HomeMy WebLinkAbout2006-126 41-16 0C
INDIAN RIVER COUNTY , FLORIDA 7/
CHANGE ORDER NO. 3 02UC) 6 , IJU
PROJECT NO: 9705B PROJECT: Oslo Road/Lateral "J " Canal
CONTRACTOR : Lucas Marine Construction , Inc. Bridge Replacement
3130 SE Slater Street ORIGINAL NTP: 25-Jan-06
Stuart, FL 34997 DATE ISSUED: 3-Apr-06
ITEM DESCRIPTION OF CHANGE QTY UNIT UNIT PRICE PRICE PRICE
NO. INCREASE DECREASE
1 Labor, materials, equipment for 20" WM line st 1 LS $18,265.00 $ 18,265.00 $0.00
SUBTOTAL $18,265.00 $0.00
NET CHANGE $18,265.00
ORIGINAL CONTRACT PRICEITIME $2, 188,848.87
ORIGINAL SUBSTANTIAL COMPLETION DATE (Bridge Culvert) 25-May-06 120 Calendar Days
ORIGINAL SUBSTANTIAL COMPLETION DATE 24-Jul-06 180 Calendar Days
ORIGINAL FINAL COMPLETION 23-Aug-06 210 Calendar Days
CHANGE ORDER NO. 1 $36, 905.00
CHANGE ORDER NO. 2 $17, 157.50
CURRENT CONTRACT PRICE/TIME $2,242,911 .37
CURRENT SUBSTANTIAL COMPLETION DATE (Bridge Culvert) 8-Jun-06 14 Calendar Days
CURRENT SUBSTANTIAL COMPLETION DATE 24-Jul-06 0 Calendar Days
CURRENT FINAL COMPLETION 23-Aug-06 0 Calendar Days
NEW CONTRACT PRICE/TIME INCLUDING $2,261 , 176.37
SUBSTANTIAL COMPLETION DATE (Bridge-Culvert) AFTER THIS CHANGE OF 8-Jun-06 0 Calendar Days
ORIGINAL SUBSTANTIAL COMPLETION DATE AFTER THIS CHANGE ORDER 24-Jul-06 0 Calendar Days
FINAL COMPLETION AFTER THIS CHANGE ORDER 23-Aug-06 0 Calendar Days
ENGINEER'S RECOMMENDATION:
I have examined the above changes. They are necessary to satisfactorily complete the contract. The price changes are reasonable and I
recommend that the changes be made.
O (ra
Janet B. Dunlap, P. ., P%eht EngineerDate
CONTRACTOR 'S APPROVAi�
I agree that the above c e n tract, c ordance with Specifications for th� pne changes shown, are satisfactory.
`B�%&idea,tGl90E - - r�iE�,ugq Dat
Lucas Marine Construction, Inc. 41f! 0P54--e4%/ter
ACCEPTED BY:
A r v r to fo and,legal sufficiency-
44,
ot�e
J eph A. B rd Date
unty Administrator
Indian River p ved Date
Board of County Commissioners count
Indian .River Count Admin.
04 - 18 - 2006 Budget ` K'
ArthurR: N0uberger0l 0 Date Legal _ 14407
`•.
Chair `a ;Board of,CoungCommissioner Risk Mgt.
Public Works
Date Cap. Pro'.
lNt4R; .,
eppt�i� Glerk "�'Jjbti �:t� K BARTON utilities
I wo
CLERK C1t2CllIT COU 3ZN +
F.Tublic Works\Capital ProjectI\ lRcad La erasU Lucas Marine\Change Orders and Work Change Directives\Work Change 2_13CCMerro doe 4/4/2006
WORK CHANGE DIRECTIVE
Oslo Road/ Lateral "J " Canal Bridge Replacement
DIRECTIVE NO . 3
CONTRACTOR : Lucas Marine Construction , Inc . Attn : Wade E Diekman
3130 SE Slater Street
StuartFlorida 34997
DATE OF ISSUANCE :
Description of Change :
Line stop for 20" WM . Price Increase : $ 18 , 265 . 00
Purpose of Work Change Directive : To install a line stop to tie in the 8" WM to the 20" WM that has
been unable to be shut down .
Attachments : None .
If OWNER or CONTRACTOR believes that the above change has affected the Contract Price or Time, any Claim for a
Change Order based thereon will involve one or more of the following methods as defined in the Contract Documents .
Method of determining change in Method of determining change in
Contract Prices: Contract Times
IR Unit Prices [] Contractor's Records
0 Lump Sum f3 Engineers Records
0 Other: 0 Other:_
Estimated increase/decrease in Contract Price: Estimated increase (decrease) in Contract Times:
$ 185265 . 00 0 Calendar Days
ISSUED: ACKNOW EDGE . /
By: By:
OWNER/ENGINEER ( ut CONTRACTOR (Authorized Signature)
Date: Date: 7
Distribution of Copies :
Terry Rauth , P . E . , IRC Capital Projects Manager
Erik Olson , P . E . , IRC Utilities Director
Mike Hotchkiss , P . E . , IRC Utilities Capital Projects Manager
Joe Loudermilk, IRC Utility Inspector
Brian Good , P . E . , Kimley- Horn and Associates , Inc.
David K. Lucas , President, Lucas Marine Construction , Inc.
Chip Boyette , IRC Project Specialist
Rick Mathis , IRC Senior Engineering Inspector
Office File
F:\Public Works\Capital Projects\Oslo Road Lateral J\Lucas Marine\Change Orders and Work Change Directives\Work Change 3.doc
L M C LUCAS MARINE CONSTRUCTION , LLC
March 14, 2006 ED L9 CIE EE
APR 0 3 2006
Indian River County Board of County Commissioners 1 �
1a4o2s� St. L. CAP I,4L 1WR ® JPr TS
Vero Beach, FL 32960-3365
Attn: Janet B . Dunlap, P.E.
RE : Oslo Road/Lateral "J" Canal Bridge Replacement
Line Stop to Tie in 8" Line t-tD c?�ik y.1 K
Ladies and Gentlemen:
As requested, we are submitting the following for your consideration. As Indian River County
Utilities has been unable to shut down the 20" watermain, we will provide all labor, materials
and equipment necessary to install a line stop in order to tie in the 8" line.
The total lump sum cost to complete this work is $ 18,265.00.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely
Wade Diekman
Vice-President
3130 SE Slater St. 9 Stuart , FL 34997 • (772) 286-5094 • Fax (772) 286- 1139