Loading...
HomeMy WebLinkAbout2006-221 INDIAN RIVER COUNTY , FLORIDA -7 CHANGE ORDER NO . 1 C�)N' 0 () � PROJECT: 4th Street Widening - US1 to Old Dixie Highway DATE ISSUED : 6 / 20 /06 CONTRACTOR: Timothy Rose Contracting , Inc. 1360 SW Old Dixie Highway, Suite 106 Vero Beach , FI . 32962 ITEM DESCRIPTION OF CHANGE QTY UNIT UNIT PRICE PRICE NO. PRICE INCREASE DECREASE 1 Clear Sod from East Pond LS 1 $1 ,450.00 $ 1 ,450.00 2 Add Sand & Regrade East Pond LS 1 $2,300.00 $2,300.00 3 Add #57 Stone East Pond LS 1 $530.00 $530.00 4 Drain, Remove Silt, Add Sand & Regrade W. Pond LS 1 $5,440.00 $5,440.00 5 Install 4" PVC Orifice In Weir LS 1 $155.00 $ 155.00 6 REMAINING BALANCE IN FORCE ACCOUNT LS -1 $5,996.42 -$5,996.42 102-99 VARIABLE MESSAGE BOARD ED -60 $65.00 -$3,900.00 104-10 BALED HAY EA -60 $15.00 -$900.00 110-7-1 MAILBOX (RELOCATE) EA -4 $100.00 7 400.00 120-4 Excavation (sub-soil) CY -95 $7.00 -$665.00 286-1 -1 TURNOUT CONSTRUCTION (ASPHALT) SY 62 $127.00 $7,823.20 286-1 -2 TURNOUT CONSTRUCTION (6" conc.) SY 371 $24.50 $9,089.50 334-2 TYPE SP-12.5 ASPHALT OVERBUILD TN -51 $82.00 -$4, 182.00 425-10 YARD DRAIN EA 1 $400.00 $400.00 430-11 -423 15" RCP LF -1 $27.00 -$27.00 430-11 -425 18" RCP LF -1 $32.00 -$32.00 430-11 -429 24" RCP LF -2 $53.00 -$106.00 430-11 -433 30" RCP LF -2 $69.00 -$138.00 430-11 -438 36" RCP LF -6 $98.00 -$588.00 430-171 -23 HDPE PIPE CULVERT (15") LF -2 $19.00 -$38.00 515-1 -2 HAND RAIL (ALUMINUM) LF -115 $50.00 -$5,750.00 520-1 -10 CONCRETE CURB & GUTTER (TYPE F ) LF -180 $9.35 -$1 ,683.00 521 -72-4 CONCRETE GRAVITY WALL, CLASS I CONC. CY -15 $450.00 -$6,750.00 522-1 CONCRETE SIDEWALK (4" THICKNESS) SY -60 $21 .90 -$1 ,314.00 550-74-2/4 RELOCATE EXISTING 4' CHAINLINK FENCE LF -20 $5.50 -$110.00 ff 575-1 /B SOD (BAHIA) SY 5,926V$160.00 $10,370.50 575-1 /F SOD (FLORATAM) SY -1 ,889 -$5, 100.30 715-2-115 CONDUIT (2" SCHEDULE 40 PVC) LF -100 -$400.00 1643-700 VALVE BOX ADJUST / MODIFY) EA -2 -$200.00 1693-800 WATER SERVICE (RELOCATE) EA -2 -$1 , 100.00 711 -3 PAVEMENT MESSAGES (THERMO) EA i $160.00 SUBTOTAL $37,718.20 (539,379.72) NET CHANGE -$1 ,661 .52 ORIGINAL CONTRACT PRICE $1 , 120,673 .00 CURRENT CONTRACT PRICE $ 1 , 120,673.00 AS ADJUSTED BY PREVIOUS CHANGE ORDERS NET CHANGE IN CONTRACT PRICE {$ 1 ; 661 . 52 ) DUE TO THIS CHANGE ORDER NEW CONTRACT PRICE INCLUDING THIS CHANGE ORDER $ 1 , 119,011 .48 Change OrderNolAs 6/8/2006 ENGINEER'S RECOMMENDATION : I have examined the above changes. They are necessary to satisfactorily complete the contract. The price changes are reasonable and I recommend that the changes be made. Cjf 7p Terry . Raut P. E. , Project Manager ate OSLO & 43rd AVENUE CHANGE ORDER NO. 1 PAGE 3 OF 3 CONTRACTOR'S APPROVAL: I agree that the above changes in said Contract, in accordance with Specifications for the price changes shown, are satisfa (y 4 o (.P im Rose, President, Timothy Rose Contracting , Inc. D to ACCEPTED BY: Approved as to form legal s fficiency: ,t Dates L oseph A. al to ounty Administrator Board of County Commissioners Indian River County Indian River Count' Approv Date 6 /20 /06 Admin. 6l5 0 Arthur R. Neuberg " , ; Date Budget 2 Chairman Board of MQo ty Commissio rs Legal �k� Gzk Risk M t Public Works YCap. Proj. a DNti Date Change OrderNoi .xls 6/8/2006