Loading...
HomeMy WebLinkAbout2007-420 ATTACHMENT 1 NOV U 92M CHANGE ORDER No. 1 PROJECT 12" Force Main between Wabasso and Ad-A DATE OF ISSUANCE EFFECTIVE DATE OWNER Indian River County Utility Department OWNER's Contract No. 2007060 ' M&M Project No. 0649 CONTRACTOR- SPS Contracting Inc ENGINEER-Earl H . Masteller, P. E DEE You are directed to make the following changes in the Contract Documents: Description : Tie in modification to Lift Sta . on east side. Reason for change order: Wet tap not possible due to bad existing pipe Lift Station Rehab Attachments: List documents supporting chane Cost Estimate Exhibit CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Times $308 . 708. 25 Substantial Completion : N/A Ready for final payment: Das or dates Net changes from previous Change Orders Net change from previous Change Orders No._ to No. No. to No. $ N/A N/A davs Contract Price prior to this Change Order Contract Time prior to this Change Order $308. 708.25 Substantial Completion: N/A Ready for final payment: Das or dates Net Increase (Decrease) in this Change Net Increase in this Change Order Order N/A $49 .069.00 days Contract Price with all approved Change Contract Time with all approved Change Orders Orders $357, 777. 25 Substantial Completion: N/A Ready for final payment: Das or dates RECOMMENDED: APPROVED: ACCEP By.- By: t --�e Engi`neee`r`�(Au onzed ignature) Owne Authorized Signature) Contra or (Autthhonzed ignature) Date: _�� l lol Date: 12 Date: b 7 EJCDC No. C-700 (2002 Edition) ' r ATTACHMENT 2 IRCUD 12" Force Main CR 510 Wabasso Bridge to A1A Change Order # 1 Cost Exhibit Item Description Quantity Unit I Unit Price Total 1 14 " HDPE Pie 400 LF $ 31 . 30 $ 12 , 520 . 00 2 12" Gate Valve 3 EA $ 3 , 200 . 00 $ 9 , 600 . 00 3 12" x 6" Cross 1 EA $ 1 , 575 . 00 $ 1 , 575 . 00 4 12" Tee 1 EA $ 1 , 575 . 00 $ 1 , 575 . 00 5 12" MJ Ta Ca 1 EA $ 310 . 00 $ 310 . 00 6 10" Gate Valve 1 EA 21800 . 00 7 6" C900 PVC 40 LF $ 19 . 50 $ 780 . 00 - 8 6" Gate Valve 2 EA $ 11654. 00 $ 3308 . 00 - 9 Rehab WetWell w/ B Pass Pum 1 LS $ 261301 . 00 $ 267301 . 00 10 Lift Station Dewatenn 1 LS $ 11500 . 00 $ 1 , 500 . 00 11 12" Wet Ta w/Gate Valve 2 EA $ 5 , 600 . 00 $ 11 , 200. 00 Change Order #1 Total Cost $ 49 , 069 . 00 Hand digging of a trench is from exiting grade to bottom of the trench . Partial hand digging of a trench is not considered a hand dug trench . The rate for hand digging is $32. 50 per linear foot and will be an addition to the contract if encountered . fa 0'7 Earl H . Masteller E. , DEE Date President Masteller & Moler, Inc. Prepared by Masteller & Moler, Inc. /Ikb Rev 5 Revised File #0649 Cost Exh_Chg Ord #1110807 Page 1 of 1