HomeMy WebLinkAbout2003-095 jr WORK AUTHORIZATION DIRECTIVE f No . 2001 -060 Q `� 34th AVE . SW — 35T" AVE . SW GROVENOR ESTATES SUBDIVISION UTILITY RELOCATION PROJECT DATE OF ISSUANCE : April 23 , 2003 EFFECTIVE DATE April 23 , 2003 OWNER : Indian River County CONTRACTOR: George E . French CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS AND MISCELLANEOUS LABOR CONTRACT UCP #909 BID NO . 3032 PROJECT : 34"' Ave . 35th Ave SW Grovenor Estates Subdivision Utility Relocation Project COUNTY UTILITY PROJECT NO . : UCP #2293 CONTRACTOR ' S PROJECT NO . : N/A COUNTY W . I.P . No . 471 - 169000 You are directed to proceed promptly with the following work: Description: Resolve utility conflicts with proposed drainage and paving improvements prior to Road & Bridge commencing construction in the subdivision (C .P . #9918) Purpose of Work Authorization Directive : To eliminate conflicts with paving and drainage improvements proposed by the Road & Bridge Division. Attachments : (List documents supporting work) Attachment A Exhibit showing location of work Attachment B Cost Estimate Method of determining Contract Price : ❑x Unit Prices : Bid Items as established pursuant to Bid No . 3032 , and awarded by the Board of County Commissioners on January 7, 2001 to George E . French, as renewed April 1 , 2003 ❑ Lump Sum ❑ Cost of the Work The Cost of Labor, Contingency and Contract Time is summarized below: Estimated Labor Cost = $ 34, 515 . 85 Estimated Contract Time : 30 days Contin enc at 20% = 65903 . 17 Total Estimated Labor Costs = $41 ,419 . 02 ACCE D : � B tc-f` RE MM ED : A P VED : CO TRS OR BY Date : $" - C� ' ENGINEE I Y IRECTOR Date : _ d� Date : k rv► APPROV D '� APPRO By: BY1�Z2 ��2 / ASS DI C airman Date : lo BCC Approved : 04 - 22 - 03 Attachment 3 F :AUtilities\UTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - 34th Ave . SW - 35th Ave SW Utility Relocations in Grovenor Estates Subdivision UCP#2293\Work Authorization No. 2001 -060 UCP #2293 . doc9 Y ' Board of County Commissioners 1840 25th Street Vero Beach, Florida 32960-3365 LORtOe► Telephone: (561) 5674000 February 19 , 2003 Frank Veneziano BellSouth Telecommunications , Inc . 3300 Okeechobee Road, 2nd Floor Ft . Pierce , Florida 34945 Re : Utility Coordination Meeting for 34h Avenue SW & 35th Avenue SW and Intersecting Streets in Grovenor Estates Subdivision — IRC Project No . 9918 Dear Mr. Moyano : This letter is to inform you that the Indian River County Engineering Division will be holding an Engineering Utility Coordination Meeting on Thursday, March 6 , 2003 at 9 : 00 AM in First Floor Conference Room ` B " at the Indian River County Administration Building at 1840 25th Street, Vero Beach , Florida. We will be discussing the up-coming Special Assessment Improvement for 34th Avenue SW, 35th Avenue SW and intersecting streets in Grovenor Estates Subdivision in Indian River County. We are requesting that a representative from your agency attend this meeting. Please contact me at (772) 567 -8000 extension 1281 if you have any questions . Sincerel , Michael J. Mezzina, Civil Engineer Attachment MJM/ktp cc : James W. Davis , P .E. , Public Works Director Christopher J. Kafer, Jr. , P .E. , County Engineer Christopher R . Mora, P.E. , County Traffic Engineer D . Howard, Jr. , Manager, Construction Coordination Terry Cook, Superintendent, Road & Bridge Division Gordon Sparks , Department of Utility Services FILE F:\EngineeringTetition Paving\9918 34th, 35th Avenues SW\9918 Lus Util Co's-notice, util coord mtg-mjm.dot Attachment 1 Y Indian River County Department of Utilities COST ESTIMATE Project: 341h & 34th Avenues Grovenor Estates Water Services/hIcters Relocations/Replacements UCP #2293 3-Apr-O3 Bid Item n Estimated Unit of Unit Total Labor 6laurial Unit 6laterial Itan No Descri tioTaal Quantity Measure Price Price Price Price Price 63 Mobilization 1 0.05 1 ,527.25 64 Demobilization I 0.03 916.35 65 Maintenance ofTratTic I 0.05 1 ,527.25 06 Make Connection to Existing Main 4 EA 380.00 1 ,520.00 Ola Install 3 " PVC Water Main 1 ,000 LF 6 .00 6,000.00 Oic Install 6" PVC Water Main 1 . 14 1 , 140.00 20 LF 8.00 160.00 2.74 53.80 Old Install 6" HDPE Water Main 50 LF 10.00 500.00 22a Re lace Exislin • Meter w/ New meter 2.97 148.50 IOb 45 EA 350.00 50.00 2.750.00 125 .00 6,875 .00 Ta 6" Walermain 1 ,400.00 19 Remove & Replace Meter Box 55 EA 125 .00 6,875.00 100.00 5, 500.00 16a Relocate Fire Hydrant Assembly w/6" Gale Valve & Tee 5 EA 1 ,000.00 5,000.00 13c Install 6" Gale Valve 1 EA 200.00 200.O0 Ila Water Service Line 1 " PE Tubing 441 . 22 441 . 22 450.00 LF 10.00 4, SOU.UU 0. 15 157. 51) _ 20 Potholes 10.00 EA 100.00 1 ,000.00 24 Obtain Bacterial Sample/Deliver to Lab 4 EA 40.00 160.00 39 ROW Gradin • 80 SY 6.00 480.00 Subtotal Water Facilities 30,545 .00 Total Water Facilities D 34.515.85 Total Materials IRCDUS Force Account 14,317.02 1 0.20 6,903 . 17 Total Labor 41 ,419.02 TOTAL ESTIMATED COST 55.736.04 calecln's BM Item list