HomeMy WebLinkAbout2006-399A The Lakes at Sandridge Phase I MODIFICATION TO CONTRACT FOR CONSTRUCTION OF REQUIRED SIDEWALK IMPROVEMENTS NO . PD-03 -07-17 -SIDE (2002120179 -38772 ) THIS MODIFICATION , made and entered into this /45 day of 11ky -PL6&z.- , 2006, by and between IRC Development, L. L.C ., a Florida limited liability company, hereinafter referred to as "Developer ', and INDIAN RIVER COUNTY, a political subdivision of the State of Florida , by and through its Board of County Commissioners , hereinafter referred to as "County". WITNESSETH : WHEREAS , Developer entered into a Contract for Construction of required Sidewalk Improvements No . PD-03-07- 17-SIDE (2002120179-38772) guaranteeing the completion of certain required sidewalk improvements on or before August 10 , 2006 and posted a Colonial Bank, N .A. Irrevocable Letter of Credit No . 8037093427-55 in the amount of $ 123 ,287 . 50 (expiring on November 10 , 2006 ) as security to guarantee completion ; and WHEREAS, a portion of sidewalk improvements has been completed ; and WHEREAS , the developer has 1 . requested an additional two-year extension to August 10, 2008 to complete the remaining required sidewalk improvements , as allowed by code; 2 . requested a substitution of security in the form of cash 3 . requested a reduction in the amount of security necessary to complete the remaining sidewalks ; and 4. provided an updated certified cost estimate attached as Exhibit "A"; NOW, THEREFORE, IN CONSIDERATION OF THE MUTUAL COVENANTS AND PROMISES HEREIN CONTAINED , the parties agree as follows : 1 . The date for completion of the required sidewalk improvements as outlined in the Contract for Construction of Required Sidewalk Improvements No . PD-03-07- 17-SIDE (2002120179-38772) is extended to August 10 , 2008 . 2 . The substitution of security in the form of cash in the amount of $27 ,795 . 00 which amount represents 125% of the remaining sidewalk improvements to be completed as evidenced by developer's engineer's certified cost estimate as approved by County Engineering , attached as Exhibit "A" , is acceptable . 3 . All other terms set out in the Contract for Construction of Required Sidewalk Improvements No . PD-03-07- 17-SIDE (2002120179-38772 ) remain in full force and effect. IN WITNESS WHEREOF , the parties hereto have set their hands and seals on the day and year first above written . IRC DEVELOPMENT, L. L.C . , a Florida Signed in the presence of: limited liability company VELD ER Sign : R . j, Print: � R - 146e, LL.ft2 By: = J William J . Ims , Jr. , Manager Sign : &4t-CL- � Print- 6A-fvD2,4 6 tY 1 INDIAN RIVER COUNTY, FLORIDA by and through its Board of County Commissioners By: q �-a G ✓1 il[oseph A. Baird ounty Administrator Authority: Resolution No . 2006-= APPROVALS : PUBLIC WORKS DEPARTMENT l APPROVED AS To FORM BY' AW LNAL SUFFICIENCY J roes W . Davis, P. E. hector by �( ��jJ WILLIAM G. COLLINS H COMMUNITY DEVELOPMENT DEPARTMENT COUNTYATTORNEY By: / I � Robert M. Keatirig , Dir ctor 2 F:\Attomey\Nancy\DOCS\PLANWODIFICATION TO side K lakes at sandridge ph i.doc gIVER a z �LORI�A INDIAN RIVER COUNTY MEMORANDUM DATE : November 1 , 2006 TO : William G . Collins , II , County Attorney THROUGH : Christopher J . Kafer, Jr. , P . E . , County Engine FROM : William B . Eubank, Jr. , Senior Engineering Inspector iL SUBJECT : Lakes of Sandridge Phase I , Onsite Sidewalk Bond Renewal REFERENCE: Project No. PD-03-07- 17 12002120179-46216 The enclosed engineer's certified cost estimate and quantities have been reviewed for the interior sidewalks and are found to be satisfactory. The total amount of the bond is $27 , 795 . 00 ($22 , 236 . 00 x 125% ) . If you have any questions , Please call me at extension 1451 . WW /bjr cc : Jason E. Brown , Budget Manager D . E. Howard , Jr. , Manager, Construction Coordination Mark Zans , Staff Planner, Current Development Joseph Schulke , P. E . , Schulke , Bittle & Stoddard , L. L. C . File P VI pl ul sc y ' e F g I i t Page 1 of 3 F:\Engineering\Land Development Permits\Lakes of Sandridge (fka Paladin Place)\Lakes of Sandridge Phase I onsite sidewalk bond renewal-11 -1 -06-wbe.doc JOSEPH W. SCHULKE, P.E. SCHULKE , BITTLE & STODDARD , L . L . C . JODAH B. BITTLE, P.E. WILLIAM P. STODDDARD, Ph.D., P.E. CIVIL & STRUCTURAL ENGINEERING • LAND PLANNING • ENVIRONMENTAL PERMITTING Engineers Certified Cost Estimate — The Lakes of Sandridge Subdivision I, Joseph W. Schulke, P .E. , A Florida registered engineer, License No. 47048, do hereby certify to Indian River County that a cost estimate has been prepared under my responsible direction for the sidewalk improvements itemized in this exhibit and that the total cost estimate for said improvements is $27 ,795 .00, and represents the estimated cost to construct the remaining required sidewalk improvements plus a 25 % contingency . This estimate has been prepared, in part, to induce approval by the county of reducing proper surety amounts associated therewith. / Date : lohl 6josep X . chulke, P.E. No. 47048 e Page 2 of 3 1717 INDIAN RIVER BLVD., SUITE 201 , VERO BEACH, FLORIDA 32960 TEL 772 / 770-9622 Fm 772 / 770-9496 EMAIL info@sbsengineers.com Lakes of Sandridge Remaining Sidewalk Bond Amount 10/11 /2006 DESCRIPTION UNIT I QUANTITY JUNIT PRICE I TOTAL GENERAL Interior sidewalks SF 4360 $5 . 10 $223236 .00 Lots 4 15 , 19,20360,74, 82 ,863 87588, 89390391 , 141 Subtotal $225236.00 PLUS 25% $5,559.00 BOND AMOUUNNTS $27,795.00 Date: fakll & Joseph Schulke, P.E. Re 'o. 4j1048 r. � I � 1 Lrq a BV Fr 8V a Page 3 of 3