_ Indian River County Department of Utilities
DEDUCTIONS ADDITIONS,
COST ESTIMATE and CONTRACTOR'S BID ITEM LIST Attachment
C �yya � „ �
Project: CR 512 Phase III Roadway Improvements . Revised July 21, 2006 A 1. LR 111 11 _ 1-
Description: Utility Relocations
31-.Iul-06 LABOR COSTS _
Bid Bid Item Estimated Unit of Labor Unit Total Labor
Item No. Description Quantity Measure Price Price 1 -
4% 9
77 Mobilization 1 $ ,387 .07
- _.
78 Demobilization 1 1 % $2,346.77
79 Maintenance of Traffic l l % $2,346.77
Bid Item Il-3 Sewer Pipe 8" DIP 134 LF _
__
32d Install 8" DIP Force Man 0.1LF $9.50 $ 1 ,273.00
ecan
7a Install-Mechanical Restraint Joint on Existing 8" Main 5.0
5.0 EA $333 .00 $ 1 ,665.00
09 Make Connection to Existing Main 1 .0 EA $795.00 $795.00
- - _
23 Test Holes/Potholes 4 EA $200.00 $800.00 $60000 '
_ - Bid Item L44 - Sewer Pipe 10" DIP 110 LF - - - - -
32d --- Install 10" DIP Force Main 110.0 LF $ 10.80 $ 1 , 188.00
Mechanica
traint Joint on
ing
3,000.00
70; Install. ---Make
Hol s/o Existi glMainO'-l2" Main FA $795 .00 $795.00
$11 EA $200. 00 $200.00 l $1 ,000.00
Bid Item U-5 - SewerPipe 10" HDPE (Directional Bore) LOM0 LF 1 I
0Install 10" DPEhorizontal Directional Drill 1 ,050.0 LF $25.00 $29400.00 - - - - -- ! -
Install Mechanical Restrained Joint Fittings 0.50 "fON $1 ,665.00 $832.50
066
76 Install Mechanical Restraint Joint on Existing 10'- 12" Main 4.0 EA $500.00 $2,000.00
09 Make Connection to Existing Main 2 .0 EA $795.00 $ 1 ,590.00 '
19c Install 10" NRS Plug Valve & Box 2 EA $635.00 $ 1 ,270.00 -$ 1 ,200.00
23 Test holes/Potholes 10 8A $200.00 $2,000.00
-__- - ---- - -
496 Install 2" Air Release Valve with ARV Manhole & Structure 2 EA $400.00 $800.W -$800.001 '
Rid Item U-6 - Sanitary 10" Plug W/Valve Box and Concrete 1 EA I '
19e Install 10" NRS Plug Valve & Box I EA $635.001 $635.00 -$635.00 t i
T 1
Bid Item U-7 - Sanitary 8" Plug w/Valve Box and Concrete Pad 1 EA
19d ' Install 5" NRS Plug Valve & Box I FA $48000 $480.00 -$480.00
- -Bio Item U-8 - Sanitary Sewer Air Release Manhole (4' wide) 2 EA
Already Included in Pricing for J-5 10" Directional Bole 2 .0 EA $0.00 $0.00
_ Bid Item U-9-- Air-Relief Valve 2 EA
Alread Included in Pricing tor 10" Directional Bore
Y b 2.0 GA $0.00 50.00
y
t c _
_ Indian River County Department of Utilities _
DEDUCTIONS ADDITIONS
COST ESIIMATEa I CONTRACTOR'S ed July 21, LIST Attachment ___ . .
_. . _-_ Attachment 6 . .
Project: CR 512 Phase III RoadwayImprovements - Revised July 21, 2006 I i
Description: Utility Relocations
31-Jul-06 ILABORCOSTS li
4--
Item
. - ._ .
Bid Bid Item Estimated Unit of Labor Unit Total Labor T
Item Na _ Description QuantityMeasure Price Price
_ . -y_ 1 y-____- - 2 EA
Bid Item U-10 Sanitary Sewer Adjustment Ass 8" DIP
Y P $3,400,400 00
05c Install 8" HDPE b Oen Cut 40.0 LF $85.00 $3,400.00 _
(include e en
06 Install Mechanical Restrained joint Fittings 0.80 TON $ 1 ,665 .00 $ 1 ,332.00
07a Install Mechanical Restrained Joints on Existing 3 8 Main q EA $333.00 $ 1 ,332.00 i _ I
_
09 Make Connection to Existing Main 4.0 EA $795.00 $3 , 180.00
-_
23 Test Holes/Potholes 4 FA $200.00 $800.00 _ $800.00 _
Bid Item U-11 Sanitary Sewer Adjustment Assy 10" DIP 1 EA
_ (include (4) 45 Bend)
05d Install 10" HDPE by Open Cut 26.0 LF $90.00 $2,340.00 F $2,340 00 ADDITIONAL SANTIARY SEWER _
06 Install Mechanical Restrained Joint Fittings 0.50 TON $ 1 ,665.00 $832.50 $832. 50 ADJUSTMENT ASSEMBLY
76 Install Mechanical Restraint Joint on Existing 10'-12" Main 2.0 EA $500.00 $1 ,000.00 $ 1 ,000 00 NOT IN QUOTE I
_
09 Make Connection to Existing Main 2.0 EA $795.00 $ 1 ,590.00 $ 1 ,590.00 ,__ - h
23 Test Holes/Potholes 0 EA $200.00 $0.00 _ _ $800.0O �, REQUIRED POTHOLES NOT IN
ORIGINAL QUOTE
Rid Item U-12 Sanitary Sewer Adjustment Assy 12" DIP i !
(include (4) 45 Bend) 3 EA
OSe Install 12" HDPE by Open Cut 78 .0 LF $95 .00 $7,410.00 $5, 100.001 additional line stop required west of bridge
OG Install Mechanical Restrained Joint Fittings 1 .95 1 TON $ 1 ,665 .001 $3,246.75
7b Install Mechanical Restraint Joint on Existing 10'- 12" Main 6.0 EA $500.00 $3,000.00 _
09 Make Connection to Existing Main 6.0 EA $795.00 $4,770.00 -
23 Test Holes/Potholes 6 EA $200.00 $ 1 ,200.00
Bid Item U-13 - Sanitary Sewer Fittings 8" x 10" Increaser 1 EA
O6 Install Mechanical Restrained Joint Fittings O. 13 TON $1,665.00 $216.45 -$216.45
Bid Item U-14 - Sanitary Sewer Fittings 8" 45 Bneml 1 EA
06 Install Mechanical Restrained Joint Fittings 0.22 TON $1 ,665.00 $366.30 -$366.30
Bid Item U-15 - Sanitary Sewer Fittings 10" 45 Bend 1 EA
pG _ Install Mechanical Restrained Joint Fittings 0.69 TON $ 1 ,665.00 $ 1 , 148.85 -$1 , 148.851
_ _ .
Bid Item U-16 - Sanitary Sewer Fittings 12" 45 Bend 1 EA
_ 06 Install Mechanical Restrained loin[ Fittings 0.84 TON $1 ,665.00 $ 1 ,398 .60 $2,940.00
Bid Item 11-18 - Potable Water Main 8" DIP 254 LF
__
2d Install 8" DIP Water Main 254.0 LP $9.60 $2,438 .40
__ . ___
7a Install Mechanical Restraint Joint on Existing8" Main 11 .0 EA $333 .00 $3,663 .00 _
0 ) Make Connection to Existing Main 1 .0 EA $795.00 $795.00 _
23 "I est Holes/Potholes I EA 1 $200.001 $200.00 1 $200.00 _ ADDITIONAL POTHOLES REQUIRED
Indian River County Department of Utilities
DEDUCTIONS ADDITIONS
_ COST ESTIMATE and CONTRACTOR'S Bill 1'1'EM LIST' Attachment
**�nL. m „ *
Pro'ect:
CH 512 Phase III Roadway Improvements - Revised July 21, 2006 A 1, L 1. 11111 111.
Description: Utility Relocations
31-Jul-06 LABOR COSTS
Rid Bid Item Estimated Unit of Labor Unit Total Labor
Item No. Description Quandt Measure Price Price
Bid Item U-19 - Potable Water Main 12" DIY 216 LF
g
_ - _._.. .
train t Joint on Exi
3 ,990.00
703 Install Mechanical
ake Cest Hol s/Potholes Existing
,0'-12" Main 1110 EA $795.00 $795.00 EA $200.00 $ $200 00 r $200.00 ADDITIONA THOLES I
2d Install 12" DIP Water Main 2160 LF $ 18.50 $3,996.00
L PO REQUIRED
Bid Item U-20 - Polable Water Main 12" HDYF. (Directional 1 ,150 LF i
04c Install 12" HUPF. Horizontal Directional Drill 1 , 150.0 LF $32.00 $36,800.00 _
06 _ . ec
Install Mechanical Restrained Joint Fittings 0.65 TON $ 1 ,665.00 $ t ,082.25
7b Install Mechanical Restraint Joint on Existing 10'-12" Main 4.0 EA $500.00 $2,000.00 - .
_ ._
09 Make Connection to Existing Juniper
2.0 EA $79500 $ $460.00
10 Install 'temporary Water Main Jum er 1 EA $460.00 $460.00 i
17f Install 12" NRS Gate Valve & Box 2 EA $545.00 $1 ,090.00 _
216 Insta112" Air Release Valve with ARV Manhole & Structure 2 EA $560.00 $1 , 120.00
23 _ _ Test I loles/Potholes 10 EA $200.00 $2,000.00
256 Install Permanent Blow-off 1 EA $700.00 $700.00
28 Install Sample Point 2 EA $85.00 $ 170.00 + _ - - -
Bid Item U-21 - Fire Hydrant Assembly I EAI
ZOb Install hire Hydrant Assembly with tee and 6" Gate Valve I EA $775.00 $775.00
Y Y - y_.
Bid Item U-22 - Fire Hydrant Assembly Relocation I _ EA
20a Relocate Fire Hydrant Assembly with lee and 6" Gate Valve 4 EA $416.00 $ 1 ,064.00 -$ 7 ,664.00THIS ITEM REPLACED BY
______FOLLOWING U-22 ITEMS
U-22 Offset Fire Hydrant and Move to Back of ROW' sta.#274+00 - - -
Install 6"
051h
_ - -. Y Restrained 816"
g _ r. _ _THESE_ L CONTRACT AN IN
7c Install06 lMeclhanical Restrat Join onJExistinoint ti1G"' Main 0240 EA 25 TON $ 1$55000 $ , 10000 IN ORIGINA? ITEMSARE
NOD ARE
_- - ____ r -
09 _ Make Connection
Existing Main 1 .0 EA $795 .00 $795 .00 T
Holes/Potholes23 2 EA $200.00 $400.00 ADDITIONS TO THE ORIGINAL
_ _ _ $395 .00
17c Install 6" NRS Resilient Seated Cate Valve 1 EA $395 00 -
52 Install and compact select fill from outside sources 90.0 CY $30 00 $2,700.00 CONTRACT -
54 _ Removal and disposal of muck 90.0 CY $ 1100 $990.00
BUT SHOWN HERE AS INSTALLED
U-22 Blue Island Street Fire hydrant relocate stag 308+$p 1
56 Install G" HDPE Open Cu[ 41 .0 LF $80.00 _ r $3,280 00 AND ADDITIONS l
_ 7a Install Mechanical Restraint loin[ on Existing 6" Main 2.0 _ EA $333 .00 $666.00 I
09 Make Connection to Existing Main 2.0 FA $795 .00 $ 1 ,590.00
_ 23 Test Holes/Potholes 2 EA $200.00 T $400.00
Install Mech. Restrained Joint DIP Fittings $416.25 - - - _ - - - -
G g 0.25 To $ 1665 .00 _ �
75a Wellpoint dewatering min 3000 work area 1 I 'S $ 1 ,300.00 $ 1 ,300.00 - . . .
756 Wellpoint dewatering additional points required 52.0 LF $25 .00
54 Removal and disposal of muck 1800 CY $ 11 .00 _ _ _ $ 1 ,980 00 -
-__ P $5,400 00
52 Install and compact select GII from outside sources 180.0 CY $30.00 _
1122 Offset Fire Hydrant & Relocate to ROW sta.N265+20
Indian River County Department of Utilities
DEDUCTIONS ( ADDITIONS
COS'1' EJLIMATE and CONTRACTOR'S BID ITEM LIST Attachment
Project: CR 512 Phase III Roadway Improvements - Revised Jul 21, 3006
Description: Utilit Relocations
31-Jul-06 LABOR COSTS
Bid Bid Item _ Estimated Unit of Labor Unit Total Labor
Item No. Descri tion Quandt Measure Price 7-Price
5b Install 6" HDPE Open Cut 36.0 1 LF $80.001 1 $2,880.00
17o Install G" NRS Resilient Stated Gale Valve 1 FA $395.00 $395.00
7x Install Mechanical Restrain[ Join[ on Existing 6" Main 2.0 EA $333 .00 $666.00 i
r
23 Test Holes/Potholes 2 EA $200.00 $400.00 '
_- --
09 Make Connection to Existing Main 1 .0 EA $795.00 $795.00
6 Install Mech. Restrained Joint DIP Fittings 0.25 Tn $ 1 665 . _00 $416.25 C ( -
Bid Item U-23 - Valve Potable Water 8" Gale I EA
! _
17d R" Gate Valve Complete 1 NA $420.00 $420.00
Bid Item I1-24 - Valve Potable Water 12" Gate 3 EA
17f Install 12" NRS Gate Valve & Box 3 EA $545.00 $ 1 ,635 .00
Note^ (2) 12" gate valves were already included in U-20
Bid Item U-25 Potable Water Main Adjustment
_ Assembly 6"
C � )
I EA
tMechanicalcY F
00 $ I00.00
OG Install Restrained Joint Fittings 0.25 UN $ 1 ,665. $416.25
I
nts
EA $333.00
6,00
p7) Install Mechanical Make Connection t Restrained
nJto th on
Existing
3" 8" Main 2?0 EA $795.00 $ $660.00
23 Test Holes/Potholes 2 EA $200.001 $400.00
Btd Item U 26 Potable Water Main Adjustment Assembly 12
DIP (include (4) 45 Bend) 4 EA
OSe Install 12" HDPE by Open Gut 104.0 LF $95.00 $9,880.00
OG Install Mechanical Restrained Joint Fittings 2.60 1 O $ 1 ,665.00 $4,329.00
_ 7b Install Mechanical Restraint Joint on Existing 10'-12" Main 8.0 EA $500.00 $4,000.00 _ 1 -
09 Make Connection to Existing Main 8.0 EA $795.00 $6,360.00
Test Holes Potholes _- - -
23 8 8A $200.00 $ 1600.00
Bid Ilan U-27 Potable Water Main Adjustment Assembly 16"
_ DIP (include (4) 45 Bend) I EA
05tInstall 16" HDPE by Open Cut 26.0 LF $100.00 $2,600.00 -$2,800.00
_ 06 Install Mechanical Restrained Joint Fittings 1 .06 TON $ 1 ,065 .00 $ 1 ,704.90 -$1 ,764.90
--_ ._- .--
7c Install Mechanical Restraint Joint on Existing I6" Main 2.0 EA $550.00 $ 1 , 100.00 -$1 , 700.00
09 Make Connection to Existing Main 2.0 FA $795 .00 $ 1 ,590.00 -$1 ,590.00 (
23 Test holes/Potholes 2 EA $200.00 $400.00 -$400.00 _
Indian River County Department of Utilities I I
_
DEDUCTIONS ADDITIONS
- _ '
COST ESTIMATE and CONTRACT'OR'S BID ITEM LIST Attachment
c yya en} 1 _ - -- _-Project: CR 512 Phase III Roadway Improvements - Revised July 21, 20U6 L
U 11111 11 L 1 -
Description: Utility Relocations t i
31-Jul-06 LABOR COSTS
Bid Bid Item Estimated Unit of iLaborUnitl Total Labor
Item No. Description Quantity Measure Price Price
Bid Item U-28 Potable Water Main Adjustment Assembly 20" 2 EA
DIP (include (4) 45 Bend)
O R Install 20" IIDPE by Open Cut 60.0 1 LF $ 105.00 $6,300.00
OG Install Mechanical Restrained ]Dint Fittings 1 .60 TON $ 1 ,665.00 $2,664.00 $449.55 additional weight of fittings _
_. - -__ _
7d Install Mechanical Restraint Joint on Existing 20" Main 4.0 EA $600A0 $2,400.00 _ _ _ $1 ,300.00well point dewatering
dewatering addition
09 Make Connection to Existing Main 4.0 EA $795.00 $3 , 180.00 $2,700 00 ' install & compact. improt fill
23 Test Hales/Potholes 4 FA $200.00 $800.00 $3,960.00 , muck removal
_._
$30,000.00 20' line stop
$725.00 '. asphalt over trench
$551 00 remove dispose and replace rock base -
- . .--_ Bid Item U 29 20" x8" Wal Tap w/ Valve & Box 1 EA _ _- T
+.
12e Stainless Steel Run 16" - 24" 1 EA $900.00 $900.00 -$900.00 l 'i
13g Tap 20" Main I EA $ 1 ,200.00 $ 1 ,200.00 -$ 1 ,200.00
---
23 Test I toles/Potholes 2 EA $200.00 $400.00
45 Install Asphalt Cement Replacement over Full Trench Width 400 SY $20.00 $8,000.00 -$8,000.00
46 Remove, Dispose of and Replace Rock Base 400 SY $ 10.00 $4,000.00 -$4,000.001
47 Remove, Dispose of and replace Stab. Subgrade 400 SY $6.00 $2,400.00 $2,400.00 r
606 Sad and topsoil 710 SY $6.001 $4,260.00 $4,26_0.00
76 Record Drawings I LS $5,000.00 $5,000.00
Subtotal Subtotal Labor
$234,676.75
— _
Subtotal Subtotal labor, Mob., Demob., MOT, Materials, & Permitting $248,75736 j
Force Acent. IRCDUS Contingency Account far additional MOT Devices as I Allowance t0% $24,875.74
_ SubTolal Labor Cost $273,633.09 — -- - - ,
$38999.80 ADDITIONAL -
_ 71ONAL ITEMS ADDED 70 JOB
$ 19,418.7TOTAL CREDITS _ _ $41 R72_OS 5—SEE ATTACHED SHEET FOR DETAILS
TOTAL ADDITIONS $2U7,U3G 55 it -
NEW CONTRACT AMOUNT _ -_ - -_ _ - - - _ $438,797.59 — 166,311 10 SUBTOTAL ADDITIONS AND DELETIONS
APPROVED CONTRACT AMOLIN7 $343.871 .UG $38,065.50 $
CHANGE ORDER AMOUNT $94,926.53 $3045.2411 $14,611 47 ADDI
, TIOONAL MOBILIZATION
$380.6 $1 ,826.43 ADDITIONAL MOT
— - - T
$1 ,82643 ADDITIONAL DEMOBILIZATION
X22,461 12 ADDITIONAL CONTINGENCY MOT
$41 ,872.05 TOTAL CREDITS
$207,03655 Total; additions .
r
f
SECTION 00450
CHANGE ORDER FORM
CHANGE ORDER NO . 01
DATE : 2/26/07 CONTRACTOR : The Danella Companies
OWNER: INDIAN RIVER COUNTY AGREEMENT DATE : July 18 , 2006
PROJECT NAME : CR 512 and CR510 Utility Conflict Resolution
The following changes are hereby made :
1 ) Increase the Contract Amount to include. .
Original CONTRACT PRICE $ 343 ,871 .06
Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $ 343 , 871 .06
Net Increase (Decrease) Resulting from this CHANGE ORDER $ 94 , 926 . 53
The current CONTRACT PRICE including this CHANGE ORDER $ 438 . 797 .59
ORIGINAL CONTRACT TIME : No. Days N/A
Current CONTRACT TIME adjusted by previous CHANGE ORDER No. Days N/A
Net Increase (Decrease) Resulting from this CHANGE ORDER No. Days 0
Current CONTRACT TIME Including this CHANGE ORDER No. Days N/A
CHANGES ORDERED :
I . GENERAL
This change order is necessary to increase the cost of the project due to unexpected
pipes , pipe sizes and lack of valves
II . REQUIRED CHANGES
Increased construction line items and pipe sizes
III . JUSTIFICATION
To finish utility relocates to accomplish a timely completion of CR 512 improvements
Funds for the project have been approved by the BCC from the Public Works Department
Capital Projects Fund , 17/18/06
Attachment 2
Chanee Order Poem
no450 - . 1 .
C,Doamrms and Seningssgordons\Leal Senings,Tenprary Imeiner hl ,OLK I Echange order no. I cr512 doc
IV. WAIVER
This Change Order constitutes full and mutual accord and satisfaction for the adjustment
in contract price or time as a result of increases or decreases in costs and/or time of
performance caused directly and indirectly from the change.
This Change Order represents an equitable adjustment to the contract and
CONTRACTOR hereby waives all rights to file a claim on this Change Order after it is
properly executed .
V. APPROVAL AND CHANGE AUTHORIZATION
Acknowledgements:
The aforementioned change, and work affected thereby, is subject to all provisions of the
original contract not specifically changed by this Change Order, and ,
It is expressly understood and agreed that the approval of the Change Order shall have
no effect on the original contract other than matters expressly provided herein.
Change Order Request By: Gordon Sparks Department of Utility Services,
India River C nty, FI flda
Change (s) Ordered By: Gordon Sparks y '
Signatures& Tile 4 L G P
RECOMMENDED BY: Gordon Sparks ACCEPTED BY:
DEPARTMENT OF UTILITY SERVICES C7 ¢nif l_
Engineer: Gordon Sparks
ContractorIBM"
y.
Signature & Dat / nature & Date
Title: Environmental Engineer Title: zfe! y / ec.�` � llli4C�/Z
APPROVE1AY;
INDIAUft&6 Cb6TY. FLORIDA
Owner
Ga,r, r v eeler , Chairman
Qf�Cbunty Commissioners
* * END OF SECTION
Change Order Form
00¢50 - - 2 -