Loading...
HomeMy WebLinkAbout2007-448 SECTION 00450 CHANGE ORDER FORM CHANGE ORDER NO. 1 DATE : December 18 , 2007 CONTRACTOR : TLC Diversified of Palmetto Florida OWNER: INDIAN RIVER COUNTY AGREEMENT DATE : February20 2007 PROJECT NAME : Master In-Line Sewer Pump Station at the South R O WTP 1550 9'h St SW The following changes are hereby made: Original CONTRACT PRICE $ 1 ,504,783.00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $ N/A Net Increase ( Decrease) Resulting from this CHANGE ORDER $ 12 . 226 . 27 The current CONTRACT PRICE including this CHANGE ORDER $ 1 , 517 . 009. 27 ORIGINAL CONTRACT TIME: No. Days 210 Current CONTRACT TIME adjusted by previous CHANGE ORDER No. Days N/A Net Increase (Decrease) Resulting from this CHANGE ORDER No. Days 90 Current CONTRACT TIME Including this CHANGE ORDER No. Days 300 CHANGES ORDERED : I . GENERAL Misc. additions to contract. II . REQUIRED CHANGES III . JUSTIFICATION The change order is necessary to add a flow meter to the force main to the South WWTF, upgrade the telemetry antenna and upsize the sample line valves , as well as increase the allowable time to do the work. IV. WAIVER This Change Order constitutes full and mutual accord and satisfaction for the adjustment in contract price or time as a result of increases or decreases in costs and/or time of performance caused directly and indirectly from the change. This Change Order represents an equitable adjustment to the contract and CONTRACTOR hereby waives all rights to file a claim on this Change Order after it is properly executed. Attachment 2 Change Order Farm DD450 - I - C\Dowments and Se¢ingsglambersonVurel getfings\Temporary lntemet Files\Covmvt.OutlookVaHU12HUWAA - NASD - Change Order No 1 - GOPoon Revisaddac V. APPROVAL AND CHANGE AUTHORIZATION Acknowledgements: The aforementioned change, and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and , It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein . Change Order Request By: Gordon Sparks Environmental Engineer Department Utility Services, C Indian River County , Florida Signature Contractor: TLC Diversified of Palmetto, Florida /1 III 4 Signature and Date APPROVED BY: INDIAN RIVER COUNTY, FLORIDA By: Sandia L.: Bowdeh , ,tChairman , Board of County Conirfussioners otL)L Sighature and Date * * END OF SECTION Change Order Form 004i0 - - 2 - CDocuments and Sevings\dambersomLocal SeningstTemporary Internet HWContent.Outlook04HU 12g ,AAA - 00450 - Change Order No 1 - Gordon Revised.clot TLC Diversified, Inc. Spreadsheet Report Paye 1 Valve Swap 1013112007 9;01 AM Bid It LoeatiTakeoff ion m . Quantity Grand Total Notes 001 Bond Bond_ 1 .001s 62 . 001 Bond 1 .00 LS 62 002 General Conditions General Conditions _ 1 .00 Is 11438 002 General Conditions 1 .00 LS 1 ,438 003 20" Valve Change Over 20" Valve Change Over 1 .00 1s 1 ,083 '. 20" Pipe Support 1 .00 Is 1450 20" Megalug W/Acc Kits 316 SS 1 .00 Is 584 Labor 1 .00 Is 2153 9 5,370 003 20" Valve Change Over 1 .00 LS 370 Estimate Totals Description Amount :Totals Hours Rate Cost BasisCost per Unit Percent of Total Labor 31879 52.300 hrs 3,879. 150 /LS 56.47% Material 2,534 2,534.260 /LS 36.89% Subcontract Equipment 394 1 .290 hrs 394.340 ILS 5.74% Other 62 61 , 860 /LS 0. 90% 6,869 6,869 6,869. 000 /LS 100,00 100.00% Total 61869 6,869.000 /LS NOV 0 9 2007 UTIL 1 -1 - 1E '� We agree to do the above estimated work for the price of 6,870 dollars Signature Signature Print Name Print Name _ Date Date Attachment 1 i of 3 TLC Diversified, Inc. Spreadsheet Report Page 1 RTU Antenna Upgrade 1013012007 3 .02 PM Bid Item W Pe Location Phase Description Takeoff Quantity Grand Total Unit Grand Price Total Notes 001 Bond 1 .00 LS 23. 13 /LS 23 002 General Conditions 1 .00 LS 384. 11 ILS 384 003 _ Antenna Upgrade- 1 .00 LS 29048.97 /LS 2,049 00 We agree to do the above estimated work for the price of 21456 dollars Signature Signature Print Name Print Name Date Date Attachment 1 2of3 TLC Diversified, Inc. Spreadsheet Report Page 1 2Inch SS Valves 111612007 12:25 PM Bid Item Work Grand Grand Total Unit Location Phase Description Takeoff quantity Notes Type Total Price 001 Bond 1 .00 LS 27 27. 14 /LS 002 General Conditions 1 .00 LS 397 397.39 /LS I_ 003_ 316 S/S Ball Valves 1 .00 LS 22477 2,476.74 ILS 2.3 We agree to do the above estimated work for the price of 2,903 dollars Signature Signature Print Name Print Name Date Date Attachment 1 3 of 3