CHANGE ORDER
DATE : June 22 , 2005 CONTRACT/PURCHASE ORDER NUMBER: N/A
Work Order No. N/A Change Order No. 2
CONTRACT NAME : Stormwater Management Cost - Sharing Program
TO : Keith McCully
Indian River County
184025 1h Street
Vero Beach , FL 32960-3365
FROM : Troy Rice, Project Manager
PROJECT NAME : Stormwater Management Cost- Sharing Program
ACCOUNT NUMBER : 76 -42 - 52 -6390- 8301 -04003
CHANGE ORDER IMPACTS : This no-cost time extension will not have any effect on other projects, and the
statement of work remains the same . In April 1999 , the District entened into a cost share agreement with Indian
River County obligating funds from Water Management Lands Trust Fund and Indian River Lagoon (IRL)
license tag sales for stormwater improvement projects in the East Roseland and Gifford areas . These projects
involve the construction of treatment train methodologies designed to reduce pollutant loadings to the St.
Sebastian River and Indian River Lagoon . The projects will also provide additional water storage capacit�to
relieve localized flooding within the East Roseland and Gifford comrrtunities . The Gifford component has been
completed . The project statement of work and contract for East Roseland has been modified three times with
associated budgetary changes due to the volatility of land acquisition negotiations with the owner of one of the
sites of the two planned wet detention ponds . The property owner initially agreed to sell the property to the
County but later required changes to the design as a sale condition . The owner subsequently declined to sell his
property necessitating another design change . The final design calls for the excavation of a 1 . 5
acre wet
detention pond with littoral shelves and vegetated strips, installation of enlarged culverts and stormwater
conveyance swales .
JUSTIFICATION FOR EXTENSION : Construction of the East Roseland wet detention pond, conveyance
swales and culverts is complete . The County is preparing a work order for the littoral shelf planting, and this
task will be finished prior to July 30 , 2005 . The County is requesting this final no-cost time extension to comply
with the contractually required water quality monitoring element of the project . The IRL program office
recommends this 62 day no-cost time extension with revisions to Suction IV Task Identification , Timeframes
and Deliverables of the original contract . Refer to attachment .
GOVERNING BOARD
Ometrias D. Long, CHAIRMAN David G . Graham, VICE CHAIRMAN R . Clay Albright, SECRETARY Duane Ottenstroer, TREASURER
APOPKA JACKSONVILLE OCALA JACKSONVILLE
W. Leonard Wood John G . Sowinski William Kerr Ann T. Moore Susan N . Hughes
FERNANDINA BEACH ORLANDO MELBOURNE BEACH BUNNELL PONTE VEDRA
S � • tJ 11SRiver
Water Management District
Kirby B. Green III , Executive Director • David W. Fisk, Assistant Executive Director
4049 Reid Street • P. O. Box 1429 • Palatka , FL 32178- 1429 • (386) 329-4500
On the Internet at www. sjrwmd. com.
SCHEDULE/WORK ORDER AMOUNT IMPACTS .
® Extend the completion date from July 30 2005 to September 30 2005 ( impact on schedule : 62 days)
❑ The completion date of will not be affected by this change order.
The amount will not be affected by this change order .
Approved : Original Amount . . . . . . . . . . . . . . . . . . . . . . $ 2609000.00
Kirby B . Green III , Executive Director Total Additions / Deductions . . . . . . . . . . . . . . . $ 0.00
Revised Amount . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2609000.00
Date :
Acknowled .' . s � Date : 07 - 19 - 2005
A ' lhdiarh4kf�gr 'County
ThOas •1. • S� . Lowther , Chairman
cc ` Qoottaa4/Purchasing Fife :.
,irSacial. Menagemegt
. F
APPR \�2�
V -P
7 .
County Admini ator So
APE ELS AS TO FORM
EG
AS ANT C Y ATT y
GOVERNING BOARD
Ometrias D. Long, CHAIRMAN David G . Graham, VICE CHAIRMAN R. Clay Albright, SECRETARY Duane Ottenstroer, TREASURER
APOPKA JACKSONVILLE OCALA JACKSONVILLE
W. Michael Branch John G . Sowinski William Kerr Ann T Moore Susan N . Hughes
FERNANDINA BEACH ORLANDO MELBOURNE BEACH BUNNELL JACKSONVILLE
s
IV. Task Identification , Timeframes and Deliverables
Task 1 - Conceptual Design
Milestone : Completion of conceptual design.
Deliverable : Conceptual design plans
Status : Complete
Taskl A —Wetlands Mapping
Milestone : Completion of wetland boundary surveys .
Deliverable : Aerial map with jurisdictional wetland boundaries .
Status : Complete
Task 1 B - Final Design
Milestone : Completion of 100% project design.
Deliverable : Final Construction project design plans .
Status : Complete
Task 2 - Land Acquisition
Milestone : Purchase of project detention area.
Deliverable : Deed of the property to the County .
Status : Complete .
Task 3 -Construction
Milestone : Completion of project and final acceptance by County .
Deliverable : Completed and operational stormwater detention and treatment
system .
Status : To be completed by July 30 , 2005 .
Task 4-Monitoring
Milestone : Monitoring of influent stormwater and effluent exiting the detention
pond .
Deliverable : Water quality for a minimum of three (3 ) measurable rainfall events .
Status : To be completed by September 30 , 2005 .