HomeMy WebLinkAbout2008-401HIVICIVVIVICIV I NO. 7 1 U WORK ORDER NUMBER 3 -EM
SUPPORT ENGINEERING SERVICES FOR EGRET MARSH REGIONAL
STORMWA TER PARK FINAL REDESIGN AND CONSTRUCTION
This Amendment No. 1 to Work Order Number 3 -EM is entered into as of this 9th
day of December 2008, pursuant to that certain Continuing Contract Agreement for
Professional Services entered into as of March 15, 2005 ("Agreement"), by and between
Indian River County, a political subdivision of the State of Florida ("COUNTY") and
Malcolm Pirnie, Inc. ("CONSULTANT").
The COUNTY has selected the CONSULTANT to perform the professional services
set forth on Attachment 1, attached to this Work Order and made part hereof by this
reference. The professional services will be performed by the CONSULTANT for the fee
schedule set forth in Attachment 2, attached to this Work Order and made a part hereof by
this reference. The CONSULTANT will perform the professional services within the
timeframe more particularly set forth in Attachment 3, attached to this Work Order and
made a part hereof by this reference, all in accordance with the terms and provisions set
forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in
any Work Order shall conflict with the terms of the Agreement and the terms of the
Agreement shall be deemed to be incorporated in each individual Work Order as if fully set
forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of
the date first written above.
CONSULT
MALCOLM
ANT BOARD OF COUNTY COMMISSIONERS
PIRNIE, INC. OF INDIAN RIVER COUNTY
Wesley S. Davis, Chairman
Attest: Mary Louise Scheidt, Clerk, Ad Interim
By=-�
Deputy Clerk
proved:
A.113aird, County Administrator
'd as to form �d legal sufficiency:
Marian E. FelV,Assistanta
unty Attorney
1
M:\OPROP\2008\Indian River County\Egret Marsh EM -3 Amendment#1\Malcolm Pirnie Work Order #3 -EM - AMENDMENT No. 1.docx
�
Y
r
HIVICIVVIVICIV I NO. 7 1 U WORK ORDER NUMBER 3 -EM
SUPPORT ENGINEERING SERVICES FOR EGRET MARSH REGIONAL
STORMWA TER PARK FINAL REDESIGN AND CONSTRUCTION
This Amendment No. 1 to Work Order Number 3 -EM is entered into as of this 9th
day of December 2008, pursuant to that certain Continuing Contract Agreement for
Professional Services entered into as of March 15, 2005 ("Agreement"), by and between
Indian River County, a political subdivision of the State of Florida ("COUNTY") and
Malcolm Pirnie, Inc. ("CONSULTANT").
The COUNTY has selected the CONSULTANT to perform the professional services
set forth on Attachment 1, attached to this Work Order and made part hereof by this
reference. The professional services will be performed by the CONSULTANT for the fee
schedule set forth in Attachment 2, attached to this Work Order and made a part hereof by
this reference. The CONSULTANT will perform the professional services within the
timeframe more particularly set forth in Attachment 3, attached to this Work Order and
made a part hereof by this reference, all in accordance with the terms and provisions set
forth in the Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in
any Work Order shall conflict with the terms of the Agreement and the terms of the
Agreement shall be deemed to be incorporated in each individual Work Order as if fully set
forth herein.
IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of
the date first written above.
CONSULT
MALCOLM
ANT BOARD OF COUNTY COMMISSIONERS
PIRNIE, INC. OF INDIAN RIVER COUNTY
Wesley S. Davis, Chairman
Attest: Mary Louise Scheidt, Clerk, Ad Interim
By=-�
Deputy Clerk
proved:
A.113aird, County Administrator
'd as to form �d legal sufficiency:
Marian E. FelV,Assistanta
unty Attorney
1
M:\OPROP\2008\Indian River County\Egret Marsh EM -3 Amendment#1\Malcolm Pirnie Work Order #3 -EM - AMENDMENT No. 1.docx
ONSITE ELECTRICAL AND STRUCTURAL ENGINEERING SERVICES
DURING CONSTRUCTION
in PROJECT SCOPE
The COUNTY intends to begin construction of the Egret Marsh Regional Stormwater Park
(Egret Marsh) in the fall of 2008. The CONSULTANT shall provide onsite electrical and
structural engineering inspections as required. Specific tasks follow:
2.
Task No. 1 — ELECTRICAL AND STRUCTURAL ENGINEERING SITE VISITS DURING
CONSTRUCTION AND ASSOCIATED MEMOS — conduct up to four electrical
engineering site visits and up to four structural engineering site visits to the project
construction site to observe and review project construction activities as relates to
electrical and structural issues. One electrical engineering site visit will include project
startup. Prepare and submit to the COUNTY, a memo and photographs summarizing
observations made during each site visit.
The electrical Work included herein is only for electrical and control systems related
to the site lighting, the three precast buildings, the offsite pumping station at the Lateral D
Canal, and the pump station located near the Final Polishing Pond.
The structural Work included herein is only for structural items related to the offsite
pumping station at the Lateral D Canal.
**END OF ATTACHMENT 1 **
2
M:\OPROP\2008\Indian River County\Egret Marsh EM -3 Amendment#1\Malcolm Pirnie Work Order #3 -EM - AMENDMENT No. i .docx
ATTACHMENT 2 to AMENDMENT No. 1 TO WORK ORDER NO, XEM
ONSITE ELECTRICAL AND STRUCTURAL ENGINEERING SERVICES
DURING CONSTRUCTION
1. COMPENSATION
The COUNTY agrees to pay and the CONSULTANT agrees to accept, a not -to -exceed fee
of $17,810.00 for services rendered according to Attachment 1 of this WORK ORDER.
2. PARTIAL PAYMENTS
The COUNTY shall make monthly partial payments to the CONSULTANT for all
authorized work pertaining directly to this project performed during the previous calendar
month. The CONSULTANT shall submit invoices monthly for services performed and
expenses incurred pursuant to this Agreement during the prior month.
The CONSULTANT shall submit duly certified invoices in duplicate to the Director of
the Public Works Department. For lump sum line items, the amount submitted shall be the
prorated amount due for all work performed to date under this phase, determined by
applying the percentage of the work completed as certified by the CONSULTANT, to the
total due for this phase of the work. For time and material line items, the amount
submitted shall be based on the actual hours worked and expenses incurred for the billing
period.
The amount of the partial payment due the CONSULTANT for the work performed
to date under these phases shall be an amount calculated in accordance with the previous
paragraph, less ten percent (10%) of the invoice amount thus determined, which shall be
withheld by the COUNTY as retainage, and less previous payments. Per F.S. 218.74(2),
the COUNTY will pay approved invoices on or before the forty-fifth day after the COUNTY
receives the CONSULTANT's invoice.
Per F.S. 218.74(2), the ten percent (10%) retainage withheld shall be paid in full to
the CONSULTANT by the COUNTY, on or before the forty-fifth day after the date of final
acceptance of the Work by the Public Works Director.
**END OF ATTACHMENT 2**
3
F:\Public Works\KeithM\Stormwater Projects\Egret Marsh - REVISED\Work Orders\Malcolm Pirnie\Malcolm Pirnie Work Order #3 -EM -
AMENDMENT No. 1.docx
ATTACH
K
- -•-•
ONSITE ELECTRICAL AND STRUCTURAL ENGINEERING SERVICES
DURING CONSTRUCTION
1. TIME FOR COMPLETION
The CONSULTANT's time -of -completion for the services covered by this Work
Order depends on the Construction Contractor's progress. The CONSULTANT shall
promptly visit the site when requested to do so by the ENGINEER. The construction
schedule is anticipated to range from 300 to 360 calendar days.
**END OF ATTACHMENT 3**
4
M:\OPROP\2008\Indian River County\Egret Marsh EM -3 Amendment#1\Malcolm Pirnie Work Order #3 -EM - AMENDMENT No. i.docx
September 18, 2008
Mr. Victor A. Hulbert, P.E.
Malcolm Pirnie, Inc
2301 Maitland Center Parkway, Suite 245
Maitland, Florida 32751
Re: Egret Marsh Pump Station
Indian River County, Florida
Dear Mr. Hulbert:
We are pleased to submit our proposal for general services during construction for the above project based
on our recent redesign efforts as defined in our proposal dated January 17, 2008. This proposal is being
sent as a supplement to our original Subcontract dated June 21, 2006. Our scope shall include the
construction services for the above reference project as described in Part 2 of our original contract sent to
your office on May 25, 2006.
Attached is the original subcontract agreement for your reference. Our fee for this work shall be
$1,900.00, and shall be billed monthly based on project completion.
Very truly yours,
r'
0 .000
E. Bailey, P.E.
Enclosure
cc: Mr. John P. Markham, BEC
File
ACCEPTED
MP-08-002G.doc
ATE
4733 W. ATLANTIC AVENUE, SUITE 12-C, DELRAY BEACH, FLORIDA 33445
TEL: (561) 819-0488 FAX: (561) 819-5557 WEB: www.baileyengineering.com
SOUTHEAST STRUCTURAL ENGINEERS, INC.
Consulting Engineers
PO Box 560027
Orlando, FL 3256-0027
(407) 857-5559
October 23, 2008
Mr. Victor A. Hurlburt, P.E.
Malcolm Pirnie, Inc.
2301 Maitland Center Parkway, Suite 425
Maitland, FL 32751
Re: Proposal for Construction Administration Services
Egret Marsh Stormwater Park and Lateral D Pump Station
Dear Mr. Hurlburt:
Southeast Structural Engineers, Inc. is pleased to present this proposal for engineering services.
The scope of our work is outlined below:
Description of Service
Provide construction phase services including: shop drawing reviews, problem resolution
during construction and site visits to observe the progress and general conformity of the
construction with the structural drawings and specifications.
Fee Compensation
The compensation for our service will be billed monthly and will not exceed $15,910.00. This
estimated fee is comprised of the following:
Shop Drawing Reviews $41260.00
Problem Resolutions, RFI's and RFV's $800.00
Site Visits (12 visits at $800.00 per visit) $105850.00
Southeast Structural Engineers appreciates this opportunity to provide our service. If you have
any questions, please call.
Sincerely,
Roger A. Barth, P.E.
Principal