Loading...
HomeMy WebLinkAbout2006-171 Gi � iGINAL " CGU 6 - / 7 / OU Document G701TM - 2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 003 OWNER: El 43rd Avenue Sub-Complex DATE: May 16, 2006 ARCHITECT: 43rd Avenue Vero Beach, Florida CONTRACTOR: TO CONTRACTOR (Name and address'): ARCHITECT'S PROJECT NUMBER: 2102 FIELD: ❑ Chilber Construction Co., Inc CONTRACT DATE: August 02, 2005 905 16" Place CONTRACT FOR: New Construction - OTHER: ❑ Vero Beach, Florida 32970 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, (my undisputed amnion atiribalable to previoush exe( uted Construction Chance Directives) Description: Amount Install drywall, suspended ceilings, general lighting, restrooms, AC duct work, and Floor finishes into unfinsihed Public Works Area $57, 119.05 Subtotal : $57, 119.05 Contractor's Fee: $ 8,462.36 CHANGE ORDER TOTAL: $65 ,581 .41 The original (Contract Sum) was $ 3, 1 16,305.00 The net change by previously authorized Change Orders $ 67,933 .59 The (Contract Sum) prior to this Change Order was $ 3, 184,238.59 The (Contract Sum) will be increased by this Change Order in the amount of $ 65,581 .41 The new Contract Sum including this Change Order will be $ 3,249.820.00 The Contract Time will be changed by thirty ( 30 ) days. The date of Substantial Completion as of the date of this Change Order therefore is July 23, 2006 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive, NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Donadio & Associates, Architects, P.A. Chilberg Construction Co., Inc. Indian River County Board of County Commissioners ARCHITECT (Finn name) CONTRAC n name) OWNER (Firm mm�e) 609 17th Street, Vero Beach, FI 32960 905 1 Pla e 2 o Beach, FI 32960 1840 25th Street, Vero Beaeh,Fl 32960 ADDRESS ADD ADDRESS BY (Signature) BY (Signa (Signam e) Anthony Donadio Steve Chilberg, Prident septi A. Baird, County Administrator (Typed name) (Typed name) (Typed name) &0110 DATE DATE DATE Reviewed a d commended f x- A proval : ap (? say Lyn illiams, Project manager Thomas W. Fra , General Services hector Jaso Brown, d IA Document G701n" - 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights r served. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or d tribu ' n of this AIA® Document, or 1 any portion of it, may result In severe civil and criminal penalties, and will be prosecuted to the maximum existBible under the law. This document was produced by AIA software at 08:41 : 10 on 05/16/2006 under Order No. 1000192296_1 which expires on 8/8/2006, and is not for resale. User Notes: (998702502) CHILBERG CONSTRUCTION COMPANY, INC . CHANGE ORDER WORKSHEET DATE: 4/27/2006 PROJECT: 43rd Avenue CO #4 - REVISED DESCRIPTION : Vanilla box CODE TASK VENDOR AMOUNT GEML CONDITION A 01025 General Liability Insurance C.C .C./Zurich Insurance Services 275.84 B 01030 Builders Risk Insurance C.C.C./Zurich Insurance Services 179.24 C 01035 Worker's Compensation C.C.C ./FCCI 2, 158. 17 D 01620 Auto Expense Chilberg Construction Company Total General Conditions 2,613.25 LABOR A 01041 Project Management Chilberg Construction Company B 01043 Project Supervision Chilberg Construction Company 1 ,200.00 C 01300 Submittals Chilberg Construction Company 100.00 Total Labor 1 ,300.00 SUBCONTRACTOR 15400 Additional Work Snyder Plumbing 8,027.00 09250 Drywall Atlantic Interior 8,980.00 15500 HVAC BCI 9,351 .52 Cut & Pour Concrete 1 ,395.00 16050 Electric Paragon 9, 141 . 00 Carpet & VCT Atlantic Interiors 6,010. 00 Paint 31014.00 Total Subcontractor 45,918.52 MATERIALS A Doors & Hardware 11000.00 B Toilet Accessories 544.00 C Acoustical ceiling 4,920.00 D Doors & Hardware(2) 120.00 Total Materials EQUIPMENT 6,584.00 A BB Total Equipment PREPARED BY: SUBTOTAL 56,415.77 NOTE: General Liability Insurance .0046 on Subs and .0497 on Labor Overhead Builders Risk Insurance .30 per $ 100.00 Profit/Builder's Fee % 8,462.36 Workers Camp .0476 Supervr.2880 Carp.1,0059 Met. Bond Expense % 703.28 Auto Expense is $ 3.73 per hour TOTAL 65,581 .41 30 Das Bond Expense is .01084 of total was not calculated on original but estimated See attached. I RECEIVE ® PARAGON ELECTRIC of Vero , Inc. MAY t x" 2006 9120 16th piece, Vero Beach, FI., 32966 ' IENERAL SERVICES Phon® 77,A:569-8961 Fax 2-299-5167 Hate: 5/10/2006 To : CD"1RG CONSTRUCTION INC. Steve �, + ` •� Phone: 772-978-1707 Fax : 772-978-1709 Job : 43rd Aire. Sub Complex - Additions Quote: To provide and install electrical Wiring as per plans and specifications dated to inolude: Add two fire alit an strobe units for additional rest rooms. 2 Strobe lights 1 lot conduit and wire 2 back; boxes 1 modify drawings for Pira Marshall Total Material and Labor $ 857.00 tlle:051006 Chilherg t0 39Vd DNI-OIN10313 N09VWcj L9T966ZZ11 F. T : AT CIGM7 /7T /CO �20M : ATLRNTIC INTERIOR SERUICES . INC FRX NO. : 5615752770 Apr . 20 2006 10 : 16AM pi lata N 3L 208 NInterior Services , Inc . , ' tJ :S. IfWy. 1 • Suil'e #2 • Tequesta, FL 33469 Ph . : 561 -575-4499 • Fax: 561 -575-2770 Proposal April 20, 2006 Submitted to.: Chilberg Const, Phone: 772-978- 1701 Fax: 772-9784701 Attention: George Job Name ; Indian River County 43rd Ave, Sub-Complex . Vanilla Box Plans Dated ' We propose to furnish labor, material and taxes for the Drywall and Acoustical Ceilings on the above referenced project. Drywall — .Smootb finish ready for paint: Perimeter Walls, 7/8" furring and 5/8" rock to 10' . 2 restrooms 7' x 8 ' TOTAL. $8 ,980 . 00 AcousticaLCeilings: 2 ' x 2' x 5/8" HumaGuard with Intermediate Grid TOT . $ 4 ,920 . 00 e Saunderson, Presi en A rnie ctirnl f-`.c iliri rtc • Arn. + ctirnl l All Pn "Pl � • (`rrnriiir Tilo. • Tlr.....all . Flrr..• �` ...*.� -n, . .., 11' 0'4 / 1 1 / 2006 15 : 41 FAX 17725693055 SNYDER � PLUMBING + CHILBERG Ia001 / 002 I - r r r Snyder Plumbing of the Treasure Coast, Inc . 1525 Old Dixie Highway Vero Beach , Florida 32960 Date Change Ord . . . STATE OF rLORfDA LICENSE NUMBER CFC] e1.595.Z 4/ 17/ 2006 1948 Name / Address Change Order Chllberg Construction Company, Inc . 905 16th PI Vero Beach, FL 32960 Project IR ADMIN COMPLEX Description BLDG # 1 PUBLIC WORKS AREA # 133 / WC- 1 ADA 2- Z- 5660 Zurn HC bowl , ZER6000AV-WSI-CPM Zurn battery water closet flush valve, Z5955SS- EL Zurn elongated seat less cover 2- Water Closet supply L- 1 ADA 2- 25344 Zurn wall hung lavatory, Z82200CP4 - 3M Zurn single handle lever faucet, p -trap, grid strainer, supplies , handicap wrap 2- Z- 1231 Zurn lavatory carrier 2- PR- 500 Precislon trap primer 2- #ZN -415 Zurn 3 " floor drain - NH - 66 - P SCOPE OF WORK INCLUDED : 1 - Provide plumbing for and install the above listed fixtures . 2 - Connect to existing sewerand water. 3- All waste and vent piping to be Schedule 40 PVC . 4- All water piping to be Type " L" copper. SCOPE OF WORK NOT INCLUDED : 1 - No A/C condensate drain piping , insulatlon or A/C drywells. 2- No gas piping . 3 - No warranty on any Owner provided fixtures . 4- No Compaction of trenches 5 - No cutting or patching of floors . Total $ 8 , 027 . 00 Signature Phone # Fax # 772 - 569-3373 772 - 569- 3055 V4 / 1 . 1, Lvvo Lo . 44 rnn III [ otoovoo ) NYuLh4r LUMblNU + UHi Leena � uVZ / VOY Ar; r . 'l . 2 , i ; , 26AM Ch111, 00 Cc ;rs 'tru : t on —�L No . 3637 I r - - - i �p 4" I I r 1 4 l a i Ir L I I 1 R4� � i FOR FUTURE SA I RE 2` - - - I USE 4 ` �- L _ _ i 2 4 � ' ME ib 4 �' , a, 11 Ln — (�I_ _ of _ — L -_ � - _ -- - - - - � o I M �-- - -- -- ,L - T - - { -- j 1 cell In a to) r �1- x ti 10 ti w 0 h 04 /25/ 2006 15 : 22 7722995167 PARAGON ELECTRIC_ INC PAGE 01 PARAGON ELECTRIC of Vero , Inc . 9120 16th Place, Vero Beach , FL. 32966 Phone 772-569-5961 Fax 772-299-5167 Date: 4/26/2006 To: CAILB.ERG CONSTRUCTION INC. George Fisher Phone: 772-978-1707 Fax: 772-978-1. 709 Job : TRC 43rd Ave. Sub Comlplex Quote: To provide and install electrical wiring to include: Changes to Room 133 Building # 1 to include: 1 Lighting to match similar office areas using 50 - 2 X 4 lay in. Parat,olic fixtures Type A 1 Wiring for 2 Bathrooms - one light and exhaust fan (exhaust fan b 1r others) 1 add conduit and wire 1 lighting contactor to control lighting in large room Total Material and labor S 8,2114.00 Note: Due to very unstable commodity prices this quote is subject to change. file: 042606 Chilberg CHANGE ORDER PROPOSAL #1 Date: BCI Mechanical 145 East Dr. Project: 43rd Ave. Sub Complex Melbourne, Florida 32904 Location : Vero Beach Tel: (321 ) 726-8000 General Contractor: Chilberg Construction Fax: (321 ) 723-8479 Description : Add Ductwork in room 133 MATERIALS QTY COST EXTENDED LABOR TYPE RATE HRS EXT. Off O/T Rate EXT Ceiling mount grilles 10 $ 65. 00 $ 650 . 00 Sheet Metal Mech $ 28 . 00 64 $ 11792. 00 $ 42. 00 $ Ductwork to grilles 1 $ 200 .00 $ 200. 00 Insulation Mach $ 28. 00 16 ' $ 448 . 00 $ 42.00 $ Branch duct to bathrooms 200 $ 0. 89 $ 178. 00 Administrative $ 45. 00 2 $ 90. 00 $ 67. 50 $ Insulation on branch duct 400sq f $ 0. 68 $ 272 . 00 TOTAL 82 $ 21330 . 00 0 $ $ $ Exhaust fans and ductwork 2 $ 225 .00 $ 450. 00 Regular Hours 82 $ 21330 . 00 Grilles for return 10 $ 85. 00 $ 850. 00 Overtime Hours 0 $ - Return air duct for 400 $ 0.89 $ 356 . 00 $ ceiling return plenum $ $ $ $ Insulation on return 400 $ 0. 68 $ 272 . 00 $ TOTAL $ 31228.00 TOTAL 82 $ 2,330.00 JOB EXPENSE COST RECAP MATERIALS $ 3 ,228. 00 MATERIAL COST $ 31421 .68 6% Sales Tax $ 193.68 LABOR COST $ 41138. 08 MATERIAL TOTAL $ 31421 .68 Equipment COST SUB TOTAL $ 71559. 76 MANHOUR LOADING ( reference) OVERHEAD $ 755 . 98 10% Foreman 1 20% $2, 330. 00 $ 466. 00 NET SUB TOTAL $ 81315. 74 Journeyman 100% $ 21330. 00 PROFIT $ 415 . 79 5% $ 25796. 00 BOND PTI 44% $2, 330. 00 $ 11230.24 % SUB CONTRACT Small Tools 4% $ 2, 796. 00 $ 111 . 84 Test & Balance $ 800 .00 TOTAL LABOR $4, 138.08 RTOTAL COSTS $ 99531 .52 APPROVED BY: Date: Please print name Authorized Representative of: No action will be taken without name and signature