HomeMy WebLinkAbout2008-404 i
L "
AMENDMENT NO . 1 TO THE PROFESSIONAL
ENVIRONMENTAL SERVICES AGREEMENT
OSLO BOAT RAMP / COUNTY PROJECT NO. 0381
State and Federal Regulatory Permitting & Mitigation Plan
THIS is an amendment to the existing AGREEMENT dated NOVEMBER 9 , 2004 ,
between G . K. ENVIRONMENTAL (CONSULTANT) and INDIAN RIVER COUNTY
(COUNTY) . The proposed scope of work includes environmental services as generally required
for state and Federal Environmental Resource / Individual Permits . All provisions of the original
Professional Environmental Services Agreement shall remain in full force and effect, unless
otherwise specifically modified . This amendment addresses changes in " SCOPE" of the
AGREEMENT.
SCOPE OF SERVICES
TASK I — Permit Application Submittals
($275 .00)
PHASE I : CONSULTANT to assist COUNTY and COUNTY ' S engineer and surveyor to
complete required field work / meet / review work with COUNTY, review
drawings , and permit application completion.
TASK II — Mitization Plan
($29805.00)
PHASE II : CONSULTANT will meet with COUNTY and permit agency staff to discuss
mitigation options and inspect potential mitigation sites for compatibility and
prepare a draft mitigation plan, based upon the ecological values of wetland
impacts .
TASK III — Wetland Rapid Assessment Procedure / UMAM
($0 — completed)
PHASE III : CONSULTANT will conduct a Wetland Rapid Assessment Procedure (WRAP)
and/or a Uniform Mitigation Assessment Method (UMAM) of the wetlands
located within the boundaries of the project site . WRAP/UMAM determine a
numerical value for the ecological functions and ecological values of the existing
wetlands and mitigation site . The WRAP/UMAM score can be used to determine
what type / amount of mitigation will be required for the project site . The
WRAP/UMAM score is based on vegetation, wildlife usage , hydrology , soils,
water quality, success factor, and adjacent lands .
TASK IV — Protected Species
($3 ,850A0)
PHASE IV : CONSULTANT will complete a detailed protected species survey on the
referenced site . CONSULTANT ecologist will conduct a preliminary systematic
survey for protected species in accordance with Florida Fish and Wildlife
Conservation Commission (FFWCC) Guidelines . CONSULTANT ecologist will
record all observations of listed protected species and features that may indicate
species presence . Physical features may include , but are not limited to , tree
markings, burrows , tracks, nests , scat, and cavity trees . CONSULTANT will
request that the U . S . Fish and Wildlife Service (FWS) and the Florida Fish &
Wildlife Commission (FFWCC) review their files for the presence of any listed
species that may be present onsite .
TASK V — Vegetation Survey (FLUCCS)
($0 — completed)
PHASE V : CONSULTANT will conduct a systematic survey of vegetation using the Florida
Land Use, Cover and Classification System (FLUCCS), A Technical Report.
FLUCCS was developed by the State of Florida, Department of Administration,
Division of State Planning, Bureau of Comprehensive Planning, April 1976 .
CONSULTANT ecologist will base the vegetative community descriptions upon
field survey observations , SCS soil maps , and aerial photograph interpretation.
TASK VI — Historical / Archaeological Resources
($660 . 00)
PHASE VI : CONSULTANT will coordinate historical and/or archaeological resources with
the Florida Department of State, Division of Historical Resources, State Historical
Preservation Officer (SHPO) and request the state to review their files for
historical and/or archaeological resources related to this area.
TASK VII — Response to Agency Requests for Additional Information (RAI)
($ 179200 .00)
PHASE VII : Following agency permit application review, CONSULTANT will respond to all
environmental questions outlined in agency letters requesting additional
information (RAI letters) , including completion of water quality analysis if
required .
TASK VIII — Post Construction
($ 19800 .00)
PHASE VIII : Post construction inspection assistance and water quality monitoring during
construction.
Page 2 of 4
CONSULTANT / Davis / IRC
Proposal Amendment / Oslo Boat Ramp
11 -21 -08
TOTAL COST FOR AMENDMENT : $269590.00
Services Not Included
The following services are not included (if required) in this agreement, but will be
coordinated and reviewed by CONSULTANT :
1 ) Water quality laboratory analysis
2) Surveying / engineering
3 ) Auto CAD work
4) Legal work
5 ) Permit drawings
COMPENSATION
This section of the AGREEMENT entitled CONSULTANT FEES / COMPENSATION
shall be revised in response to the Scope modifications set out herein. The charges associated
with this AMENDMENT NO . 1 is as follows :
Fees for Environmental Services :
Work on TASKS I through VII $243790 . 00
Work on TASK VIII $ 19800 . 00
TOTAL Amendment No . 1 $26,590.00
The charges associated with the AGREEMENT and these additional services included in
Amendment shall be increased from $ 7 , 500 . 00 to $ 34 ,090 . 00 .
The AGREEMENT is hereby amended as specifically set forth herein. All sections of
the AGREEMENT shall remain in full force and effect, and are incorporated herein. This
Amendment No . 1 to the AGREEMENT, regardless of where executed, shall be governed by and
construed by the laws of the State of Florida.
Page 3 of 4
CONSULTANT / Davis / IRC
Proposal Amendment / Oslo Boat Ramp
11 -21 -08
IN WITNESS WHEREOF the parties hereto have executed these presents this 9th day
of December 2008 .
OWNER G . K. Environmental , Inc .
BOARD OF COUNTY COMMISSIONERS
INDIAN RIVER COUNTY, FLORIDA
(Signature 4Signae)
Wesley S. Davi Is,' Chafrman George R Kulczycki President
(Printed name and title)
r 4 .
lj
Approve4lDeceffber 9 , 2008
Witnessed by :
ATTEST .
MaryLouise Scheidt, Clerk, Ad Interim
D Nuty Clerk (Printed name
Approved as to Form and Legal Sufficiency :
( r William G . Collins II , COUNTY Attorney (Printed name)
Page 4of4
GKE / Davis / IRC
Proposal Amendment / Oslo Boat Ramp
11 -21 -08