HomeMy WebLinkAbout2003-011 WORK AUTHORIZATION DIRECTIVE
� No. 2001-036
03-0//
63rd AVENUE FROM 4TH STREET TO 8T" STREET WATER MAIN RELOCATION PROJECT
DATE OF ISSUANCE: December 11, 2002 EFFECTIVE DATE January 15, 2003
OWNER: Indian River County
CONTRACTOR: George E French
CONTRACT:WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT/EXTENSIONS
AND MISCELLANEOUS LABOR CONTRACT UCP#909 BID NO. 3032
PROJECT: 63`d AVENUE FROM 4TH STREET to 8`h STREET WATER MAIN ADJUSTMENT
COUNTY UTILITY PROJECT NO.: UCP#2244 CONTRACTOR'S PROJECT NO.:N/A
COUNTY W.I.P.No. 471-169000-02532
You are directed to proceed promptly with the following work:
Description:
Replace 8"above ground canal crossing at 8h Street with 8"HDPE subaqueous crossing, relocate five fire
hydrants, relocate five water services/meters, lower water main to avoid conflict with proposed 18"RCP
culvert, raise all valve boxes.
Purpose of Work Authorization Directive:
The construction will eliminate conflicts with paving and drainage improvements proposed by the Road&
Bridge Division.
Attachments: (List documents supporting work)
Attachment A Exhibit showing location of work
Method of determining Contract Price:
!] Unit Prices: Bid Items as established pursuant to Bid No. 3032,and awarded by the Board of County
Commissioners on January 7, 2001 to George E. French
❑ Lump Sum
❑ Cost of the Work
The Cost of Labor, Contingency and Contract Time is summarized below:
Estimated Labor Cost= $24,707.45 Estimated Contract Time: 30 days
Contingency at 10%= $ 2,470.75
Total Estimated Labor Costs= $27,178.20
ACC TED: RE MNWNDT6 f r ROVED*.
B !'' By:
CO RACTOR ENGINE DIRECTOR
Date: /02 -/8= z� Date: /2'- -<` ' 'C' Date:
APPROVED: APP VE
Br-
Indian R er Co. Approved Date By.
ASSIST. DIRECTOR CO WTY, CHALRMAN
,ldministrstition Date: Date: 01-14-2003
l`tilitic � �
ilu d k e t -ties\ N INEERING\Projects-Utility Constriction Permits\IRC-63rd Ave.from 4th St.to 8th St.Water Main
— Adjustments\Work Authorization No.2001-036.doc9
LeRui
15l� �11ai1til tsr Attachment 3