Loading...
HomeMy WebLinkAbout2004-281 d G . K. ENVIRONMENTAL INC . "Providing Common Ground Solutions" 155 McKee Lane GEORGE R . KULCZYCKI , C . E . S . , C . E . I . Vero Beach , FL 32960 President / Principle Ecologist July 26 , 2004 Mr. James W . Davis, P . E. Public Works Director Indian River County 1840 25 `h Street Vero Beach, FL 32960 RE : PROPOSAL / CONTRACT OSLO BOAT RAMP / COUNTY PROJECT 40381 State and Federal Regulatory Permitting & Mitigation Plan Dear Jim, This letter is in response to the requested proposal for the above referenced project in Indian River County, Florida, for environmental services as generally required for State and Federal Environmental Resource / Individual Permits . G. K. Environmental, Inc. (GKE) will be pleased to provide this service with tasks completed under this contract and which are briefly outlined below : SCOPE OF SERVICES TASK I — Permit Application Submittals TASK I : GKE to assist client and client ' s engineer and surveyor to complete required field work / meet / review work with client, review drawings, and permit application completion . TASK II — Mitigation Plan TASK II : GKE will meet with client and permit agency staff to discuss mitigation options and inspect potential mitigation sites for compatibility and prepare Office ( 772) 567 -9129 E-mail grk@steds. org Fax ( 772) 567-6245 Printed on Recycled Paper a draft mitigation plan, based upon the ecological values of wetland impacts . TASK III — Wetland Rapid Assessment Procedure / UMAM TASK III : GKE will conduct a Wetland Rapid Assessment Procedure (WRAP) and/or a Uniform Mitigation Assessment Method (UMAM) of the wetlands located within the boundaries of the project site . WRAP/UMAM determine a numerical value for the ecological functions and ecological values of the existing wetlands and mitigation site . The WRAP/UMAM score can be used to determine what type / amount of mitigation will be required for the project site . The WRAP/UMAM score is based on vegetation, wildlife usage, hydrology, soils, water quality, success factor, and adjacent lands . TASK IV — Protected Species TASK IV : GKE will complete a detailed protected species survey on the referenced site . GKE ecologist will conduct a preliminary systematic survey for protected species in accordance with Florida Fish and Wildlife Conservation Commission (FFWCC) Guidelines . GKE ecologist will record all observations of listed protected species and features that may indicate species presence . Physical features may include, but are not limited to , tree markings, burrows, tracks, nests, scat, and cavity trees . GKE will request that the U. S . Fish and Wildlife Service (FWS) and the Florida Fish & Wildlife Commission (FFWCC) review their files for the presence of any listed species that may be present onsite . TASK V — Vegetation Survey (FLUCCS) TASK V : GKE will conduct a systematic survey of vegetation using the Florida Land Use, Cover and Classification System (FLUCCS), A Technical Report. FLUCCS was developed by the State of Florida, Department of Administration, Division of State Planning, Bureau of Comprehensive Planning, April 1976 . GKE ecologist will base the vegetative community descriptions upon field survey observations, SCS soil maps, and aerial photograph interpretation. TASK VI — Historical / Archaeological Resources TASK VI : GKE will coordinate historical and/or archaeological resources with the Florida Department of State, Division of Historical Resources, State - Page 2 of 4 GKE / Davis / IRC Proposal / Oslo Boat Ramp 7-26-04 Historical Preservation Officer (SHPO) and request the state to review their files for historical and/or archaeological resources related to this area. The completion of the above tasks will be provided to the client in report form. TASK VII — Response to Auncy Requests for Additional Information (RAI) TASK VII : Following agency permit application review, GKE will respond to all environmental questions outlined in agency letters requesting additional information (RAI letters) , including completion of water quality analysis if required. GKE Fees / Compensation Work on TASKS I through VI outlined above could begin within fifteen ( 15 ) days of G. K. Environmental, Inc. ' s receipt of Notice to Proceed, for the lump sum of $ 7, 350 . 00 . Receipt of one ( 1 ) fully executed copy of this contract shall serve as our Notice to Proceed with Tasks I through IV . Work on TASK VII will begin following receipt of permitting agency requests for additional information, and will be completed on a time and materials basis, not to exceed $ 7, 500 . 00 . If additional GKE fees over $ 7, 500 . 00 are required, GKE will advise client and not proceed until written authorization from the client is received . Typically a project with similar proposed impacts will require a minimum of three rounds of RAI responses and several agency meetings on and off site. This project will also be coordinated with the ACOE and SJR WMD affiliated commenting agencies, including but not limited to Fish and Wildlife Conservation Commission staff, National Marine Fisheries staff, U. S. Fish and Wildlife Service staff, and Indian River County staff. Services Not Included The following services are not included (if required) in this agreement, but will be coordinated and reviewed by GKE : 1 ) water quality laboratory analysis 2) surveying / engineering 3 ) Auto CAD work 4) legal work 5) permit drawings Page 3 of 4 GKE / Davis / IRC Proposal / Oslo Boat Ramp 7-26-04 office. If the above is acceptable, please sign below and mail or fax a copy to our Work will be scheduled upon receipt of signed authorization. Payment is due within 30 days of date of invoice. Thank you for the opportunity for G. K. Environmental, Inc. to offer our professional services . If you have any questions, please feel free to give me a call , arg ely, ie R. Kul ycki , President Principal Ecologist ACCEPTED BY : NoyPmhPr 9 . 2004 , Client / Owner / Authori d Agent Signature Date rarnllnn n ; inn , Chairman Printed Name A -DPROVED . My Ad inistrator APP VED AS TO FORM ANt L SUFFI C L -OR AAL r.. 1 ` 481STANT G0 ' 7*TTORNEV u 7ef'hery . ' D ', Clerk of Circuit Court , . By : * titi, n Deputy ClerOF Page 4 of 4 GKE / Davis / IRC Proposal / Oslo Boat Ramp 7-26-04