door frame and secured to the floor. 3 . Electrical outlet on the west wall drywall around this outlet needs to be sanded and repainted. Drywall is very irregular, unacceptable. 4. West wall between the electrical outlet and Door 050B large irregularity in the drywall behind the vinyl base, this is unacceptable needs to be corrected and base reapplied. 5. South wall, drywall around electrical outlet needs to be sanded and repainted. Also, to the left of the electrical outlet and to the right of the left inside corner glue on the drywall needs to be removed and repainted. 6. Drywall around electrical outlet cover adjacent to TV Outlet #9 on the south wall needs to be sanded around the edges of the cover. 7 . West wall, drywall around duplex outlet and Data Outlet 9/10B needs to be sanded and repainted, irregular. Also, to the left of the electrical outlet above the vinyl base same condition, irregularity in the drywall. 8. Left inside corner the southwest comer of the east wall drywall needs to be sanded, caulked and repainted. 9. North wall , drywall around Data Outlet 5/613 and electrical outlet needs to be sanded and repainted, irregular at drywall. 10. Fingerprints, dirt, scuff marks on the vinyl base all need to be cleaned where they occur. 11 . Ceiling tile needs to be set flush in the grid and no edges exposed. Tile is cut short needs to be replaced . 12. Ceiling tile above Door 050B appears to be cut short, needs to be adjusted to set flush in the grid or be replaced. 13. Ceiling tile at the center of the north wall, the 4 h full ceiling tile off the west wall to the right of Door 050, needs to set flush in the grid or be replaced. Also, grid in this area is very irregular, uneven needs to be repaired about the center of the wall. EMD Conference Room 050 1 . Bottom edge of Door 050B, facing the EMD Room 049, full of glue needs to be removed. That is also true above the lockset glue and paint on the door finish. 2. To the left of Door 050B , on the EMD side Room 049, vinyl base not secured to the wall or cut tight to the hollow metal door frame. 3 . Recessed ceiling can lights in this room are not operable at this time. 4. Bottom left of hollow metal door frame 050B needs to be painted just above the carpet. 5 . Drywall around TV Outlet 8 and electrical outlet in this location needs to be sanded and repainted. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/ 15/07 June 22, 2007 Page 5 EMD Conference Room 050 (continued) 6. West wall above the vinyl base between Door 050B and to the right of the electrical outlet, scratches and dent in the drywall, needs to be patched and repaired. That is also true of the drywall below the data outlet and to the left of data outlet there are scratches and dent. 7 . Electrical outlet below the borrowed light windows need to be sanded and repainted, opening cut too large. Also, to the right of that approximately Ifoot '/2 inches, a hole in the drywall needs to be patched and repaired. 8 . Borrowed light #5 bottom right comer hollow metal frame is damaged. 9 . Drywall around the perimeter of the borrowed light 5 & 6, hollow metal frame paint is on the drywall, needs to be corrected and cut in neatly completely around both windows . 10. Sill of borrowed light #6, the hollow metal face of the sill face of the frame, paint is irregular, looks like it has peeled and been repainted, unacceptable needs to be sanded and repainted. Also, below this sill, screw heads are exposed and drywall is chipped at the left corner. 11 . Scuff marks on the drywall and chips in the drywall above vinyl base to the right of Door 050 and to the left of Data 41 /42B. 12. Outside face of Door 050, where the locks in the middle of the door, scratches on the finish and also fingerprints and dirt marks on the door throughout. 13 . Floor outlet is still not finished being cut into the carpet. 14. The ceiling grid above the right comer of Door 050B is chipped. That is also true of the ceiling grid above the left corner of 050B the 2"a tile off the door. 15 . The I " ceiling tile off the west wall and 3`s full ceiling rile off the south wall is chipped. 16. Ceiling grid above the borrowed lights and in that general area is dirty in numerous places . 17. Ceiling tile to the north of the return air grille, between the return air grille and Door 050B adjacent to the return air grille, tile is chipped . Men 's Vestibule 052 1 . Bottom right of hollow metal frame of Men' s Vestibule, drywall above the vinyl base the inside face of the hollow metal frame, drywall to the right needs to be sanded and repainted, very irregular. That is also true of the right inside corner between the hollow metal opening and Door 053 . 2. Left inside corner needs to be sanded and repainted don the inside corner and both intersection faces of the drywall above the vinyl base . Drywall is irregular. 3 . South wall drywall above the vinyl base needs to be sanded and repainted approximately 12 inches up off the vinyl base . Also, vinyl base in this area is unacceptable, a lot of irregularities in the drywall behind the vinyl base, this needs to be removed and corrected. 4. East wall above the vinyl base needs to be sanded and repainted. Also, approximately 1 'h feet in from the right inside corner drywall is irregular needs to be sanded and repainted. 5 . Center of the ease wall approximately 3 ft. off the floor dents and irregularities in t he drywall need to be sanded and repainted. 6. Drywall to the right of Door 053 needs to be sanded and repainted from the vinyl base up approximately 3 ft and up along the complete length of the hollow metal door frame. Drywall is irregular. 7. Drywall to the left hollow metal door frame 053, needs to be sanded and repainted from the head down to the top of the vinyl base. Men's Restroom 053 1 . Door 053 needs to be cleaned of dirt and debris on the outside face. Also, on the inside face bottom edge below the bottom hinge the complete width of the door needs to be cleaned of grout. 2 . Strike plate for the dead bolt opening in the hollow metal frame needs to be patched and repaired. 3 . Top edge of the door has paint on it needs to be cleaned. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/15/07 June 22, 2007 Page 6 Men's Restroom 053 (continued) 4. 2 x 6 black tile trim needs to be cleaned of grout and also paint on top of the tile needs to be completely removed and cut in with paint properly. 5 . All tile needs to be cleaned of grout. 6. Below vanity drain line that are cut into the wall at the ceramic tile need escutcheon plates installed. Also, tile needs to be cleaned dirt and debris. 7 . Where the porcelain tile floor meets the ceramic cove base, left inside corner under the vanity and to the left of the right sink drain line, voids in the grout, this needs to be patched and repaired. 8. Urinal screens need to be secured properly to fit tight to the lavatory countertop, not acceptable as it exists . 9. Backsplash in the left inside corner and along the left side of the sink needs to be caulked properly, needs to be cleaned of drywall dust and re-caulked. 10. Left inside corner of ceramic tile to the left of the sink lavatory, void in the grout, joints, this needs to be corrected approximately up 3 tiles. 11 . Ceramic tile around the Urinal flush valve is unacceptable approximately 9 tiles in line behind the flush valve, full of grout, uneven, cracked, not setting flush to the wall needs to be removed and replaced. Also, caulking around the urinal is unacceptable. 12. All escutcheon plates at the flush valve where the supply line comes through the wall needs to be set tight to the wall in all bathrooms. 13. Toilet partitions needs to be cleaned of dirt and debris. 14. Water closet in single stall, floor needs to be cleaned of grout around the perimeter of the water closet and also on the water closet where there is grout. 15 . Floor tile needs to be cleaned of dirt and debris. 16. 2 x 6 ceramic tile base top edge has a void in it where it abuts the drywall and that should be fully grouted in to the complete length of the trim. 17 . Toilet accessories need to be cleaned of protective covering. 18 . Handi-capped stall , wraps for the plumbing line, the vinyl wraps are not installed properly, need to be removed or replaced. Also, caulking around the perimeter of the lavatories is unacceptable, very irregular and sloppy. 19. Hangers for the lavatory, these are the wall hangers, do not appear to be secured properly, sink moves when pressure is applied to it. 20. Ceiling in the Handi-capped stall at the light fixture needs to be sanded and repainted where it has been patched and repaired . That is where it is up against the east wall between the light fixture and the wall. 21 . Fingerprints on the ceiling above the Handi-capped stall needs to be cleaned and repainted. Shower Area 054 1 . Hollow metal frame in the opening leading to shower area 054 needs to be repainted where it is scratched . 2. To the right of hollow metal frame, light switch needs cover installed. 3 . Mirror in not properly installed, its loose, can be pulled apart and pulled away from the wall . 4. Tile around soap dispensers need to be repaired, openings cut too large, unacceptable . 5 . Ceramic tile needs to be cleaned throughout. 6. Ceramic tile in the easternmost Handi-capped shower stall, tile around soap dispenser grout is missing, looks like tile broken out and reapplied, unacceptable needs to be repaired or replaced. 7. Where shower/ceramic tile walls abut the ceiling, tile needs to be cleaned of grout and paint and cut in neat. 8. East wall around the shower head and to the right of the shower rod, voids in the grout needs to be patched and repaired. This occurs all over this area in numerous locations. That is also true of the inside corner of the shower. 9. A/C Grille needs to be cleaned of grout, etc. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/15/07 June 22, 2007 Page 7 Shower Area 054 (continued) 10. Ceiling around the exhaust grille needs to be touched-up with paint where there is scratch marks and fingerprints. 11 . Drywall around the showers need to be sanded smooth and repainted, irregularities around the light fixtures for the shelves . Women's Restroom 056 1 . Door 055, inside face dirt on the doors, glue, etc. 2 . Above kick plate on the inside face, the mirror finish is damaged. 3 . Hollow metal door frame needs to be touched-up with paint at the outside edges above the top and bottom hinges . 4. Light switches need to be cleaned of paint. 5. Right inside corner of countertop or where the 2 backsplash meets, needs to be caulked at that intersection and at the grout joints. 6. Ceramic tile needs to be cleaned of marker and glue, etc . around the mirrors . 7 . Toilet accessories need to be cleaned. 8 . Ceramic tile below the lavatory countertop needs to be cleaned of dirt and debris, drywall mud and caulking. 9. Plumbing line where it penetrates the wall at ceramic tile needs escutcheon installed. 10. Ceramic tile floor needs to be cleaned, especially underneath the sink and lavatories where it abuts the cove base . 11 . Countertop needs to be cleaned of glue, marker, etc. 12. All ceramic tile needs to be cleaned of paint and drywall mud where ever it occurs throughout. 13 . Floor drains need to be cleaned of grout, tape, etc. 14. 2x8 black trim needs to be cleaned of paint on the top and cut in properly where it abuts the drywall finish. 15 . Ceramic tile wall around the water closet needs to be cleaned of caulking and drywall mud. 16. Caulking or grout around the base of the water closet needs to be cleaned up, excess needs to be taken off the water closet. 17 . The left inside corner, to the left of the water closet, needs to be grouted in numerous area voids in the grout joint. 18 . All green marks needs to be removed from toilet accessories and ceramic tile. 19 . Lavatory sink, in the Handi-caped stall, needs an escutcheon where the drain lines penetrate the ceramic tile wall . 20. Top right inside corner of the ceramic tile, where the trim meet, small piece cut very irregular, unacceptable needs to be repaired or replaced. 21 . Caulking around sink between sink and the mirror is excessive needs to be cleaned and done properly. 22. Drywall around supply air grille needs to be repainted at the Door 055 . 23. Drywall where it meets the ceiling, above the lavatory and the paper towel holder, area needs to be sanded and repainted, very irregular. 24. Drywall around exhaust fans, over the toilet stalls, need to be repainted. Also, drywall between the light fixture and the exhaust fan in the Handi-capped stall needs to be touched-up with paint in numerous areas. 25 . Inside corner of drywall , where the drywall and ceiling meet above lavatory and Handi-capped stall, needs to be repainted. Shower Area 056 1 . Hollow metal frame in the Shower area 056, label is painted over on the bottom left side this needs to be removed, sanded and repainted . Also, on the inside shower area hollow metal frame needs to be repainted at the top right where it has been damaged. 2 . Left and right inside corners to the ceramic tile base at the lockers need to be grouted. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/15/07 June 22, 2007 Page 8 Shower Area 056 (continued) 3 . Wall tile where it abuts the ceiling, the complete perimeter of the shower area is unacceptable, voids in the grout, excess paint on the tile. This needs to be done properly. Need to caulk, repaint and cut-in , etc. unacceptable. 4. Shower stalls, ceramic tile needs to be cleaned dirt, debris, markers, etc . at the ceramic tile. 5 . Ceiling A/C diffuser does not set flush in the framing, needs to be corrected. 6. Drywall over the Handi-capped shower and drywall around the light fixture is irregular. Needs to be patched sanded and repainted. Women's Vestibule 057 1 . Outside of Door 057, between the lockset and the dead bolt, glue on door needs to be cleaned off. 2. To the left of the hollow metal door frame of Vestibule 052, inside the Vestibule needs to be sanded and repainted the complete length. 3. Vinyl base, to the left of door frame 057, is not setting flush to the drywall, the debris behind the vinyl base needs to be removed, sanded and repaired to receive vinyl base. That is also true to this whole right inside corner. 4. Right inside corner, to the right of door frame 057, needs to be sanded and repainted approximately at the same level as the dead bolt lockset. 5 . Strike for dead bolt opening in the hollow metal frame needs to be closed off. 6. To the left of hollow metal door frame 057, drywall needs to be sanded and repainted the complete length. Also, vinyl base in this area to the left of the bottom hinge is unacceptable. Drywall finish behind vinyl is very irregular. 7 . North wall, drywall above vinyl base is irregular needs to be sanded and repainted. 8 . Left inside corner of the north wall needs to be sanded and repainted approximately 3ft. up. 9. Drywall to the right of the metal door frame for Women ' s Vestibule 057 needs to be sanded and repainted. 10. Hollow metal frame at the opening to area 057 needs to be repainted, finish is scratched in numerous areas. 11 . Drywall where it abuts the Door 056 needs to be sanded and repainted where it abuts the head of the hollow metal frame. Open Office Area 058 & 062 1 . Outside comers, to drywall opening leading into this area, needs to be sanded and repainted, that is the drywall comers both left and right sides. 2 . Fingerprints, dirt marks and pencil marks, etc ., need to be patched and repaired or repainted in these areas where they occur. 3. West wall, painters tape needs to be removed from the electrical outlet devices. 4. North wall adjacent to Storage Area 059, to the left of Data Outlet 21/22A, irregularities in the drywall needs to be sanded and repainted. Also, on this same wall to the bottom right of electrical outlet that is adjacent to Date Outlet 17/18A, drywall needs to be sanded and repainted. 5 . Drywall comers leading into Alcove Area 060 needs to be patched, repaired and repainted. 6. North wall, the wall adjacent to Storage Room 061 quad outlet, drywall around that area needs to be sanded and repainted. Also, quad outlet adjacent to Data Outlet 27/28A cover plate missing. Drywall in this area has fingerprints, dirt marks, etc . , needs to be cleaned and repaired. 7 . East wall to the right or between the two electrical outlets scratch on the drywall approximately 18-24 inches up off the floor and also about 8 inches off the floor, irregularity in the drywall needs to be patched and repaired. 8. West wall, the l't ceiling grid off the west wall in front of the A/C diffuser is damaged and bent, needs to be replaced. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/ 15/07 June 22, 2007 Page 9 Open Office Area 058 & 062 (continued) 9. Light fixture diffuser is damaged at the east end of the light fixture directly in front of the Johnson Control Unit. 10. The I " ceiling grid off the north wall, approximately 3 full tiles left of the drywall opening leading into Vestibule 060, is bend, damaged needs to be replaced. IL All ceiling tiles need to set flush in the grid. Exposed edges should not be visible. 12 . Ceiling to the top left of entrancing the Vestibule 060 is duty, edges exposed and raveled, damaged. 13. Return air grille in the area 062 off the north wall of Storage Room 061 is dirty and ceiling grid is bent in this area. Storage Room 059 1 . This room cannot be punched out at this time. It is full of construction material , ladders, contract documents, cabling, etc. Alcove 060 1 . Exterior Door 060 needs to be repainted, cleaned where there is scratch marks, dirt, paint, etc. 2. Closure for door 060 needs cover plate installed. 3 . Hollow metal door frame needs to be touched-up with paint. 4. Outside corners of drywall to the right and left of Door 060 needs to be sanded and repainted, it has been damaged. Also vinyl base is not properly adhered. 5 . Fingerprints on drywall around the Exit Sign needs to be cleaned and repainted . 6. Drywall around the light switch to the right of Door 060 has dirt marks on it needs to be cleaned and repainted. 7. To the right and bottom left of Door 061 to the Storage Room, drywall needs to be sanded and repainted, very irregular. Storage Room 061 1 . Door is locked, unable to punch this room out at this time. Corridor 063 1 . Outside corners to the left of Door 064 needs to be sanded and repainted. 2. Drywall between Doors 064 & 065, irregularities above the vinyl base and also dirt on the wall at the vinyl base and up approximately 5ft. off the floor. 3. Drywall above Door 065 needs to be cleaned and repainted. 4. Drywall where it abuts the hollow metal door frame on the top right corner of Door 065 and the top right side, needs to be sanded and repainted. 5 . Drywall between Door 065 and exterior Door 063 areas above the vinyl base are irregular needs to be sanded and repainted. Also, dirt marks on the wall . 6. Outside corner, that is the left and right comers of drywall leading at Door 063, needs to be sanded and repainted. Also, vinyl base in this area scuff marks and dirty. 7. Exterior Door 063, weather stripping frame needs to be cleaned of dirt, debris and paint. Also, left side above the exit device hole in the frame for the weather stripping needs to be patched and repaired 8. To the left of Door 066, drywall where it abuts the hollow metal frame, needs to be sanded and repainted up to the lockset area on the door. Also, vinyl base in this area drywall appears to be irregular behind the base, this needs to be corrected. 9. Hollow metal Door 067 right side dent in the frame . D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/ 15/07 June 22, 2007 Page 10 Production Room 064 1 . Room locked. Unable to inspect at this time. Conference Room 065 1 . No lockset installed in this door at this time. 2 . Outside face of door above the kick plate glue and scratches on the door. 3. Can lights are not operating at this time in the room. 4. Boxes of ceiling tile and ceiling grid are in this room at this time. 5 . Availability of light in this Conference Room makes it limited to be able to do a proper inspection. 6. East wall towards the left inside corner scratches in the drywall above the vinyl base needs to be patched and repaired and repainted . 7. Fingerprints, dirt marks, pencil marks, etc . , need to be repainted. 8. West wall, just to the left inside comer irregularity above the drywall needs to be sanded and repainted. 9. Bottom left of Data Outlet 35/36A, glue on the drywall needs to be cleaned from the drywall. 10. Four box outlet is not in place at this time. 11 . Ceiling tile to the top left of Door 066 between the two can lights, V full ceiling tile off the east wall is chipped . 12. Ceiling tile at the 3`d can light directly in front of Door 066 is damaged, cracked. 13. Ceiling tile in the northwest comer of the room, around the can light the far corner can light is dirty. 14. Ceiling tile along the east wall, between the northernmost two can lights that is right off the wall, is chipped. EMC Room 066 1 . Outside of Door 066, scuff marks on the face of the door, paint, etc. needs to be cleaned . Drywall frame needs to be cleaned of dirt and debris. 2. Drywall above hollow metal door frame 066 needs to be patched and repaired where screw heads it is exposed. 3 . West wall far right inside comer just above the vinyl base, dent in the drywall needs to be sanded and repainted. 4. North wall, drywall around electrical outlet and data outlet needs to be sanded and repainted, irregular. Also to the top right of the electrical outlet in this same area indentation in the drywall needs to be patched and repaired. 5 . Far right corner of the north wall needs to be sanded and repainted approximately 2ft. up . 6. South wall to the right approximately 2-3ft of the left inside corner, dirt marks on the drywall and drywall is irregular. 7. Drywall around electrical outlet and TV outlet #7 needs to be sanded and repainted. 8. Ceiling grid at the far southwest corner to the right light fixture is damaged at the 2nd grid off the back wall or north wall. Planner Room 067 1 . Inside face of door to the lockset, hollow metal door frame, paint on the door needs to be removed . 2. Drywall above door frame 067 needs to be sanded and repainted . 3 . Drywall around light switch to the left of Door 067 needs to be sanded and repainted . 4. Left inside comer of the west wall the south inside corner needs to be sanded and repainted above the vinyl base . 5 . Northeast inside corner the right inside comer on the north wall , drywall needs to be sanded and repainted above the vinyl base. 6. Electrical outlet needs painters tape removed at the outlet to the right of TV Outlet #6 . D O N A D I O & Associates, Architects , P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/15/07 June 22, 2007 Page I1 Planner Room 067 (continued) 7. Top joint between the drywall and the hollow metal of Door 067 needs to be re-caulked to the right of the top hinge. Also, right inside corner to the right of Door 067 needs to be sanded and repainted, gouge in the drywall. 8. Closure is not set level with door, needs to be corrected. 9. Ceiling tile above the top right of Door 067 is chipped. 10. Ceiling grid is chipped, that is the I " full ceiling grid off the south wall and the 3rd full ceiling tile off the east wall, ceiling rile is chipped. 11 . Ceiling grid at the center of the room off the east wall has dirt on it. Ceiling tiles in this area need to be set flush and level to the grid, no exposed edges. Reception Area 068 1 . Door 068, no lockset installed at this time. 2. Door needs to be cleaned of dirt and debris. 3. Countertop pass-thru needs to be cleaned of drywall dust, dirt and debris. Drywall needs to be sanded and repainted around the window frames and drywall opening, very irregular. 4. Channel for the fire shutter needs to be cleaned and repainted. 5 . Under countertop steel angle needs to be primed and painted to match the wall. 6. Ceiling tile where the fusible link line extends thru the ceiling, cut in the tile is unacceptable, needs to be a neat cut. 7 . Drywall below Data Outlet 33/34 is irregular needs to be sanded and repainted. 8. East wall, drywall below Siemens box, needs to be repainted, fingerprints on the wall. 9. Exterior window sill needs to be cleaned of dirt and debris. Window frame needs to be cleaned of paint, drywall mud, etc. and underside of window sill needs to be caulked where it abuts the drywall . 10. To the left of exterior window fire caulking on the wall needs to be cleaned. 11 . North wall, below the quad outlet and to the right of the quad outlet, drywall is very irregular needs to be sanded and repainted. 12 . Drywall above vinyl base between Data Outlet 35/36D and the left electrical outlet, pencil marks on the drywall need to be repainted. 13. Right outside corner on the drywall of west wall outside corner of Room 069 is chipped and also this wall needs to be repainted above the vinyl base glue on the drywall, scuff marks, etc . 14. Two ceiling tiles missing at this time. 15 . Ceiling tile in front of the exterior windows the 1 " full ceiling off the exterior wall and to the right of the A/C grille and light fixture corner is cracked. 16. Ceiling grid where it abuts the header leading into Corridor 063 not setting flush to the wall . 17 . Perimeter grid ceiling tile not seeing flush and perimeter in numerous locations especially where the perimeter grid and the cross grid meet. Rumor Control / Conference Room 069 Door locked, unable to punch out at this time. Corridor 036 1 . South end, drywall between Doors 038 & 035 marks on the drywall above the vinyl base needs to be repainted. 2. Ceiling tile to the top left of Door 038 is chipped at the inside corner. 3. Light fixture just to the right of Door 038 prismatic lens is missing. 4. Drywall above Door 038 needs to be sanded and repainted where it abuts the hollow metal frame . D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/15/07 June 22, 2007 Page 12 Corridor 036 (continued) 5 . Drywall to the right of Door 038, approximately 6ft. above the vinyl base, dent in the drywall and the patched area is unacceptable and also on the scuff marks on the vinyl base. 6. About the center of the wall between Door 038 and 039 marks on the drywall needs to be repainted. 7 . To the left of Door 039 drywall above the vinyl base needs to be sanded and repainted. 8. Drywall above Door 039, where it abuts the hollow metal frame, needs to be sanded and repainted. 9. To the right of Door 039, drywall where it abuts the hollow metal frame from floor to top of frame needs to be sanded and repainted. Irregular. 10. Door 040 is damaged on the right and left jambs and at the head and the top right corner. 11 . Drywall to the left of Door 041 needs to be sanded and repainted where it abuts the hollow metal frame. Also, above this door marks on the wall need to be cleaned and repainted . 12 . Ceiling tile directly to the top right of Door 040 and to the left of light fixture, chip in the tile and marks on the grid . 13 . Bottom right of Door 041 where drywall abuts the hollow metal frame needs to be sanded and repainted. 14. Lens cover missing on light fixture and to the south of Corridor 046 adjacent to the Exit light. 15. Top right of Door 043 marks on the drywall need to be cleaned and repainted and also to the right of top of the door frame 043 irregularity in the drywall needs to be sanded and repainted . 16. Exterior Door 036, frame for weather stripping needs to be cleaned of paint and set flush to the frame. 17 . Left and right outside corners of the drywall at Door 036, needs to be sanded and repainted. 18 . Drywall between Doors 040 & 050, spots on the drywall and dirt marks etc, the whole length needs to be sanded and repainted in numerous areas . 19. Bottom right and to left of Door 045 frame is damaged. 20. East wall to the right of Corridor of 046 and in between Corridor 046 and electrical outlet, irregularities in the drywall from the floor up approximately 30 inches need to be sanded and repainted . That is also true to the right of this electrical outlet approximately 6ft plus or minus . 21 . Drywall at the east wall numerous areas the length of this wall to the south of 046 scratches in the paint from roller, fingerprints, etc . this need to be redone. 22. Vinyl base scuff marks to the left of Door 037 , approximately loft. in length . 23 . Ceiling grid is bent the ceiling gird in front of the 2nd light fixture to the north of the south wall of Corridor 036. 24. The ceiling tile to the south of the light fixture in front of Door 041 is damaged. Corridor 046 1 . Ceiling grid at the intersection of Corridor 046 & 036 is bent. 2. Ceiling tile in front of the opening of Office Area 058 & 062, fingerprints on the ceiling tile. 3 . The outside comer of the south wall at the intersection of Corridor 051 & 046 at Vestibule 057, needs to be sanded and repainted. 4. Drywall to the left of Corridor 051 , between Corridor 051 and Door 069 approximately 4-5ft. in, in that comer and approximately 2-3fr. off the floor, drywall is irregular, pencil marks , glue, etc. this area needs to be cleaned, sanded and repainted. 5. Center of the wall between Corridor 051 and 069 approximately 2ft. up, irregularity in the drywall needs to be sanded and repainted. 6. Drywall above Door 069 needs to be cleaned of fingerprints and painted. 7 . Drywall to the bottom right and left of Door 069 needs to be sanded and repainted . 8 . The northeast outside corner at the intersection Corridor 036 & 046 needs to be sanded and repainted. Also, in this area approximately 5fr. of vinyl base is scuffed, needs to be cleaned. 9. Edges of the drywall opening leading into Office Area 052 and 068 needs to be sanded and patched and repainted. D O N A D I O & Associates, Architects, P.A. Indian River County Emergency Operations Center Interior Punch List - Friday - 06/15/07 June 22, 2007 Page 13 Corridor 046 (continued) 10. Paint finish in this area fingerprints, roller overlaps, etc., the length of the wall , this needs to be discussed with the Contractor. Corridor 051 1 . West wall, outside corner of the northwest corner needs to be sanded and repainted . 2. Clean-out needs to be set flush to the carpet at the northwest corner below the Johnson control box at EMD area 047 & Corridor 051 . 3 . Drywall around electrical outlet on the west wall to the left between EMD 047 & Door 050A, drywall needs to be sanded and repainted around the electrical outlet and then to the left and right of this area, drywall is irregular needs to be patched and repaired. Also the vinyl base in this area is scuffed. 4 . Drywall to the left of Door 050A needs to be sanded and repainted above the vinyl base approximately 18-24 inches and drywall above the door frame of 050A needs to be repainted, fingerprints on the paint. 5 . Drywall between Door 050A and 051 , approximately 6ft. to the left of Door 050A and about 6ft. off the floor, dent in the drywall. Also, on this wall between Door 050A and 051 in numerous area are scuff marks , dirt marks, etc. need to be sanded and cleaned. 6. Right and left sides of jambs of drywall between hollow metal jambs 051 needs to be sanded and repainted, drywall is very irregular. 7 . Bottom left of Door 051 on the east wall just above the vinyl base drywall is irregular in this area. 8 . To the right of Door 003B drywall needs to be sanded and repainted. That is also true of the left side above the vinyl base. 9 . Drywall to the right of hollow metal opening 052 - Men' s Vestibule drywall needs to be sanded and repainted approximately 8- 10 inches up the wall . 10. Ceramic tile floor and carpet needs to have transition strip installed. 11 . To the right of the drinking fountain area on the south end, drywall is irregular in this area needs to be sanded and repainted. 12. Top right comer at dropped header, drywall has crack in it, needs to be sanded, patched and repaired. 13. Ceramic tile where it abuts the drywall ceiling has no grout installed, void between the tile and the drywall, needs to be corrected and properly cut in. 14. Left edge of the drinking fountain area where the drywall abuts the ceramic tile, needs to be sanded and finished smooth and repainted . 15. Drywall between drinking fountain and opening to Women ' s Vestibule 057 at the center, irregularities in the drywall patched area still visible, needs to be sanded, patched and repaired. 16. Outside corner at the intersection of Corridor 046 and 051 , left or northeast corner of Vestibule 057 needs to be patched, sanded and repainted. 17 . Ceiling grid along the east wall to either side of the drinking fountain is not setting flush to the wall . Wall is not built straight and plumb, this is an issue and needs to be taken care of. 18. Paint finish in this area fingerprints, roller marks, etc. , visible, this needs to be corrected. General Notes: 1 . All closures need to be adjusted to meet the ADA 51b Closing Force. 2. All view light window wood frame holes for the fasteners need to be filled in. 3 . All silencers need to be installed in the hollow metal door frames. 4. All fire extinguisher cabinets need to be caulked where they abut the drywall. 5. All flush valves need to be checked to make sure there are batteries installed. Toilets not flushing. D O N A D I O & Associates, Architects, P.A . Indian River County Emergency Operations Center Interior Punch List - Friday - 06/ 15/07 June 22, 2007 Page 14 General Notes: (continued) 6. All hollow metal door frames need to be repainted approximately 12 inches up from the floor on both right and left sides inside and out, and also where the hollow metal frame abuts the carpet. Scratches, glue, etc. on the hollow metal frames . Typical conditions. 7. All carpet tiles the joints need to be set flush and level in the field, along the walls and at the doors . 8. The vinyl base where it abuts the hollow metal door frames on either side needs to be cut tight to the door frame and need to be secured or glued in place . 9. All kick plates need to be cleaned of fingerprints, glue, etc. 10. All carpet needs to be vacuumed and cleaned in all the rooms, etc. 11 . All the electrical outlet devices, the plugs not the cover plates, need to be cleaned of paint. 12. No outside or inside preformed vinyl base corners have been installed. 13. All rooms wherever fingerprints and dirt marks occur need to be repainted. 15. Hollow metal door frames where they abut the vinyl floor file needs to be caulked. End of Interior Punch List of .Tune 15. 2007 D O N A D I O & Associates, Architects, P.A.