HomeMy WebLinkAbout2008-156 • 5 _ � 0 - 0�
Page 1 of 2
Board of County Commissioners 8 C
180127th Street
Vero Beach, Florida 32960-3388
Telephone: (772) 567-8000 FAX: (772)-778-9391
Asphalt Coring Services
for
Eagle Trace Subdivision-Phase 2
IRC Project No . 0813
WORK ORDER NO. 4 ( Engineering Division )
FOR PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT
FOR ANNUAL GEOTECHNICAL SERVICES CONTRACT NO . 0534
WITH
DUNKELBERGER ENGINEERING & TESTING , INC .
All services performed under this contract shall be supervised and certified by a licensed
Professional Engineer (PE) registered with the State of Florida and staff employed directly with
your firm .
Scope of Services
All work shall be performed on a unit price basis in accordance with the attached Scope of
Services dated May 7 , 2008 and shall comply with Standards enumerated in the RENEWAL OF
THE ANNUAL GEOTECHNICAL SERVICES CONTRACT IRC PROJECT NO. 0534 WITH
DUNKELBERGER EGINEERING & TESTING INC . Effective Date: October 1 , 2007.
Minimum Specification Requirements as follows :
Asphalt Coring Services
• Coring of the asphalt at twenty seven (27) locations as directed by Indian River County
and spaced at about 100 foot intervals within the subject roadways to determine asphalt
thickness.
• Preparation of a brief engineering data report documenting the findings of this work.
All work shall also comply with the current Florida Minimum Technical Standards.
COMPENSATION .
The COUNTY agrees to pay, and the Geotechnical Professional agrees to accept, a fee for
services rendered according to the "Scope of Services" identified in the attached exhibit in a
Not-to-Exceed Amount of $2 , 500 . 00.
C:\Documents and Settings\kimberlyr\Local Settingffemporary Intemet Files\OLKE 1\0534 BCC Agenda WO# 4 Dunkelberger 5-7-2008.doc
Page 2 of 2
WO# 4
EAGLR TRACE SUBDIVISION -PHASE 2
IRC Project No. 0813
TIME FOR COMPLETION
This Work Order No. 4 shall be completed within 180 days from the execution of this
Agreement .
IN WITNESS HEREOF the parties hereto have executed these presents
this 20th day of %y , 2008.
OWNER` ` '` .
DUNKELBERGER ENGINEERING & TESTING,
BOARD OF COUNTYCORMStONERS INC.
INDIAN RIVER COUNTY, $RIDA
r , _
F
(Si&. tore) 'ty� : < \ (Si lature)
'Stiitdr L. BowAn Y'�taie nn- Cr g E. Dunkelberger, P.E. , Vice President
(Prititeq danje and tilMt (Printed name and title)
,
Approved.by` B(rL', > • + Ma 20 , 2008
ATTEST: IAARRnlbert's Jeffrey K. Barton, Clerk of Circuit Court Witnessed by: imberly
Deputy Cl r (Printed name)
/ A roe to Form d Le uff ' cy:
I ^� . William G. Collfing II, tounty Attorney
oseph A Baird, County Administrator
C:\Documents and Settingslimberlyr\Local Settings\Temporary Internet Filesl0LKE1 \0534 BCC Agenda W04 4 Dunkelberger 5-7-2008
(2).doc
' 1KE _7
j g
Indian IZtverCounty May L 2008
180 ; 27' r Street PI ec, No . PSL - 0"I-2>j8 , 1t)3 )
Vero Beach . Florida ; 2960
Attention : Mr. Jack Jolly, P .E . . . . vin e-encu/ (jo11p(uircgor. cam)
Suirect : Brut;etEstirnate — AsphaitCorirrgServices
Eagle Trace Subdivision — Phase 2 (Wort; Order No. 4)
Indian River County, Florida
Dear Mr. Jolly:
As requested iii, the letter issued by -Mr. Chris Kafer on April 22 , 2005 , Dunkelberoer
Engineering & Testing, Inc . (Dunkelberger) is pleased to provide this proposal for Asphalt
COringServices for the above referenced project .
The Eagie Trace Subdivision is located at the northeast corner of 6i " Street and 58 °i Street
(Kings Highway) in Vero Beach, Indian River County, Florida . Reportedly , several areas of
pavement deficiencies have been noted within the 2600 lineal feet of Project roadway. As a
result, Dunkelberger was reclucsted to perform a limited pavement evaluation to determine
asphalt ihjclatess at I00 foot intervals.
We will provide mobile eornigequipment and a fvvo-man coring crew for 2 clays to perform the
field work . Our scope of svorl, Will inclucle the following :
Pavement Cores
1 . Coring of the asphalt at twenty seven (27) locations as directed by Indian River County
and spaced at about 100 foot intervals within the subject roadways toct
thickness . ern-rine asphalt
2 . Preparation of a brief engineerina data report doetunenting our findings .
Tenn.s and Payment
We propose to bill this work on a unit rate basis in accordance with our current 2007-2008
Contijmh g Geoieclvriccrl Services Conn cret (IRC Project )%ro. 0534) . We understand this �,vorl:
will be performed under a purchase order number issued by htdian River County .
Based on the described scope of wort., we have provided an Estimated Scope and Budge+
(Attachment A) for the requested services and estab '-ished an estimated budget o/' 52, 500.
Attachment B is our Prgjecr Doicr Sheel.
607 NW C0111InOdlty Cove, Port St. Lude, Florida 3=1986 0 (77/ 2) 343-9787 0 Fax (772) 343-9404
Indiai. Rivet Coun( y — Eaule Trace Subdivision
Project No . PSL- 07-2555 0 0 . 3 ) P�^.ne 2
o0o
Dunkelbereer appreciates the oppoltouit, to sub:r.' t this proposal and Inv}s forvvtn'd to renderuig
he services deseribee! hereino e sure proper cl .stribution of our tes1 repoirs, please complete
t:'te Pro%ec1 Drvn Shce1 and rettrn it to o;nPort St . Lucie ofzlee . Should you hate any questions
concerning the contents of this proposal, please feel free to cal , ns an) iInc .
Shouid you have any questions concerning the contents, please feel free to call either of the
ande_signed.
Very truly yours.
DUNKELBERGER ENGINEERING & TESTING, INC.
J
David TcYotn �strorn !
� )•�" fief-. _ .
Kimberly Roberts
Project Manager /
- 1
Senior Project Manafei '
DTTJKAR ✓i
2555 ( 10.3).phr - i l'
cc : Chris Kafer, P .E- . : tudiau River Coantv . . . ( 1 ) vin e-mail (ckafer airesov.com)
Attachments : A — Estimated Scope and Budget
B — Project Data Shtei
kUNWE(L1BffVG11=4R
ESTIMATED SCOPE AND BUDGET Attachment A
Asphalt Coring and Testing Services
Eagle Trace Subdivision - Phase 2
Indian River County, Florida
Project Name: Eagle Trace Subdivision - Phase 2 Dunkelberger Engineering & Testing, Inc.
Client: Indian River County Attn: Jack Jolly, PE 607 NW Commodity Cove '
DE&T Project ft: PSL-07-2558 (10.3) Port SI. Lucie, Florida 33986
Date: May 5, 21708 (772) 343 .9787 FAX (772) 343-9404 Contact: David T. YoungstLam
Contract Amount Previousl Completed Completed This Invoice _ Com_ pleted to Uale_ Remaining on Contract
Itemized Services Qty Unit Price Amaunt Qty Amount qty Amount Qt Amount
Field Testing Y Qty Amount
Pavement Coring --
Equipment Usage 2 de $115.00[f;$2300.0000 0 $0-0y U —Two-man Coring Crew' (1-wo days) 16 hour $110 00 76n rano�U —
9 $0 09 27 $230.00
$4947 _. — 11(_$ 1 ,760.00
"Includes coring asphalt at twenty-seven (27) locations for asphalt thickness determinations.
Subtotal $1 ,990,00
Laboratory Testi ng $0'00 $0,00 $O.pA $ 1 ,990.00
I
Asphalt Extraction/Gradation 9 test $135-.90 $0007 B�
Percent Fines (FM 1-T 011 ) tesE $ 490
Subtotal
Engineering & Rporting $0:00 50-08 $0,00 50,00 $0.001
Principal Engineer 1 hour $145.00 $145.00 _ B $0-00 8 — $0.90 0 $0-00 1 _ __ $ 145A0
Project Engineer/Manager 3 hour $95.00 $285 00 090 U $0-00—� gr—gggU 3
Clerical/Word Processing 2 � hour $4000 $80.00 8 .. 3—$285. 00 -
-7 -01-IWA0 0 — 21 ---- $80_00:
Subtotal $510.00
L.
Total Budget Estimate $2,SU0.00 ¢0:98 $0.99
$0:00 $2, 500.00
2558 ( 10. 3) .core est