Loading...
HomeMy WebLinkAbout2006-15400% Change Order Document G701TM - 2001 PROJECT (Name anti address): 43rd Avenue Sub -Complex 43rd Avenue Vero Beach, Florida TO CONTRACTOR (Name and address): Chilber Construction Co., Inc 905 16" Place Vero Beach, Florida 32970 CHANGE ORDER NUMBER: 002 DATE: May 2, 2006 ARCHITECT'S PROJECT NUMBER: 2102 CONTRACT DATE: August 02, 2005 CONTRACT FOR: New Construction s -oto -ol o7 L: 711 AL A0 o to - /,5 v OWNER: ARCHITECT: CONTRACTOR: FIELD: ❑ OTHER: ❑ THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) Description Amount Add laundry sink in HVAC area and add ice machine hookup with floor drain in covered stagea area A. I - 17W Musics wall hung laundry sink I - #49-241 Gerber laundry facet I - Trap and supply B. 1 - #ZN-415 Zurn 3" floor drain I - Ice machine supply The original (Contract Sum) was The net change by previously authorized Change Orders The (Contract Sum) prior to this Change Order was The (Contract Sum) will be increased by this Change Order in the amount of The new Guaranteed Maximum Price including this Change Order will be $793.51 Subtotal: $793.51 Contractor's Fee: $158.70 CHANGE ORDER TOTAL: $952.21 $ 3,1 t6,305.00 have been authorized $ 66,981.38 been agreed upon by both the Owner and $ 3,183,286.38 supersede the Construction $ 952.21 $ 3,184,238.59 The Contract Time will be changed by zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is June 23, 2006 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Donadio & Associates, Architects, P.A. ARCHITECT (First name) 609 17th Street, Vero Beach, FI 32960 ADDRESS ` BY (Signature) \J Anthony Donadio (Typed name) Chilberg Construction Co., Inc. (T)ped name) y DATE Indian River County Board of County Commissioners OWNER (Firm name) 1840 25th Street. Vero Beach -Fl 32960 DATE A. Baird, County Administrator Wane) AIA Document G70lyd - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA* Document, or any portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 12:09:52 on 05/03/2006 under Order No.1000192296_1 which expires on 8/8/2006, and is not for resale. User Notes: (3467484405) Reviewed and Recommended for App oval: .x,0 b,,), s%lo� �1., _5�F3 W. FraFhe, General Servlces Director Jason Brown, Budget Director Indian River County Buildings and Grounds Division Memorandum Telephone: 772-567-8000 ext. 1419 Fax: 772-770-5095 Date: May 2, 2006 TO: Tom Frame Director of General Services From: Lynn Williams Superintendent of Buildings a Subject: Change Order #2 - 43rd Ave. Attached is a change order request from ' erg Construction for the addition of a laundry sink and an ice machine connection in the shop of area of building 2. These items are owner requested changes to the contract. I believe Change order #1 was prepared by your office. Please let me know if you have any questions. CHILBERG CONSTRUCTION COMPANY, INC. CHANGE ORDER WORKSHEET tvl ' r DATE: s PROJECT: `� r DESCRIPTION: Furnish and insta CODE TASK VENDOR AMOUNT OEML CONDITION A 01025General Liability Insurance C.C.C./Zurlch Insurance Services B 01030 Builders Risk Insurance C.C.C.Ourich Insurance Services C 01035 Worker's Compensation C.C.C./FOCI D 01620 Auto Expense Chilberg Construction Company E F Total General Conditions _ LABOR A 01041 JProject Management Chilberg Construction Company B 01043 Protect Supervision Chilberg Construction Company C 61300 Submittals Chilberg Construction Company Total La9gr BUBOONTRAOTO 1&450 ®Ink, laemaker hook up Snyder Plumbing 793.51 Total Subcontractor 793.51 MATERIALS A B C D Total Materials _ EQUIPMENT A B Total Equipment PREPARED BY: SUBTOTAL 793.51 NOTE General Uablllly Insurance .0046 on Subs ane .0497 on Labor Bulxlers Risk Insurance .30 per S 100.00 Workers Corp .0476 Supery/.2880 Carpd.0QS9 Mgt. Auto Expense Is $ 3.73 per hour Overhead % Profit/BUIlde FeFee % 158.70 Bond Expense % TOTAL 952.21 See arleche. Snyder Plumbing of the Treasure Coast, Inc. 1525 Old Dixie Highway Vero Beach, Florida 32960 STATE OF FLORIDA LICENSE NUMBER COC1425952 Name / Addres$ Chilberg Construction Company, Inc. 905 16th PI Vero Beach, FL 32960 Descrlptlon ADD LAUNDRY SINK IN HVAC AREA 1-17W Mustee wall hung laundry tub 1-#49-241 Gerber laundry faucet 1 -Trap and Supply ADD ICE MACHINE HOOK UP WITH FLOOR DRAIN IN COVERED STORAGE AREA 1-#ZN-415 Zum 3" floor drain 1 -ice machine supply Phone # Fax # 772-569-3373 772-569-3055 ZOO/Zoom 9N391I1­19 « Date Change Ord.., 1/9/2006 1659 PrO�QGt IR ADMIN COMPLEX Total Signature m a w 4 $793.51 9NI8Wn1d*N30ANS 990E995ZLLl XV3 L9 6L 9003/OZ/E0