Loading...
HomeMy WebLinkAbout2003-064 WORK AUTHORIZATION DIRECTIVE No . 2001 -056 38th LANE e/o US 1 - WATER MAIN CONFLICT PROJECT DATE OF ISSUANCE : March 4 , 2003 EFFECTIVE DATE March 4, 2003 OWNER: Indian River County CONTRACTOR: George E . French CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT UCP #909 BID NO . 3032 PROJECT38th Lane Conflict with New Storm Sewers - WATER MAIN ADJUSTMENT COUNTY UTILITY PROJECT NO . : UCP #2285 CONTRACTOR ' S PROJECT NO . : N/A COUNTY W. I.P . No . 472 — You are directed to proceed promptly with the following work: Description : Resolve conflicts of existing 3 " water main and water services with new storm sewers being constructed by the Road & Bridge Division Purpose of Work Authorization Directive : The construction will eliminate conflicts drainage improvements under construction by the Road & Bridge Division . Attachments : (List documents supporting work) Attachment A Exhibit showing location of work Method of determining Contract Price : 0 Unit Prices : Bid Items as established pursuant to Bid No . 3032 , and awarded by the Board of County Commissioners on January 7 , 2001 to George E . French ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below: - Estimated Labor Cost = $41401 . 35 Estimated Contract 30 days Contingent at 10% = $ 440 . 14 Time : Total Estimated Labor Costs = $49841 . 49 ACC ED : REC MME AP ROVED B r By ON CTOR ( ENGINE UTIL,I Y DIRECTOR Date : e?_ _ Date : 03 Date : p APPRO D : APP ED : By : By - ASSDIRE OR UNTY, C A AN Date : 3 51 b Date : 03 - 11 - 2003 F:\Utilities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - 38th Lane Water Conflict east of US I \Work Authorization No. 2001 -036.doc9 Indian River County Department of Utilities COST Project: IRC - 38th Lane East of US 1 Water Conflict with Storm Sewer Construction ESTIMATE UCP #2285 4-Mar-03 Bid Item Estimated Unit of Unit Total Labor Item No Desert tion Material Unit t Measure Material Total uantiPrice Price Price Price Price 63 Mobilization 1 64 Demobilization 0.05 194.75 1 0.03 65 Maintenance ofTraffic 116.85 1 0.05 194.75 la Install 3" PVC Water Main 60 LF Ila Install 1 " Water Service Line 6.00 360.00 0.50 30.00 50 LF 10.00 500.00 OSa Furnish & Install DIP Fittin s 0 25 0.26 13.00 19 Remove & Replace Meter Box and Tie into Meter 4 TONS 19500.00 375.00 5,500.00 1 ,375.00 20 Potholes EA 125.00 500.00 4.00 ( 00.00 400.00 38 ROW Gradin Y EA 100.00 400.00 6 40.00 SY 6.00 240.00 Make Connection to Existin Main 4.00 EA 380.00 1 ,520.00 Subtotal Water Facilities 3,895.00 Total Water Facilities Total Materials 4,401 .35 IRCDUS Force Account 1 1 ,818.00 Total Labor 4,841 .49 TOTAL ESTIMATED COST 6,659.49 CmITXWs Bid II List