Loading...
HomeMy WebLinkAbout2004-146 for use with performance bond Riverwind Subdivision Phase Two 0 CONTRACT FOR CONSTRUCTION OF REQUIRED IMPROVEMENTS NO . SD -02 -06 -11 -CFCPHII (2002020080 -39707) THIS CONTRACT , made and entered into this 22nd day of June , 20049 by and between JDC FLORIDA, INC . , an Alabama corporation authorized to do business in the State of Florida , hereinafter referred to as " Developer, " and INDIAN RIVER COUNTY , a political subdivision of the State of Florida , by and through its Board of County Commissioners , hereinafter referred to as "County" . WITNESSETH : WHEREAS , Developer is commencing proceedings to effect a subdivision of land within Indian River County , Florida ; and WHEREAS , a final plat of the subdivision within the unincorporated area of Indian . River County shall not be recorded until the Developer has installed the required improvements or has guaranteed to the satisfaction of the County that such improvements will be installed ; and WHEREAS , Developer requests the approval and recordation of a certain plat to be known as Riverwind Subdivision Phase Two ; and WHEREAS , the required improvements are to be installed after recordation of this plat under guarantees posted with the County. NOW , THEREFORE , IN CONSIDERATION OF THE MUTUAL COVENANTS AND PROMISES HEREIN CONTAINED , the parties agree as follows : 1 . Developer agrees to construct on or before June 22 , 2005 , in a good and workmanlike manner, those improvements described as follows : See Exhibit "A" attached hereto or otherwise required by the Indian River County Code in connection with the approval of said plat . A copy of the plat shall be recorded in the Public Records of Indian River County , Florida upon the final approval of the Board of County Commissioners and made a part hereof for all purposes . 2 . Developer agrees to construct said improvements strictly in accordance with the land development permit , the most recent set of plans and specifications for this subdivision approved by the County and on file in the Planning and Development Division , and all County development regulations and standards , including conditions and requirements of any applicable County right-of-way permit , all of which are hereby incorporated by reference and made a part hereof. 1 FAattomey\nancy\DOCS\PLAN\k for constr w perf bond riverwind ii .doc t 3 . In order to guarantee performance of this contract , Developer shall simultaneously herewith furnish a performance bond underwritten by a surety insurer authorized to transact such business in this state , which shall remain in full force and effect until at least ninety (90 ) days beyond the date set forth in paragraph 1 , or until the covenants of this contract have been fully complied with and satisfactorily completed as determined by the County pursuant to paragraph 5 below, in a form to be approved by the County , with Developer as principal and Scheer ' s Incorporated , as the surety , in the amount of $ 1 , 442 , 832 . 33 , which amount is not less than one hundred fifteen percent ( 115 % ) of the estimated total cost of improvements remaining to be constructed , as determined in accordance with the County' s Subdivision and Platting Ordinance . It is understood that the full amount of the guaranty shall remain available to the County and shall not be reduced during the course of construction without an express written authorization from County. Requested reductions shall not be unreasonably withheld by the County. Developer may at any time substitute guarantees , subject to the approval as to form and amount by the County. 4 . Up to $ 1 , 000 , 000 . 00 , or the limits of any applicable underlying or excess insurance coverage carried by Developer or to be obtained during the course of the construction of the subdivision improvements , Developer agrees to indemnify, hold harmless , and defend the County against any and all claims , damages, losses , and expenses , including attorney's fees , for property damage , personal or bodily injury , or loss of life , arising from the negligent acts or omissions of the Developer, its officers , employees , agents , or contractors , subcontractors , laborers , or suppliers , relating to the construction of the required improvements , including all those improvements to be constructed on existing publicly dedicated or County-owned property , such as street , sidewalk , bikepath , lighting , signalization , traffic control , drainage , water, or sewer improvements . 5 . The County agrees to approve the plat for recordation in the Public Records of Indian River County , Florida upon a finding as to compliance with all applicable provisions of the County's Subdivision and Platting Ordinance and upon execution hereof. The County shall accept those areas specifically dedicated to the County for the purposes indicated on the plat at the time of plat recordation . However, nothing herein shall be construed as creating an obligation upon the County to perform any act of construction or maintenance within such dedicated areas until such time as the required improvements are satisfactorily completed . Satisfactory completion in accordance with the land development permit , plans , specifications , and ordinance requirements of Indian River County shall be determined by the County and shall be indicated by specific written approval of the Public Works Director or his designated representative , after receipt of a signed and sealed Certificate of Completion from the project engineer of record . 6 . In the event the Developer shall fail or neglect to fulfill its obligations under this contract and as required by the Indian River County Code , the Developer, as principal , 2 FAattorney\nancy\D0CS\PLAN1k for constr w perf bond riverwind ii .doc 06 / 14 / 2004 MON 12041 FAX 772 564 9822 Regatta Construction LLC Z005 / 005 and the guarantor or surety shall be jointly and severally liable to pay for the cost of construction and installment of the required improvements to the final total cost, including but not limited to engineering , construction , legal and contingent costs , including reasonable attorneys fees incurred by the County, together with any damages , either direct or consequential , which the County may sustain as a result of the failure of Developer to carry out and execute all provisions of this contract and applicable ordinances of the County. In no event, however, shall the liability of the guarantor or surety under this paragraph exceed the total amount of the original obligation stated in the guaranty or surety instrument, less any approved reductions thereto . 7 . The parties agree that the County at its option shall have the right, but not the obligation , to construct and install or, pursuant to receipt of competitive bids , cause to be constructed and installed the required improvements in the event Developer shall fail or refuse to do so in accordance with the terms of this contract. Developer expressly agrees that the County may demand and draw upon the existing guaranty or surety for the final total cost of the improvements . Developer shall remain wholly liable for any resulting deficiency, should the guaranty or surety be exhausted prior to completion of the required improvements . In no event shall the County be obligated to expend public funds , or any funds other than those provided by the Developer, the guarantor, or surety, to construct the required improvements . 8 . Any guaranty or surety provided to the County by Developer with respect to this contract shall exist solely for the use and benefit of the County and shall not be construed or intended in any way, expressly or impliedly, to benefit or secure payment to any subcontractor, laborer, materialman or other party providing labor, material , supplies , or services for construction of the required improvements , or to benefit any lot purchaser(s ) , unless the County shall agree otherwise in writing . 9 . This agreement is the full and complete understanding of the parties and shall not be construed or amplified by reference to any other agreement, discussion , or understanding , whether written or oral , except as specifically mentioned herein . This agreement shall not be assigned without the express written approval of the County. Any amendment, deletion , modification , extension , or revision hereof or hereto shall be in writing , executed by authorized representatives of both parties . IN WITNESS WHEREOF , the parties hereto have set their hands and seals on the day and year first above written . JDC FLORIDA, INC. , an Alabama corporation authorized to do business In the State of Florida 4 DEVELOPER By. . J hn B . Sain , President 3 F:luttorneylnancylDCXoS\PIAN1k for conSV w perf bond rinrwind ii .4oc INDIAN RIVER COUNTY , FLORIDA By. ni�67 & zDag Caroline D . Ginn , C airman Board of County Commissioners ATTEST : Jeffrey K . Barton , Clerk BCC Approved : June 22 , 2004 By: . 4 � 4qgA:::3 � Deputy Clerk APPROVED AS TO FORM AND LEGAL SUFFICIENCY : . By: 'William G . Collins II County Attorney 4 FAattorney\nancy\DOCS\PLAN\k for constr w perf bond riverwind ii .doc Riverwind Phase II Estimated Site Construction Cost CONSTRUCTION COST ESTIMATE 4/30/04 BID (WANTITES TABULATION DESCRIPTION UNIT 91JANTITY UNIT PRICE TOTAL PRICE 3 .. .. .KN} M . 'i3'' selF � [�ry,6 { J'. .L �1 _ e• . M n NEW 1" F ' y T . . xr Mobilization LS 1 $ 51400.00 $ 51400.00 Silt Fence LF 41170 $ 1 . 95 $ 81131 .50 Disk LS 1 $ 11180.00 $ 11 180.00 Excavation LS 1 $ 160 077.60 $ 160t077.60 Embankment LS 1 $687359.20 $68,359.20 Fill and Compact LS 1 $174,750. 00 $1741750.00 7 Grade Lots LS 1 $76 , 697.25 $76,697.25 Grade Paved Areas LS 1 $80846 .31 $8, 846.31 Grade Green Areas LS 1 $4,010. 50 $4,010.50 Final Dress and Cleaning LS 1 $ 10,626.00 $ 10,626.00 Grade Lake Slopes LS 1 $6,437.75 $67437.75 Total Site WorkMEMO $534,516.11 l» ' x. a -.N r w .x`. . c."r "r�r r,�f . a ' jh'it"F^F;»w 'S ,`P y�X 1rs�". :'. 'E ] epi . - 'i .ti x. "4iF;• da ' 'T'Xm�f '�3s ,J`Rfi Storm Manholes EA 2 $ 21150 . 00 $4,300.00 Control Structure EA 1 $ 6,474.60 $6,474.60 Gutter Inlet 'V" EA 10 $ 21090. 00 $20 900.00 Z 15" RCP LF 120 $ 23. 00 $2,760.00 7r' � 36" RCP LF 289 $ 77.00 $ 22,253.00 18" CAP LF 940 $ 34. 10 $32,054.00 36" CAP LF 206 $ 51 .67 $ 10,644.02 Total Stormwater Construction $ 999385,62 r r r ORE az wr t _ �l`f':i °. a �` -.: �T - , e. e x�F� 3. r3•`4, 3 - p n. t 8" Gravity Sewer 0'-6' Dee LF 299 $ 16 .78 $ 5,017.22 8" Gravity Sewer 61-8' LF 374 $ 26 .34 $ 985116 8" Gravity Sewer 8'-10' Dee LF 674 $ 48.72 $ 32,837.28 8"Gra ' Sewer 10'-12' Dee LF 648 $ 21 .46 $ 13 906.08 8" Gravity Sewer 12'-14' Dee LF 157 $ 39.60 $ 621720 Manhole 6'-8' Dee EA 4 $ 2l475.00 $ %900.00 Manhole 8'-10' Dee EA 4 $ 41537.50 $ 18150.00 �.r��Cr► Manhole IUA2' Dee EA 3 $ 11723.34 $ 51170.02 t 1 6" Sewer Laterals EA 23 $ 11243.48 $ 28,600.04 V � TV Tests LS 1 $ 3, 300.00 $ 3,300.00 Tie Into Eidstina Manhole LS 1 $ 11980.00 $ 1 ,980.00 Total Sewer Construction �� a� $ 134,929.00 4 Riverwind Phase If Estimated Site Construction Cost A ma r.w�1 8" Dia Water Main LF 254 $ 38.39 $ _ 9, 751 .06 8" Dia. Gate Valve EA 1 $ 21310.00 $ 29310.00 " n a 8 TEE EA 1 $ 632.00 $ 632.00 { 8"x6" Reducer EA 1 $ 660.00 $ 660.00 . 8" Temp Plug w/ Blow of EA 1 $ 302.00 $ 302.00 \ Fittings LS 1 $ 31300. 00 $ 3 ,300.00 6" Dia. Water Main LF 21000 $ 14.29 $ 28,580.00 6" Dia. Gate Valve EA 9 $ 753.50 $ 61781 .50 TEE EA 4 $ 206.25 $ 825.00 �_ v 6" plug w/ Blowoff EA 3 $ 302.50 $ 907. 50 6" 22.5 Deg Bend EA 2 $ 220.00 $ 440.00 ` �a Fire Hydrants (Complete) EA 2 $ 31449.50 $ 61899.00 k Single Water Service 1 " dia. shortw/ RPZ EA 1 $ 1 ,250.00 $ 11250.00 Single Water Service 1 .5" dia. EA 4 $ 756.25 $ 39025.00 Double Water Service 1 .5" dia EA 26 $ 634.62 $ 16 500. 12 2" Ternporary Jumper EA 2 $ 783 .75 $ 11567.50 Sam le Points EA 4 $ 605.00 $ 21420.00 Pressure Test LS 1 $ 825. 00 $ 825.00 Ch Water Main LS 1 $ 825.001S 825.00 Connect to EAstin Water Main LS 1 $ 550.00 $ 550.00 Total Water Construction $ 88,550 6 I PON 1 .5" Pavin SY 5v993 $ 5. 553A 23 $ 31 ,343.39 6" Base Course SY 5 ,993 6/55 $ 653.78 8" SubgradeASY 71311 $ 2. 15 $ 15J18.65 r " D "Curb LF 500 $ 8. 58 $ 41290.00 Miami Curb LF 4,050 $ 9. 19 $ 37,219.50 SignagelPavement Markings LS 1 $ 21860.00 $ 2,860.00 Dens4 Reports LS - 1 $ 31370.00 $ 3370. 00 Total Street Construction $ 95,455.32 Riverwind Phase II Estimated Site Construction Cost A i r ll I MAINE Roadw Sod LS 1 $ 11287.00 $ 19287.00 Lake Slope Sod LS 1 $ 15 958.80 $ 151958.80 Berms CY 889 4. 00 $3,556.00 Hedges Unit 320 7.50 $2 400.00 Trees (Canopy) Unit 80 175. 00 $ 14 000. 00 Trees Understo Unit 32 75. 00 $2,400.00 , inrigatiDn LS 1 159000. 00 $ 15,000.00 Total Landscape Construction $ 54,601 .80 Construction Layouts LS 1 $ 25 000.00 $ 259000.00 Street Lighting LS 1 $ 15 000.00 $ 15 000.00 Electrical Conduits LS 1 $ 37 000. 00 $ 37,000.004 Permanent Reference Monument Unit 25 $ 200. 00 $ 5,000.00 5, �-� .0 Permanent Control Point Unit 14 $ 125. 00 $ 1 ,750. 00 Total $ 839750.00 Total Estimated Construction Cost $1 ,090,988.53 Engineering/Survey/Inspection (16%) 163, 648.28 Construction/EngineeringiSunvWnspection (Total) $1 r25496536,811 Performance Bond (16%) 188, 195.52 Performance Bond (Total) $1 ,442,832.33 STEPHEN E. MOLER, P. E. FLORIDA #33193 V PRESIDENT APR 3 0 2004