Loading...
HomeMy WebLinkAbout2003-011 WORK AUTHORIZATION DIRECTIVE � No. 2001-036 03-0// 63rd AVENUE FROM 4TH STREET TO 8T" STREET WATER MAIN RELOCATION PROJECT DATE OF ISSUANCE: December 11, 2002 EFFECTIVE DATE January 15, 2003 OWNER: Indian River County CONTRACTOR: George E French CONTRACT:WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT/EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT UCP#909 BID NO. 3032 PROJECT: 63`d AVENUE FROM 4TH STREET to 8`h STREET WATER MAIN ADJUSTMENT COUNTY UTILITY PROJECT NO.: UCP#2244 CONTRACTOR'S PROJECT NO.:N/A COUNTY W.I.P.No. 471-169000-02532 You are directed to proceed promptly with the following work: Description: Replace 8"above ground canal crossing at 8h Street with 8"HDPE subaqueous crossing, relocate five fire hydrants, relocate five water services/meters, lower water main to avoid conflict with proposed 18"RCP culvert, raise all valve boxes. Purpose of Work Authorization Directive: The construction will eliminate conflicts with paving and drainage improvements proposed by the Road& Bridge Division. Attachments: (List documents supporting work) Attachment A Exhibit showing location of work Method of determining Contract Price: !] Unit Prices: Bid Items as established pursuant to Bid No. 3032,and awarded by the Board of County Commissioners on January 7, 2001 to George E. French ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below: Estimated Labor Cost= $24,707.45 Estimated Contract Time: 30 days Contingency at 10%= $ 2,470.75 Total Estimated Labor Costs= $27,178.20 ACC TED: RE MNWNDT6 f r ROVED*. B !'' By: CO RACTOR ENGINE DIRECTOR Date: /02 -/8= z� Date: /2'- -<` ' 'C' Date: APPROVED: APP VE Br- Indian R er Co. Approved Date By. ASSIST. DIRECTOR CO WTY, CHALRMAN ,ldministrstition Date: Date: 01-14-2003 l`tilitic � � ilu d k e t -ties\ N INEERING\Projects-Utility Constriction Permits\IRC-63rd Ave.from 4th St.to 8th St.Water Main — Adjustments\Work Authorization No.2001-036.doc9 LeRui 15l� �11ai1til tsr Attachment 3