Change Order
PROJECT (Name and address): CHANGE ORDER NUMBER: 005 OWNER:
43rd Avenue Sub-Complex DATE: August 22, 2006 ARCHITECT:
43rd Avenue
EJ
Vero Beach, Florida CONTRACTOR:
TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 FIELD: ❑
Chilber Construction Co., Inc CONTRACT DATE: August 02, 2005
905 16" Place CONTRACT FOR: New Construction OTHER: ❑
Vero Beach, Florida 32970
THE CONTRACT IS CHANGED AS FOLLOWS:
(hcbtde, inhere applicable, any undisputed amount attributable to previously executed Construction Change Directives)
Description: Amount
Add additional sixty seven (67) days to cannot contract time in order to complete necessary work lot substantial
completion as per attached letter from Chillberg Construction Company dated July 19, 2006. $ 0.00
The original (Contract Sum) was
$ 3, 116,305.00
The net change by previously authorized Change Orders $ 141 ,297.80
The (Contract Sum) prior to this Change Order was $ 3,257,602.80
The (Contract Sum) will be increased by this Change Order in the amount of $ 0.00
The new Contract Sum including this Change Order will be $ 3,257,602.80
The Contract Time will be changed by sixty seven ( 67 ) days.
The date of Substantial Completion as of the date of this Change Order therefore is September 28, 2006
NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which
have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
Donadio & Associates, Architects, P.A. Chilberg Construction Co., Inc. Indian River County Board of County
Commissioners
ARCHITECT (Firm name) CONTRACTO `rrn name) nam
e)609
(Firm nae)
609 l70c ero gaaq%h, FI 32960 905 16` PIa , Vero <5,�FI 372960 184025th Street, Vero Beach,Fl 32960
ADR S ADDRES RESS
%O�Byiolrslgr ore) BY (Signnnme B (Signal rre)
, r
Anthony Donadio Steve Chilber esid ose h A. Baird, Count Administrator
(Typed name I / (Typed nante) (Typed name)
DADATE DATE `
Reviewed and Red IT ded for Approval :
Ly illiams, Project Manager Thomas W. Frame, Gen ral Services Director Jaso Brown, Bu get Director
AIA Document G701 TM - 2001 . Copyright 01979, 1987, 2000 and 2001 by The American Institute of Architects. I rights reserved. WARNING: This Ali
Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any .I
portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document
was produced by AIA software at 12:26: 11 on 07/24/2006 under Order No.1000192296_1 which expires on 8/8/2006, and is not for resale.
User Notes: (3414645902)
Milberg
construction
company
July 19, 2006
Lynn Williams, Buildings & Grounds
Indian River County
1840 25th Street
Vero Beach, FL 322960
Dear Lynn:
Pursuant to Article 8 . 3 of the A201 Contract I would like to request a change order to the
contract extending the contract time to September 28th. 2006 . The request of time extension is
driven by the Electrical service installation by FPL and a previous change (Change order #3 ) to
the contract for the "vanilla box" build out.
F. P . L was contacted in November of 2005 to start engineering on the site and was in full
knowledge of our completion date of our project. In March 2006, they requested an easement
for the property. This request was forwarded to you on or about March 23 , 2006 we should
have been notified early on in the project not 5 months later. My understanding is that they will
not start getting power to the site until the first week in August, which will delay the project 4-5
weeks . This delay will hold up the installation of the final interior finishes, such as ceiling tile,
flooring and interior doors.
The building permit still has not been released from the Fire Dept as of July 18, 2006 . The time
extension requested on the Vanilla Box change order was based on the permit release as of June
8Th. 2006 . This delay has prevented us from proceeding on plumbing, electrical and HVAC,
which are required prior to interior finish installation.
Based on these specific issues I feel Chilberg Construction should be granted the extension. The
electrical installation is the critical path item that is delaying the original contract work. No
general conditions are being requested.
Si re y
Steven President ' JUL
Chilb g Const ction Co. f Jedq �
SJC/m y ;i1I10., F R1�Ra ;r
c
0
< <9 2
Z:AWORKVCtmCnlJObSVOPFNV13rdAve SubComPlexV(. ORRFSI'ONUGNCI:A(:ountyVF.Yvin Will irons July l9doc ' � �aS
® ems
Commercial & Residential Development
905 16th Place Vero Beach, Florida 32960 Tel 772.978. 1707 Fax 772.978. 1709 Email: steve@chilberg.com