HomeMy WebLinkAbout2005-188 MAY - 18 - 2005 ( WED ) 11 : 22 warden ( FRX ) 3217285619 P 003 / 006 CHANGE ORDER NO . 003 DATE OF ISSUANCE : 6 / 7 , 2005 EFFECTIVE DATE : 6 / 7 , 2005 OWNER: Indian River County CONTRACTOR: JOBEAR / WARDEN CONSTRUCTION , INC. Project: EAST ROSELAND STORMWATER IMPROVEMENTS OWNER's Project No . 0110 OWNERIENGINEER : Indian River County You are directed to make the following changes in the Contract Documents : 1 . Description : Increase the unit price contract amount for Bid Item No. 13 . 01 4 ' high chain link fence) by a total amount of $4.09 per lineal foot for a total unit price of $ 19 . 09 per lineal foot. Bids were received on June 2 , 2004 , but the construction contr4c ct was not awarded until December 8 , 2004 and costs escalated significantly during th it time. The project was delayed because the deletion of the north stormwater pond required a new SJRWMD permit, which was not issued until December 7 , 2004. The unit price increase represents the escalation of material cost since the project bid date , b t it does not include any increase in labor costs. 2. Description : Increase the unit price contract amount for Bid Item No . 13 .02 12' wide — 4' high gates) by $ 184 .93 per gate for a total unit price of $ 1047 . 93 per gate. Bids were received on June 2 , 2004 , but the construction contract was not awarded until December 8, 2004. The project was delayed because the deletion of the north stormwater pond required a new SJRWMD permit, which was not issued until December 7 , 2004 . The cost increase represents the escalation of material since the project bid date , but it does not include any increase in labor costs. INCREASE in Contract Price = 3 gates ' _ $ 184 . 93 increase per gate = $554 , 79 3. Description : Decrease the amount of fence installed by 700 feet. Rather than run the entire length of the easterly property line , the fence will tie into a fence already installed along that boundary line by The Horne Depot. DECREASE in Contract Price: (a) Fence cost with new unit price amount = 1820 LF ` $ 19 .09/LF = $34, 7 3. 80 (b) Deduct 700 LF of fence = 700 LF * $19 . 09 = ($ 13 ,363, 00) Revised fence cost = $34 , 743 .80 • $ 13 ,363 . 00 = $21 ,380 .80 Fence cost per original Contract = $27 ,300 . 00 Therefore , DECREASE in original Contract Amount for fence = $271300 - $21 ,380. 80 $5 ,919 .20 SUMMARY OF CONTRACT DECREASE : (a) Increase in original Contract Amount for gates = $554 . 79 (b) Decrease in original Contract Amount for fence = $5 , 919. 20 (c) Net DECREASE in original Contract Amount = $5 , 919 .20 - $554. 79 = $ , 364.41 . Change Order #003 Change Order - 1 PIPublic WorksWeithmstormweter Prolects`Roseland%Change OrderslChange Order #003.doc MAY - 18 - 2005 ( WED ) 11 : 23 warden ( FAX ) 3217285619 P 004 / 006 ' r CHANGE IN CONTRACT PRICE : -Description Amount Original Contract Price $3839810 . 00 Net increase from previous Change Orders No . 001 and 002 : $56 , 570 . 00 Contract Price erior to this Change Order: $4441380 . 00 Net DECREASE of this Change Order: $5 ,364 .41 Contract Price with all approved Change Orders : $4351015. 59 CHANGE IN CONTRACT TIMES Description Time Original Contract Time Final Completion ) 120 days Net change from Change Orders No . 001 30 and 2: Contract Time prior to this Change Order. 150 days Net increase decrease this Chan2t Order: -0- Contract Time with all approved Change Orders : 150 da ACCEPTED: RECOMME D : APPROVED : By: By: 4P8Y Si CO RA OR (S nature) EN NEER ignature) OWNER (Signature) Keith McCully, P.E ., Indian Thomas S. Lowther, Chairman , f River County Stormwater Board of County Commissioners `t .sett r )P4 V Engineer (Namend T e)_ Date: s// 0 vS nate: S "� 9 �� 5 Date: 6 / 7 / 2005 rr . � . Change Order #003 Change Order - 2 F:%Pubflc WorksW41thIM'Stormvwater ProjectsAosetandlChange Orders%Change Order 0003.doc