HomeMy WebLinkAbout2003-213 L CHANGE ORDER NO . 001 O 3 , a l S DATE OF ISSUANCE : August 19 , 2003 EFFECTIVE DATE : August 19 , 2003 OWNER : Indian River County CONTRACTOR : DICKERSON FLORIDA , INC . Project : EAST GIFFORD STORMWATER IMPROVEMENTS OWNER's Project No . 9219 OWNER/ENGINEER : Indian River County You are directed to make the following changes in the Contract Documents : 1 . Description : Add two Type " E " Inlets . Reason : To adjust elliptical pipe route (along U . S . Highway No . 1 ) to avoid conflicts with power poles and an existing water main . The change in Contract Price is determined as follows : ADDITION to the Contract Price = (2 Type " E " Inlets ) ($ 2 , 200 per Inlet) = $4, 400 . 00 2 . Description : Additional labor to modify two Type " E " Inlets on site . Reason : Inlets required modification due to adjustment of elliptical pipe route (along U . S . Highway No . 1 ) to avoid conflicts with power poles and an existing water main . The change in Contract Price is determined as follows : ADDITION to the Contract Price = $ 990 3 . Description : Construct thrust blocks for an existing water main . Reason : To protect an existing water main against resultant thrust from internal pipeline pressure in order to allow the installation of a drainage structure near the water main . The water main must be exposed in order to install the drainage structure and the thrust blocks will prevent the water main ' s internal pressure from blowing the fittings or pipe sections from the pipeline . The change in Contract Price is determined as follows : ADDITION to the Contract Price = $ 3 , 307 . 70 ADDITION to the Contract Time = 2 calendar days 4 . Description : Remove and replace an existing 15-inch corrugated metal pipe ( CMP ) at an existing drainage structure . Reason : Since the construction drawings were prepared , a new pipe was added ( by others ) to an existing drainage structure that the Contractor must connect to as part of this project . This pipe must be removed to allow the Contractor to perform its work and then the Contractor must reinstall the pipe . The change in Contract Price is determined as follows : ADDITION to the Contract Price = $ 621 . 50 Change Order #001 Change Order - 1 R\Public WorksWeithM\Stormwater Projects\Gifford East\Change Orders\Change Order #001 .doc Last revised 9/27/01 Attachments : ( List documents supporting change ) 1 . See attached Change Order Requests from Derrico Construction Corporation (subcontractor to Dickerson Florida , Inc . ) CHANGE IN CONTRACT PRICE : Description Amount Original Contract Price $ 688 , 853 . 56 Net Increase ( Decrease ) from previous $-0 - Chan a Orders No . N/A to N/A : Contract Price prior to this Change Order: $ 688 , 853 . 56 Net increase of this Change Order: $ 99319 . 20 Contract Price with all approved Change $ 6981172 . 76 Orders : CHANGE IN CONTRACT TIMES Description Time Original Contract Time ( Final Completion ) December 21 , 2003 180 calendar days ) Net change from previous Change Orders No . N/A to N/A : -0- days Contract Time prior to this Change Order: 180 calendar days Net increase decrease this Change Order: 2 calendar days Contract Time with all approved Change December 23 , 2003 Orders : 180 calendar da s ACCEPT D : RECOMMENDED : APPRO D : By: By: B r 6"4 CO RACTORignatt� re ) E ( NEER (Signature) ER ( nature ) �Z4r � l (S Keith McCully, P . E . , Indian Kenneth R . Macht, Chairman , River County Stormwater Board of County Commissioners /Y Engineer (N me and Title) Date : !j d ' Date : Sf 13 2043 Date : August 19 , 2003 Indian River County Approved Date Administration fie q/& Budget $ Co . Attorney Risk Management Department _ t , _ G: Division Change Order #001 Change Order - 2 FAPublic Works\KeithM\Stormwater Projects\Gifford East\Change Orders\Change Order #001 .doc Last revised 9/27/01