Loading...
HomeMy WebLinkAbout2006-004 WORK AUTHORIZATION DIRECTIVE No. 2005_0I7 )Ooi� - OOJY DEC 14 2005 IRC — BLACK VILLA WATER MAIN EXTENSION ON 201" ' AVENUE AT 9" ' PLACE DATE OF ISSUANCE: December 20, 2005 EFFECTIVE DATE : December 20 , 2005 OWNER: Indian River County CONTRACTOR: The Danella Companies Inc CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033 PROJECT : IRC — Block Villa Subdivision 6" Water Main Tie- In on 20°i Avenue at 9" Place COUNTY UTILITY PROJECT NO . : UCP # 2624 CONTRACTOR' S PROJECT NO . : N/A You are directed to proceed promptly with the following work: Description : Install about 60 L F of 6" FIDPE Directional Drill water pipe across 20°i Avenue at 91' Place and tie into existing 6" AC Pipe with Wct Tap Assembly with 6" GV&B ; install 6" GV&B on end . Puppose of Work Authorization Directive : The installation of (he 6" FIDPE water main will allow the Contractor for the Block Villas Water Assessment to complete his project Attachments : (List documents supporting work) Exhibit 1 Cost Estimate Method of determining Contract Price : Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County Commissioners on February 15 , 2005 to The Danella Companies . ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract. Time is summarized below: Estimated Labor Cost = $4,259 . 35 Estimated Contract 14 days Time : ..'R, Total Estimated Labor Costs = $4 , 259 . 35 ;v f ACC TE REC M",D : APPROVI D By: By. B DANELLA ENGINEER C1 IR COMPANIES r Date : IL -/ 2 -0 _S� Date : �2 �� Date : 01 '=03s06•, t ; o '% . . Exhibit 2 CADOCUM G— I ANFIDUC - I ALOCA LS— I vremp`,notcs6030C 8t- 1934501 .doc WORK AUTHORIZATION DIRECTIVE 13 - a (4 D No . 2005-017 4 2005 fr IRC — BLOCK VILLA WATER MAIN EXTENSION ON 20TH AVENUE AT 9TH (PLACE DATE OF ISSUANCE : December 20 , 2005 EFFECTIVE DATE : December 20 , 2005 OWNER : Indian River Count CONTRACTOR : The Danella Companies , Inc . CONTRACT : WATER , SEWER AND RECLAIM WATER LINE REPLACEM=E=NT=/ EXT � NSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033 PROJECT : IRC — Block Villa Subdivision 6 " Water Main Tie-In on 20`I' Avenue at 9 `'' Place COUNTY UTILITY PROJECT NO . : UCP # 2624 CONTRACTOR ' S PROJECT NO . : N/A You are directed to proceed promptly with the following work : Description : Install about 60 LF of 6 " HDPE Directional Drill water pipe across 20 `I' Avenue at 9t" Place nd tie into existing 6 " AC Pipe with Wet Tap Assembly with 6 " GV&B ; install 6 " GV &B on end . Purpose of Work Authorization Directive : The installation of the 6 " HDPE water main will allow the Contractor for the Block Villas Vater Assessment to complete his project Attachments : (List documents supporting work) Exhibit 1 Cost Estimate Method of determining Contract Price : ❑X Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Boa d of County Commissioners on February 15 , 2005 to The Danella Companies . ❑ Lump Sum ❑ Cost of the Work: The Cost of Labor, Contingency and Contract Time is summarized below : Estimated Labor Cost = $4 , 259 . 35 Estimated Contract 14 days Time : Total Estimated Labor Costs = $ 4 , 259 . 35 ACC TE RECOMMENDED : APPROVED : By : By : B DANELLA ENGINEER CIIAIRMA COMPANIES Date : � L _ l � - �`° S Date : Date : 01 - 03 - 06 Exhibit 2 C : ADOCUMG— I \NFIDUC- 1 \LOCALS -- tV'Temp\notcs6030 ' 8\— I934501 . doc A y Indian River County Department of Utilities COST ESTIMATE Project: IRC - Block Villa Subdivision 6" Water Main Tie-In on 20th Avenue at 9th Place by Directional Drill UCP #2624 8-Dec-05 Bid Item Estimated Unit of i Unit Total Labor Material Uait material Total Item No. Description uantit Measure Price Price price Price Price 63 Mobilization 1 0.04 $ 160.73 64 DemobilizationI 0.01 $40. 181 65 Maintenance of Traffic I 0.01 $40. 18 04b Install 6" HDPE Directional Drill Pie 60 LF 18 .00 $ 1 ,080.00 8 .90 $534 .00 Ole Install 6" PVC Water Main 20 LF 5.60 $ 112 .00 5,71 $ 114.20 12a Install 6" X 6" SS Wel Tap Assembly w/ 6" GV&B I EA 500.00 $500.00 1 ,053 .99 $ 1 ,053 .99 13b Tap 6" AC Main I EA 600.00 $600.00 17c Install 6" NRS Gale Valve I EA 250.00 $250.00 477 ,70 $477.70 $0.00 6 Fumish & Install DIP Fittings 0.25 TONS 1 ,665.00 $416.25 5,500.00 $ 1 ,375.00 $0.00 23 Potholes 2 EA 200.00 $400.00 $0.00 53 ROW Gradin 100 SY 1 .00 $ 100.00 56A Saw Cut, Remove and Dispose of Asphalt 2 Ton 25.00 $50.00 60 Limerock Base Replacement over Trench 10 SY 19.00 $ 190.00 10. 53 1 $ 105 .30 56c Install Asphaltic Cement 2 Ton00 00 160.00 $320.00 47.00 $9q, .3 Subtotal Water Facilities Labor $4,018 .25 Total Water Facilities Labor $4,259.35 Total Materials Total Labor and Materials Cost Estimate $8,013 .54 $3 ,754. 19 TOTAL ESTIMATED COST $8,013.54 Exhibit 1 Cmhacta's Bid Item List A y Indian River County Department of Utilities COST ESTIMATE Project: IRC - Block Villa Subdivision 6" Water Main Tie-In on 20th Avenue at 9th Place by Directional Drill UCP #2624 8-Dec-05 Bid Item Estimated Unit of i Unit Total Labor Material Uait material Total Item No. Description uantit Measure Price Price price Price Price 63 Mobilization 1 0.04 $ 160.73 64 DemobilizationI 0.01 $40. 181 65 Maintenance of Traffic I 0.01 $40. 18 04b Install 6" HDPE Directional Drill Pie 60 LF 18 .00 $ 1 ,080.00 8 .90 $534 .00 Ole Install 6" PVC Water Main 20 LF 5.60 $ 112 .00 5,71 $ 114.20 12a Install 6" X 6" SS Wel Tap Assembly w/ 6" GV&B I EA 500.00 $500.00 1 ,053 .99 $ 1 ,053 .99 13b Tap 6" AC Main I EA 600.00 $600.00 17c Install 6" NRS Gale Valve I EA 250.00 $250.00 477 ,70 $477.70 $0.00 6 Fumish & Install DIP Fittings 0.25 TONS 1 ,665.00 $416.25 5,500.00 $ 1 ,375.00 $0.00 23 Potholes 2 EA 200.00 $400.00 $0.00 53 ROW Gradin 100 SY 1 .00 $ 100.00 56A Saw Cut, Remove and Dispose of Asphalt 2 Ton 25.00 $50.00 60 Limerock Base Replacement over Trench 10 SY 19.00 $ 190.00 10. 53 1 $ 105 .30 56c Install Asphaltic Cement 2 Ton00 00 160.00 $320.00 47.00 $9q, .3 Subtotal Water Facilities Labor $4,018 .25 Total Water Facilities Labor $4,259.35 Total Materials Total Labor and Materials Cost Estimate $8,013 .54 $3 ,754. 19 TOTAL ESTIMATED COST $8,013.54 Exhibit 1 Cmhacta's Bid Item List WORK AUTHORIZATION DIRECTIVE No. 2005_0I7 )Ooi� - OOJY DEC 14 2005 IRC — BLACK VILLA WATER MAIN EXTENSION ON 201" ' AVENUE AT 9" ' PLACE DATE OF ISSUANCE: December 20, 2005 EFFECTIVE DATE : December 20 , 2005 OWNER: Indian River County CONTRACTOR: The Danella Companies Inc CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033 PROJECT : IRC — Block Villa Subdivision 6" Water Main Tie- In on 20°i Avenue at 9" Place COUNTY UTILITY PROJECT NO . : UCP # 2624 CONTRACTOR' S PROJECT NO . : N/A You are directed to proceed promptly with the following work: Description : Install about 60 L F of 6" FIDPE Directional Drill water pipe across 20°i Avenue at 91' Place and tie into existing 6" AC Pipe with Wct Tap Assembly with 6" GV&B ; install 6" GV&B on end . Puppose of Work Authorization Directive : The installation of (he 6" FIDPE water main will allow the Contractor for the Block Villas Water Assessment to complete his project Attachments : (List documents supporting work) Exhibit 1 Cost Estimate Method of determining Contract Price : Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County Commissioners on February 15 , 2005 to The Danella Companies . ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract. Time is summarized below: Estimated Labor Cost = $4,259 . 35 Estimated Contract 14 days Time : ..'R, Total Estimated Labor Costs = $4 , 259 . 35 ;v f ACC TE REC M",D : APPROVI D By: By. B DANELLA ENGINEER C1 IR COMPANIES r Date : IL -/ 2 -0 _S� Date : �2 �� Date : 01 '=03s06•, t ; o '% . . Exhibit 2 CADOCUM G— I ANFIDUC - I ALOCA LS— I vremp`,notcs6030C 8t- 1934501 .doc