Loading...
HomeMy WebLinkAbout2004-272 WORK AUTHORIZATION DIRECTIVE No. 2001400 Galvanized Water Main and Services Replacement Project �� ( 17TH Avenue s/o 8" Street DATE OF ISSUANCE : November, 2004 EFFECTIVE DATE : November, 2004 OWNER: Indian River County CONTRACTOR: GeoWe E. French CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT UCP #909 BID NO , 3032, RENEWED JAN, 1 2004 PROJECT: Replace about 500 LF of 2" Galvanized Water Main on 17'' Avenues/o 8`h St COUNTY UTILITY PROJECT NO. : UCP #2433 CONTRACTOR' S PROJECT NO. : N/A COUNTY ACCOUNT No. 471 - 169000-, WM R&R Maintenance Fund You are directed to proceed promptly with the following work: Description: Replace about 500 LF of 2" galvanized main with 2" PVC main, 7 galvanized services and 7 meters and boxes Purpose of Work Authorization Directive: The replacement of the galvanized main will eliminate emergency repairs and increase pressure and flow to the customers Attachments : N/A Method of determining Contract Price : ® Unit Prices : Bid Items as established pursuant to Bid No. 3032 , and awarded by the Board of County Commissioners on January 7, 2001 to Underground Utilities; Renewed January 1 , 2004 O Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below: Estimated Labor Cost = $ 15,554 .45 Estimated Contract Time: 30 days 10% Allowance = $ 1 ,555 .45 Total Estimated Labor Costs= $ 17, 109 . 90 ACCEPTF: RE D: APPROVED; s B ' Z By: < I ( J George rench, Labor ContractorLLL Gordon E . S ks, P.E. Cdr01 111L' D . � G i nn > C , N Underground Utilities, Inc. Enviro ntal Engineer Date: 11 - 02 - 2004 Date: Date : Zv Zro� pAPPI� - CAVED AS 10 C7R1CA AND L UFF BY MAFir' AN SSISTANT C; OU v Attach ent J ATTORN F:\Utilities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - 17th Avenue Water Main and Services Replacement UCP #2433\Work Authorization No. 2001 - 100, Attachment 2. doc9 s 2' Indian River County Department of Utilities FFProject: 17th STIMATE and CONTRACTOR' S BID ITEM LIST enue s/o 8th St. Water Main and Services Replacement Project 433 , WIP # 471 - 169000- Date: October 22, 2004 LABOR COSTS MATERIAL COSTS Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material Item No. Descri tion uantit Measure Price Price Price Price 63 Mobilization 1 5% 688.25 64 Demobilization 1 3% 412.95 65 Maintenance of Traffic l 5 % 688 .25 Ola Install 3 " PVC Sleeve 200 LP $6.00 1 ,200.00 0 , 85 $ 170.00 Olc Install 2 " PVC Water Main 500 LF $6.00 3 ,000.00 1 . 50 $750. 00 06 Make Connection to Existing Main 2 EA $380.00 760.00 752 . 51 $ 1 ,505 .02 12a Install I " PE Water Service 80 LF $ 10.00 800 .00 0 .98 $ 78 .40 126 Install 1112 " PE Water Service 150 LF $ 10.00 1 ,500.00 2 .64 $ 396.00 13c 2- inch Gate Valve 2 EA $ 100.00 200.00 377.24 $754.48 20 Potholes 5 EA $ 100.00 500.00 19 Remove & Replace Meter Box & Tie Into Meter 7 EA $ 125 .00 875 .00 59.00 22a Replace Existing Meter $413 .00 7 EA $50.00 350.00 $68 .03 $476. 21 24 Obtain Bact. Sample 2 EA $40.00 80.00 39 ROW grading 500 Sy $3 .00 1 ,500.00 60b Sod and topsoil 500 Sy $6.00 31000.00 $2.50 $ 1 ,250.00 Subtotal Water System Labor 13 ,765 .00 Subtotal Water System Labor, Mob. , Demob. , MOT, Materials, & Permitting 159554.45 IRCDUS Contingency Account I Allowance 10% 1 ,555 .45 SubTotal Labor Cost 17,109.90 Subtotal Material Costs $59793. 11 TOTAL PROJECT COST $229903.01 Attachment 1