HomeMy WebLinkAbout2006-126 41-16 0C INDIAN RIVER COUNTY , FLORIDA 7/ CHANGE ORDER NO. 3 02UC) 6 , IJU PROJECT NO: 9705B PROJECT: Oslo Road/Lateral "J " Canal CONTRACTOR : Lucas Marine Construction , Inc. Bridge Replacement 3130 SE Slater Street ORIGINAL NTP: 25-Jan-06 Stuart, FL 34997 DATE ISSUED: 3-Apr-06 ITEM DESCRIPTION OF CHANGE QTY UNIT UNIT PRICE PRICE PRICE NO. INCREASE DECREASE 1 Labor, materials, equipment for 20" WM line st 1 LS $18,265.00 $ 18,265.00 $0.00 SUBTOTAL $18,265.00 $0.00 NET CHANGE $18,265.00 ORIGINAL CONTRACT PRICEITIME $2, 188,848.87 ORIGINAL SUBSTANTIAL COMPLETION DATE (Bridge Culvert) 25-May-06 120 Calendar Days ORIGINAL SUBSTANTIAL COMPLETION DATE 24-Jul-06 180 Calendar Days ORIGINAL FINAL COMPLETION 23-Aug-06 210 Calendar Days CHANGE ORDER NO. 1 $36, 905.00 CHANGE ORDER NO. 2 $17, 157.50 CURRENT CONTRACT PRICE/TIME $2,242,911 .37 CURRENT SUBSTANTIAL COMPLETION DATE (Bridge Culvert) 8-Jun-06 14 Calendar Days CURRENT SUBSTANTIAL COMPLETION DATE 24-Jul-06 0 Calendar Days CURRENT FINAL COMPLETION 23-Aug-06 0 Calendar Days NEW CONTRACT PRICE/TIME INCLUDING $2,261 , 176.37 SUBSTANTIAL COMPLETION DATE (Bridge-Culvert) AFTER THIS CHANGE OF 8-Jun-06 0 Calendar Days ORIGINAL SUBSTANTIAL COMPLETION DATE AFTER THIS CHANGE ORDER 24-Jul-06 0 Calendar Days FINAL COMPLETION AFTER THIS CHANGE ORDER 23-Aug-06 0 Calendar Days ENGINEER'S RECOMMENDATION: I have examined the above changes. They are necessary to satisfactorily complete the contract. The price changes are reasonable and I recommend that the changes be made. O (ra Janet B. Dunlap, P. ., P%eht EngineerDate CONTRACTOR 'S APPROVAi� I agree that the above c e n tract, c ordance with Specifications for th� pne changes shown, are satisfactory. `B�%&idea,tGl90E - - r�iE�,ugq Dat Lucas Marine Construction, Inc. 41f! 0P54--e4%/ter ACCEPTED BY: A r v r to fo and,legal sufficiency- 44, ot�e J eph A. B rd Date unty Administrator Indian River p ved Date Board of County Commissioners count Indian .River Count Admin. 04 - 18 - 2006 Budget ` K' ArthurR: N0uberger0l 0 Date Legal _ 14407 `•. Chair `a ;Board of,CoungCommissioner Risk Mgt. Public Works Date Cap. Pro'. lNt4R; ., eppt�i� Glerk "�'Jjbti �:t� K BARTON utilities I wo CLERK C1t2CllIT COU 3ZN + F.Tublic Works\Capital ProjectI\ lRcad La erasU Lucas Marine\Change Orders and Work Change Directives\Work Change 2_13CCMerro doe 4/4/2006 WORK CHANGE DIRECTIVE Oslo Road/ Lateral "J " Canal Bridge Replacement DIRECTIVE NO . 3 CONTRACTOR : Lucas Marine Construction , Inc . Attn : Wade E Diekman 3130 SE Slater Street StuartFlorida 34997 DATE OF ISSUANCE : Description of Change : Line stop for 20" WM . Price Increase : $ 18 , 265 . 00 Purpose of Work Change Directive : To install a line stop to tie in the 8" WM to the 20" WM that has been unable to be shut down . Attachments : None . If OWNER or CONTRACTOR believes that the above change has affected the Contract Price or Time, any Claim for a Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents . Method of determining change in Method of determining change in Contract Prices: Contract Times IR Unit Prices [] Contractor's Records 0 Lump Sum f3 Engineers Records 0 Other: 0 Other:_ Estimated increase/decrease in Contract Price: Estimated increase (decrease) in Contract Times: $ 185265 . 00 0 Calendar Days ISSUED: ACKNOW EDGE . / By: By: OWNER/ENGINEER ( ut CONTRACTOR (Authorized Signature) Date: Date: 7 Distribution of Copies : Terry Rauth , P . E . , IRC Capital Projects Manager Erik Olson , P . E . , IRC Utilities Director Mike Hotchkiss , P . E . , IRC Utilities Capital Projects Manager Joe Loudermilk, IRC Utility Inspector Brian Good , P . E . , Kimley- Horn and Associates , Inc. David K. Lucas , President, Lucas Marine Construction , Inc. Chip Boyette , IRC Project Specialist Rick Mathis , IRC Senior Engineering Inspector Office File F:\Public Works\Capital Projects\Oslo Road Lateral J\Lucas Marine\Change Orders and Work Change Directives\Work Change 3.doc L M C LUCAS MARINE CONSTRUCTION , LLC March 14, 2006 ED L9 CIE EE APR 0 3 2006 Indian River County Board of County Commissioners 1 � 1a4o2s� St. L. CAP I,4L 1WR ® JPr TS Vero Beach, FL 32960-3365 Attn: Janet B . Dunlap, P.E. RE : Oslo Road/Lateral "J" Canal Bridge Replacement Line Stop to Tie in 8" Line t-tD c?�ik y.1 K Ladies and Gentlemen: As requested, we are submitting the following for your consideration. As Indian River County Utilities has been unable to shut down the 20" watermain, we will provide all labor, materials and equipment necessary to install a line stop in order to tie in the 8" line. The total lump sum cost to complete this work is $ 18,265.00. If you have any questions or require additional information, please do not hesitate to contact us. Sincerely Wade Diekman Vice-President 3130 SE Slater St. 9 Stuart , FL 34997 • (772) 286-5094 • Fax (772) 286- 1139