Loading...
HomeMy WebLinkAbout2005-252 i1 J . I SECTION 00450 CHANGE ORDER FORM CHANGE ORDER NO . 2 DATE : July 19 , 2005 CONTRACTOR : Underground Utilities , Inc . OWNER : INDIAN RIVER COUNTY AGREEMENT DATE : January 4 2005 PROJECT NAME : Orange Heights Water Main Extension The following changes are hereby made : 1 ) Increase the Contract Amount and Time to include Water Service Installations for all customers in the Orange Heights and Gallentine Subdivisions Original CONTRACT PRICE $ 6497 . 00 Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $ 117 21 . 73 Net Increase ( Decrease) Resulting from this CHANGE ORDER $ 8391 . 00 The current CONTRACT PRICE including this CHANGE ORDER $ 200 , 3 14 . 73 ORIGINAL CONTRACT TIME : 30 days No . Day 30 Current CONTRACT TIME adjusted by previous CHANGE ORDER No . Day 60 Net Increase ( Decrease) Resulting from this CHANGE ORDER No . Day 30 Current CONTRACT TIME Including this CHANGE ORDER No . Days 90 CHANGES ORDERED : I . GENERAL This change order is necessary to increase the actual work and resultina costs and time performed under this Contract to construct water services for the project II . REQUIRED CHANGES Increase construction items and time III . JUSTIFICATION To a able 'toprovide water services for the entire subdivision in a timely manner Funds for tho project have been approved by the BCC from the Utilities Department ` ,Capital Proiects Fund , Account No . 471 - 169000- 05507 on 01 /04/05 Attach lent 2 hange Order Form 00450 - - 1 - FAUtilities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - Orange Heights (Park) Water Main Extension in Sebastian\C - 00450 - Change CrderNo. 2 Attachment 2.doc A IV . WAIVER This Change Order constitutes full and mutual accord and satisfaction fol: the adjustment in contract price or time as a result of increases or decreases in costsl and/or time of performance caused directly and indirectly from the change . This Change Order represents an equitable adjustment to the : contract and CONTRACTOR hereby waives all rights to file a claim on this Change Order after it is properly executed . V. APPROVAL AND CHANGE AUTHORIZATION Acknowledgements : The aforementioned change , and work affected thereby, is subject to all provisions of the original contract not specifically changed by this Change Order; and , It is expressly understood and agreed that the approval of the Change Order shall have no effect on the original contract other than matters expressly provided herein . Change Order Request By : Gordon Sparks Department of Utility Services , Indian River County, Flori a Change (s ) Ordered By: Gordon Sparks / f Signature & Title ENVIRONMENTAL ENGINEER RECOMMENDED BY: Gordon Sparks ACCEPTED BY: DEPARTMENT OF UTILITY SERVICES George E . French , President, Underground Engineer: Gordon Sparks Utilities , Inc. Contractor r 6 Lz lit OF By : Signature & DatV Sig atur Date Title : Environmental Engineer Title : Owner 4 APPROVED BY : , INDIAN RIVER COUNTY FLORIDA Owher e , f e By. b ] , I'Th6ma8CS✓Lowther, Chairman Board of County Commissioners BCC Approved : July 19 , 2005 APPROVED : * * prane' 0 FOR SUFF ^ Change Order ForthCounty Administrator F:\Utilities\UTILITY ENGINEERING\Projects - Utility Construction Pertnits\IMa' E to Se tian\C - 00450 - Change Order No. 2 Attachment 2.doc N E . F _ l.NT COUNTY ATTORNEY Indian River County Department of Utilities COST ESTIMATE UNDERGROUND UTILITIES INC. Project: ORANGE HEIGHTS WATER SERVICE INSTALLATION PROJECT 'cripdon: UCP s , WIT 0472 Date: June 169 2005 xroars MATex costa aM 91e new eetl0ld UWN er Leber Uaa T" Labmoomol UW Te 6tsenul Ile Nanmmdeft Meuve Phe Pnee 63 Mobilintion 1 5% $41 .05 64 Demobilintion 1 3% $24.63 65 Maintenance ofTntlic 1 5% $41.05 04a Install 2" Sleeve Under Pemern 26 LF $10.00 $260.00av 159 Water Service Line-l" Sin cLong 40 LF $1000 $400.00 24 Install Meter Box & Tic Into Meter 1 FA. $ 125.00 $125.00 39 ROW din 4 SY $3.00 $12.00 60b Sad and topsoil 4 SY $6.00 $24.00 gTOWaterials $208.71 Subtotal Labor $821 .00 Rounded = 200.00 Total Labiirl $927.73 Total Cwt 1 136.44 Rounded - $950.00 ? 63 Mobilintion 1 5% $44.00 64I)emobilintion 1 3% $26.40 65 Maintenance oCTnl6c 1 5% $44.00 04a Install 2" Sleety UrMer Pavement 26 IF $10.00 S260.00 15k WSW Service Line-1-1/2" DoobkLong 45 LF $ 10.00 $450.00 24 Install Meier Box & Tie into Meter 1 EA. $125.00 $ 125.00 39 ROW Wading5 SY $3.00 $1500 bOb Sod and topsoil 5 SY $6.00 $30.00 Total Materials $371 .39 Subtotal Labor $880.00 Rounded = $400.00 Total labor $994.40 Total Coat $1,365.79 Rounded - $1000.00 's ' 63 Mobilization 1 5% $ 18.50 64 Demobilinlian 1 3% $11 . 10 65 MaintenanmofTafLc I 5% $ 18.50 15k Water Service Line-1" Sin le Short 20 IF $10.00 $$ 18.00 24 Otstail Meter Box & Tie Into Meter I FA $125.W $125.00 39 ROW din 5 SY $3001 $ 15.00 60b Sod and t oil 5 SY $600 $30.00 Total Materials $ 189. 11 Subtotal labor $370.00 Rounded = 1200.00 Total Cabot $418. 10 Total Cost $607.21 Rounded = $400.00 :;,,HOWMICXjfa... X110 63 Mobilization 1 5% $23.50 3 P/e _ $ 14. 10 --.-- 65 Maintenance of Traffic 1 5% $23.50 Ilk Water Servitt Linel-1/2" Double Short 30 IF $1000 $300.00 24 Install Meter Box & Tie Into Meter i EA. $ 125.00 $125.00 39 ROW din 5 SY $3.00 $ 15.00 60b Sod and tcqwil 5SY $6.00 $30.00 Total Materials $345. 19 Subtotal Labor $470.00 Rounded $350.00 Total Labor $531 . 101 Total Cost 5876.29 Rounded - 550.001 gain r Material Cos Labor Cost Total Cost Double Long J5 Services $5000.00 1 $2 000.00 i, $7 000.00 -' Double Short 9 Services S4,950.00 $3 150.00 $8 100.00 Single Long 43 Services $40850.00 $8 600.00 ' $49450.00 Single Short J31 Services $ 12,400.00 1" $67200.00 $ 18,600.00 Total Costs $639200.00 b' $199950.00 '- $837150.00 Attachment 1