HomeMy WebLinkAbout2006-004 WORK AUTHORIZATION DIRECTIVE
No. 2005_0I7 )Ooi� - OOJY DEC 14 2005
IRC — BLACK VILLA WATER MAIN EXTENSION ON 201" ' AVENUE AT 9" ' PLACE
DATE OF ISSUANCE: December 20, 2005 EFFECTIVE DATE : December 20 , 2005
OWNER: Indian River County
CONTRACTOR: The Danella Companies Inc
CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033
PROJECT : IRC — Block Villa Subdivision 6" Water Main Tie- In on 20°i Avenue at 9" Place
COUNTY UTILITY PROJECT NO . : UCP # 2624 CONTRACTOR' S PROJECT NO . : N/A
You are directed to proceed promptly with the following work:
Description :
Install about 60 L F of 6" FIDPE Directional Drill water pipe across 20°i Avenue at 91' Place and tie into
existing 6" AC Pipe with Wct Tap Assembly with 6" GV&B ; install 6" GV&B on end .
Puppose of Work Authorization Directive :
The installation of (he 6" FIDPE water main will allow the Contractor for the Block Villas Water
Assessment to complete his project
Attachments : (List documents supporting work)
Exhibit 1 Cost Estimate
Method of determining Contract Price :
Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County
Commissioners on February 15 , 2005 to The Danella Companies .
❑ Lump Sum
❑ Cost of the Work
The Cost of Labor, Contingency and Contract. Time is summarized below:
Estimated Labor Cost = $4,259 . 35 Estimated Contract 14 days
Time :
..'R,
Total Estimated Labor Costs = $4 , 259 . 35
;v f
ACC TE REC M",D : APPROVI D
By: By. B
DANELLA ENGINEER C1 IR
COMPANIES r
Date : IL -/ 2 -0 _S� Date : �2 �� Date : 01 '=03s06•, t ; o '% . .
Exhibit 2
CADOCUM G— I ANFIDUC - I ALOCA LS— I vremp`,notcs6030C 8t- 1934501 .doc
WORK AUTHORIZATION DIRECTIVE 13 - a (4 D
No . 2005-017
4 2005
fr
IRC — BLOCK VILLA WATER MAIN EXTENSION ON 20TH AVENUE AT 9TH (PLACE
DATE OF ISSUANCE : December 20 , 2005 EFFECTIVE DATE : December 20 , 2005
OWNER : Indian River Count
CONTRACTOR : The Danella Companies , Inc .
CONTRACT : WATER , SEWER AND RECLAIM WATER LINE REPLACEM=E=NT=/ EXT � NSIONS
AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033
PROJECT : IRC — Block Villa Subdivision 6 " Water Main Tie-In on 20`I' Avenue at 9 `'' Place
COUNTY UTILITY PROJECT NO . : UCP # 2624 CONTRACTOR ' S PROJECT NO . : N/A
You are directed to proceed promptly with the following work :
Description :
Install about 60 LF of 6 " HDPE Directional Drill water pipe across 20 `I' Avenue at 9t" Place nd tie into
existing 6 " AC Pipe with Wet Tap Assembly with 6 " GV&B ; install 6 " GV &B on end .
Purpose of Work Authorization Directive :
The installation of the 6 " HDPE water main will allow the Contractor for the Block Villas Vater
Assessment to complete his project
Attachments : (List documents supporting work)
Exhibit 1 Cost Estimate
Method of determining Contract Price :
❑X Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Boa d of County
Commissioners on February 15 , 2005 to The Danella Companies .
❑ Lump Sum
❑ Cost of the Work:
The Cost of Labor, Contingency and Contract Time is summarized below :
Estimated Labor Cost = $4 , 259 . 35 Estimated Contract 14 days
Time :
Total Estimated Labor Costs = $ 4 , 259 . 35
ACC TE RECOMMENDED : APPROVED :
By : By : B
DANELLA ENGINEER CIIAIRMA
COMPANIES
Date : � L _ l � - �`° S Date : Date : 01 - 03 - 06
Exhibit 2
C : ADOCUMG— I \NFIDUC- 1 \LOCALS -- tV'Temp\notcs6030 ' 8\— I934501 . doc
A
y
Indian River County Department of Utilities
COST ESTIMATE
Project: IRC - Block Villa Subdivision 6" Water Main Tie-In on 20th Avenue at 9th Place by Directional Drill
UCP #2624
8-Dec-05
Bid Item Estimated Unit of i Unit Total Labor Material Uait material Total
Item No. Description uantit Measure Price Price price Price Price
63 Mobilization 1 0.04 $ 160.73
64 DemobilizationI
0.01 $40. 181
65 Maintenance of Traffic I 0.01 $40. 18
04b Install 6" HDPE Directional Drill Pie 60 LF 18 .00 $ 1 ,080.00 8 .90 $534 .00
Ole Install 6" PVC Water Main 20 LF 5.60 $ 112 .00 5,71 $ 114.20
12a Install 6" X 6" SS Wel Tap Assembly w/ 6" GV&B I EA 500.00 $500.00 1 ,053 .99 $ 1 ,053 .99
13b Tap 6" AC Main I EA 600.00 $600.00
17c Install 6" NRS Gale Valve I EA 250.00 $250.00 477 ,70 $477.70
$0.00
6 Fumish & Install DIP Fittings 0.25 TONS 1 ,665.00 $416.25 5,500.00 $ 1 ,375.00
$0.00
23 Potholes 2 EA 200.00 $400.00
$0.00
53 ROW Gradin 100 SY 1 .00 $ 100.00
56A Saw Cut, Remove and Dispose of Asphalt 2 Ton
25.00 $50.00
60 Limerock Base Replacement over Trench 10 SY 19.00 $ 190.00
10. 53 1 $ 105 .30
56c Install Asphaltic Cement 2 Ton00
00
160.00 $320.00 47.00 $9q, .3
Subtotal Water Facilities Labor $4,018 .25
Total Water Facilities Labor $4,259.35
Total Materials
Total Labor and Materials Cost Estimate $8,013 .54 $3 ,754. 19
TOTAL ESTIMATED COST $8,013.54
Exhibit 1
Cmhacta's Bid Item List
A
y
Indian River County Department of Utilities
COST ESTIMATE
Project: IRC - Block Villa Subdivision 6" Water Main Tie-In on 20th Avenue at 9th Place by Directional Drill
UCP #2624
8-Dec-05
Bid Item Estimated Unit of i Unit Total Labor Material Uait material Total
Item No. Description uantit Measure Price Price price Price Price
63 Mobilization 1 0.04 $ 160.73
64 DemobilizationI
0.01 $40. 181
65 Maintenance of Traffic I 0.01 $40. 18
04b Install 6" HDPE Directional Drill Pie 60 LF 18 .00 $ 1 ,080.00 8 .90 $534 .00
Ole Install 6" PVC Water Main 20 LF 5.60 $ 112 .00 5,71 $ 114.20
12a Install 6" X 6" SS Wel Tap Assembly w/ 6" GV&B I EA 500.00 $500.00 1 ,053 .99 $ 1 ,053 .99
13b Tap 6" AC Main I EA 600.00 $600.00
17c Install 6" NRS Gale Valve I EA 250.00 $250.00 477 ,70 $477.70
$0.00
6 Fumish & Install DIP Fittings 0.25 TONS 1 ,665.00 $416.25 5,500.00 $ 1 ,375.00
$0.00
23 Potholes 2 EA 200.00 $400.00
$0.00
53 ROW Gradin 100 SY 1 .00 $ 100.00
56A Saw Cut, Remove and Dispose of Asphalt 2 Ton
25.00 $50.00
60 Limerock Base Replacement over Trench 10 SY 19.00 $ 190.00
10. 53 1 $ 105 .30
56c Install Asphaltic Cement 2 Ton00
00
160.00 $320.00 47.00 $9q, .3
Subtotal Water Facilities Labor $4,018 .25
Total Water Facilities Labor $4,259.35
Total Materials
Total Labor and Materials Cost Estimate $8,013 .54 $3 ,754. 19
TOTAL ESTIMATED COST $8,013.54
Exhibit 1
Cmhacta's Bid Item List
WORK AUTHORIZATION DIRECTIVE
No. 2005_0I7 )Ooi� - OOJY DEC 14 2005
IRC — BLACK VILLA WATER MAIN EXTENSION ON 201" ' AVENUE AT 9" ' PLACE
DATE OF ISSUANCE: December 20, 2005 EFFECTIVE DATE : December 20 , 2005
OWNER: Indian River County
CONTRACTOR: The Danella Companies Inc
CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033
PROJECT : IRC — Block Villa Subdivision 6" Water Main Tie- In on 20°i Avenue at 9" Place
COUNTY UTILITY PROJECT NO . : UCP # 2624 CONTRACTOR' S PROJECT NO . : N/A
You are directed to proceed promptly with the following work:
Description :
Install about 60 L F of 6" FIDPE Directional Drill water pipe across 20°i Avenue at 91' Place and tie into
existing 6" AC Pipe with Wct Tap Assembly with 6" GV&B ; install 6" GV&B on end .
Puppose of Work Authorization Directive :
The installation of (he 6" FIDPE water main will allow the Contractor for the Block Villas Water
Assessment to complete his project
Attachments : (List documents supporting work)
Exhibit 1 Cost Estimate
Method of determining Contract Price :
Unit Prices : Bid Items as established pursuant to Bid No . 7033 , and awarded by the Board of County
Commissioners on February 15 , 2005 to The Danella Companies .
❑ Lump Sum
❑ Cost of the Work
The Cost of Labor, Contingency and Contract. Time is summarized below:
Estimated Labor Cost = $4,259 . 35 Estimated Contract 14 days
Time :
..'R,
Total Estimated Labor Costs = $4 , 259 . 35
;v f
ACC TE REC M",D : APPROVI D
By: By. B
DANELLA ENGINEER C1 IR
COMPANIES r
Date : IL -/ 2 -0 _S� Date : �2 �� Date : 01 '=03s06•, t ; o '% . .
Exhibit 2