HomeMy WebLinkAbout2005-252 i1 J . I
SECTION 00450
CHANGE ORDER FORM
CHANGE ORDER NO . 2
DATE : July 19 , 2005 CONTRACTOR : Underground Utilities , Inc .
OWNER : INDIAN RIVER COUNTY AGREEMENT DATE : January 4 2005
PROJECT NAME : Orange Heights Water Main Extension
The following changes are hereby made :
1 ) Increase the Contract Amount and Time to include Water Service Installations for all customers in the
Orange Heights and Gallentine Subdivisions
Original CONTRACT PRICE $ 6497 . 00
Current CONTRACT PRICE ADJUSTED by previous CHANGE ORDER $ 117 21 . 73
Net Increase ( Decrease) Resulting from this CHANGE ORDER $ 8391 . 00
The current CONTRACT PRICE including this CHANGE ORDER $ 200 , 3 14 . 73
ORIGINAL CONTRACT TIME : 30 days No . Day 30
Current CONTRACT TIME adjusted by previous CHANGE ORDER No . Day 60
Net Increase ( Decrease) Resulting from this CHANGE ORDER No . Day 30
Current CONTRACT TIME Including this CHANGE ORDER No . Days 90
CHANGES ORDERED :
I . GENERAL
This change order is necessary to increase the actual work and resultina costs and time
performed under this Contract to construct water services for the project
II . REQUIRED CHANGES
Increase construction items and time
III . JUSTIFICATION
To a able 'toprovide water services for the entire subdivision in a timely manner
Funds for tho project have been approved by the BCC from the Utilities Department
` ,Capital Proiects Fund , Account No . 471 - 169000- 05507 on 01 /04/05
Attach lent 2
hange Order Form
00450 - - 1 -
FAUtilities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - Orange Heights (Park) Water Main Extension in Sebastian\C - 00450 - Change
CrderNo. 2 Attachment
2.doc
A
IV . WAIVER
This Change Order constitutes full and mutual accord and satisfaction fol: the adjustment
in contract price or time as a result of increases or decreases in costsl and/or time of
performance caused directly and indirectly from the change .
This Change Order represents an equitable adjustment to the : contract and
CONTRACTOR hereby waives all rights to file a claim on this Change Order after it is
properly executed .
V. APPROVAL AND CHANGE AUTHORIZATION
Acknowledgements :
The aforementioned change , and work affected thereby, is subject to all provisions of the
original contract not specifically changed by this Change Order; and ,
It is expressly understood and agreed that the approval of the Change Order shall have
no effect on the original contract other than matters expressly provided herein .
Change Order Request By : Gordon Sparks Department of Utility Services ,
Indian River County, Flori a
Change (s ) Ordered By: Gordon Sparks / f
Signature & Title
ENVIRONMENTAL ENGINEER
RECOMMENDED BY: Gordon Sparks ACCEPTED BY:
DEPARTMENT OF UTILITY SERVICES George E . French , President, Underground
Engineer: Gordon Sparks Utilities , Inc.
Contractor
r
6 Lz lit OF By :
Signature & DatV Sig atur Date
Title : Environmental Engineer Title : Owner
4
APPROVED BY : ,
INDIAN RIVER COUNTY FLORIDA
Owher e ,
f
e
By. b ]
, I'Th6ma8CS✓Lowther, Chairman
Board of County Commissioners
BCC Approved : July 19 , 2005
APPROVED : * * prane'
0 FOR
SUFF ^ Change Order ForthCounty Administrator F:\Utilities\UTILITY ENGINEERING\Projects - Utility Construction
Pertnits\IMa' E to Se tian\C - 00450 - Change Order No. 2 Attachment
2.doc N E . F _ l.NT COUNTY ATTORNEY
Indian River County Department of Utilities
COST ESTIMATE UNDERGROUND UTILITIES INC.
Project: ORANGE HEIGHTS WATER SERVICE INSTALLATION PROJECT
'cripdon: UCP s , WIT 0472
Date: June 169 2005
xroars MATex costa
aM 91e new eetl0ld UWN er Leber Uaa T" Labmoomol UW Te 6tsenul
Ile Nanmmdeft Meuve Phe Pnee
63 Mobilintion 1 5% $41 .05
64 Demobilintion 1 3% $24.63
65 Maintenance ofTntlic 1 5% $41.05
04a Install 2" Sleeve Under Pemern 26 LF $10.00 $260.00av
159 Water Service Line-l" Sin cLong 40 LF $1000 $400.00
24 Install Meter Box & Tic Into Meter 1 FA. $ 125.00 $125.00
39 ROW din 4 SY $3.00 $12.00
60b Sad and topsoil 4 SY $6.00 $24.00
gTOWaterials $208.71
Subtotal Labor $821 .00 Rounded = 200.00
Total Labiirl $927.73 Total Cwt 1 136.44
Rounded - $950.00 ?
63 Mobilintion 1 5% $44.00
64I)emobilintion 1 3% $26.40
65 Maintenance oCTnl6c 1 5% $44.00
04a Install 2" Sleety UrMer Pavement 26 IF $10.00 S260.00
15k WSW Service Line-1-1/2" DoobkLong 45 LF $ 10.00 $450.00
24 Install Meier Box & Tie into Meter 1 EA. $125.00 $ 125.00
39 ROW Wading5 SY $3.00 $1500
bOb Sod and topsoil 5 SY $6.00 $30.00
Total Materials $371 .39
Subtotal Labor $880.00 Rounded = $400.00
Total labor $994.40 Total Coat $1,365.79
Rounded - $1000.00 's '
63 Mobilization 1 5% $ 18.50
64 Demobilinlian 1 3% $11 . 10
65 MaintenanmofTafLc I 5% $ 18.50
15k Water Service Line-1" Sin le Short 20 IF $10.00 $$ 18.00
24 Otstail Meter Box & Tie Into Meter I FA $125.W $125.00
39 ROW din 5 SY $3001 $ 15.00
60b Sod and t oil 5 SY $600 $30.00
Total Materials $ 189. 11
Subtotal labor $370.00 Rounded = 1200.00
Total Cabot $418. 10 Total Cost $607.21
Rounded = $400.00 :;,,HOWMICXjfa... X110
63 Mobilization 1 5% $23.50
3 P/e _ $ 14. 10 --.--
65 Maintenance of Traffic 1 5% $23.50
Ilk Water Servitt Linel-1/2" Double Short 30 IF $1000 $300.00
24 Install Meter Box & Tie Into Meter i EA. $ 125.00 $125.00
39 ROW din 5 SY $3.00 $ 15.00
60b Sod and tcqwil 5SY $6.00 $30.00
Total Materials $345. 19
Subtotal Labor $470.00 Rounded $350.00
Total Labor $531 . 101 Total Cost 5876.29
Rounded - 550.001 gain r
Material Cos Labor Cost Total Cost
Double Long J5 Services $5000.00 1 $2 000.00 i, $7 000.00 -'
Double Short 9 Services S4,950.00 $3 150.00 $8 100.00
Single Long 43 Services $40850.00 $8 600.00 ' $49450.00
Single Short J31 Services $ 12,400.00 1" $67200.00 $ 18,600.00
Total Costs $639200.00 b' $199950.00 '- $837150.00
Attachment 1