Loading...
HomeMy WebLinkAbout2008-030WORK ORDER NUMBER 14 This Work Order Number 14 is entered into as of this22ndday of January 200u ("Effective Date") pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of August 10, 2004, and amended effective July 24, 2007 (as so amended, the "Agreement"), by and between Indian River County Solid Waste Disposal District, a dependent special district of Indian River County, Florida ("District") and Geosyntec Consultants, Inc. ("Consultant"). 1. The District has selected the Consultant to perform the professional services set forth on Attachment 1, attached to this Work Order and made part hereof by this reference. 2. The professional services will be performed by the Consultant for the fee schedule set forth in Attachment 2, attached to this Work Order and made a part hereof by this reference. The Consultant will perform the professional services within the timeframe more particularly set forth in Attachment 3, attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement. 3. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein. IN WITNESS WHEREOF, the parties hereto have executed this Work Order as of the date first written above. CONSULTANT Geosyntec Consultants, Inc. By: i1 x L`.ri Thomas A. Peel, Ph.D. Title: Vice President INDIAN RIVER COUNTY SOLID WASTE DISPOSAL DISTRICT Z PC •. a Attest j;K. Bbit C.ler ByA6pyCrerk A. Admi Chairman V as to form and legal sufficiency: Marian E. Fel , ssis County Attorney ATTACHMENT I PROFESSIONAL SERVICES 2258 venue Geosyntec k` Jacksonville, FL 32204 ]acksmiville, FL 32204 consultants 904-388-8821 east of Interstate 95 in Section 25, Township 33 South, Range 38 East in 904-388-8163 Florida. The IRCL facility is currently operating as a Class 21 December 2007 Mr. Himanshu H. Mehta, P.E. Managing Director Solid Waste Disposal District Indian River County 1325 74°i Avenue SW Vero Beach, Florida 32968 Subject: Revised Proposal to Provide Compliance Monitoring Reporting and Other Technical Support Services Class I Landfill and C&D Debris Disposal Facility Indian River County Landfill Facility Vero Beach, Indian River County, Florida Dear Mr. Mehta: Geosyntec Consultants (Geosyntec) is pleased to submit this letter proposal to the Indian River County (IRC) Solid Waste Disposal District (SWDD) for the provision of professional services supporting the operation of the Class I landfill and Construction and Demolition (C&D) debris disposal facility at the IRC Landfill (IRCL) facility located in Vero Beach, Indian River County, Florida. The proposal presents the scope of work, schedule, and budget estimate for the compliance monitoring reporting and other technical support services related to the operation of the solid waste disposal facilities during the fiscal year (FY) 2007-2008. The proposal was prepared in response to a verbal request from the SWDD during a 2 August 2007 meeting at the IRCL site with Mr. Himanshu Mehta, P.E. of SWDD and Dr. Kwasi Badu-Tweneboah, P.E. of Geosyntec. Geosyntec has prepared this proposal (professional services in Attachment 1) under Work Order No. 14 for the Continuing Contract Agreement for Professional Services between IRC SWDD and Geosyntec, dated 10 August 2004 and renewed 1 I August 2007. The remainder of this proposal presents: (i) project background; (ii) proposed scope of work; (iii) budget estimate; and (iv) schedule. PROJECT BACKGROUND The IRCL facility is located south of Oslo Road, west of Range Line Road (74°i Avenue) and east of Interstate 95 in Section 25, Township 33 South, Range 38 East in Indian River County, Florida. The IRCL facility is currently operating as a Class I landfill and C&D debris disposal XL07246/JL70274. doc ettrF,'t'I, I ,_1"litl,J innovators Mr. Himanshu H. Mehta, P.E. 21 December 2007 Page 2 facility under the Florida Department of Environmental Protection (FDEP) Operations Permit Numbers SO31-0128769-008 and 5031-0128769-009, respectively. The overall IRCL site occupies 276 acres, with 63 acres used for Class I disposal and 22 acres used for C&D disposal. Waste materials accepted for the Class I landfill disposal include residential, commercial, agricultural, and industrial wastes. The landfill serves the unincorporated Indian River County and municipalities of Vero Beach, Orchid, Fellsmere, Sebastian, Indian River Shores, and Wabasso, Florida. The Monitoring Plan Implementation Schedule (MPIS) for each of the IRCL facilities permits (which is listed as Exhibit I of each permit) indicates that groundwater, surface water, and leachate (for Class I landfill only) quality monitoring are required. Semi-annual sampling of the 23 groundwater monitoring wells shall be collected in January and July for the list of Semi - Annual Ground Water Parameters on Attachment C of the Class I landfill and C&D disposal facility MPIS. Surface water samples from the two surface water monitoring sites shall be collected semi-annually in January and July and analyzed for the list of Semi -Annual Surface Water Parameters presented as Attachment D of the MPIS. Leachate shall be sampled annually from the leachate monitoring site and analyzed for the list of Annual Leachate Parameters presented as Attachment E of the Class I landfill MPIS. Geosyntec will conduct the field sampling activities and the analytical testing will be conducted by Columbia Analytical Services (CAS), the analytical laboratory contracted with SWDD. The results of the annual and semi- annual water -quality monitoring events are to be reported to FDEP within 60 days of receipt of analysis from the laboratory. The SWDD was issued a notice of final Title V renewal permit on August 2, 2007. The permit requires that the SWDD prepare and submit to FDEP and the U.S. Environmental Protection Agency (USEPA), Region 4 the following: • Annual statement of compliance within 60 days after the end of the calendar year; • Annual Operating Report (AOR) before March 1 of the new calendar year: and • Results of an annual test for visible emission of the flare, within 45 days of testing. Table 1 presents a list of compliance monitoring and reporting requirements and schedule for the IRCL site. This proposal presents the scope of work and budget estimate for: (i) the FY2007-08 annual and semi-annual water -quality sampling and reporting; (ii) compliance with Title V permit requirements; and (iii) other compliance monitoring reporting and technical support that may be required for the IRCL facility. XL0724&IL70274.doc Mr. Himanshu H. Mehta, P.E. 21 December 2007 Page 3 PROPOSED SCOPE OF WORK The proposed scope of work includes activities to be performed on behalf of SWDD for the compliance monitoring reporting and other technical support services for the Class I landfill and C&D disposal facility. For the purpose of budgeting, the scope of work has been divided into the following four main tasks: • Task 1 — Project Management/Meetings; • Task 2 — Annual and Semi -Annual Sampling and Reporting; • Task') —Title V Permit Compliance and Reporting; and • Task 4 —Miscellaneous Compliance and Technical Support. The remainder of this section presents a general description of the activities to be performed in each task. Task 1 — Proiect Management/Meetings Under this task, Geosyntec will perform project planning and management responsibilities, such as correspondence with SWDD and FDEP, invoice review, project coordination, and project administration. Geosyntec has also included budget for preparation and attendance (by two Geosyntec personnel) at two meetings with SWDD and/or FDEP, as needed. Task 2 — Annual and Semi -Annual Sampling and Reporting Geosyntec will: (i) assist the SWDD to perform the annual and semi-annual sampling; and (ii) prepare the water -quality reports as required by the MPIS. Geosyntec will assist the SWDD to conduct all field preparation activities, including scheduling, staffing, subcontracting, and field equipment preparation. Geosyntec will assist the SWDD to perform the field testing, sample collection, and water -level measurements. The laboratory analytical testing will be conducted by CAS testing laboratory. Geosyntec will assist the SWDD to coordinate the analytical testing activities with CAS, notify FDEP prior to sampling as required by the MPIS, review and evaluate the analytical test results, and prepare the semi-annual reports. The results of water -quality sampling under the MPIS will be presented in a report supported by attachments containing chain -of -custody sheets, field notes and observations, water sampling logs, maps, analytical results, and any other applicable materials. The reports will include XL07246/71,70274.doc Mr. Himanshu H. Mehta, P.E. 21 December 2007 Page 4 ground water completion report form and ground water elevation contour map, both signed and sealed by a Florida registered professional engineer. These reports will be submitted to SWDD for review prior to submittal to FDEP. According to the MPIS, monitoring test results must be submitted to FDEP within 60 days of receipt of the analytical data from the laboratory. Task 3 — Title V Permit Compliance and Reportin Geosyntec will prepare and submit to FDEP the AOR for the calendar year 2007. We will perform calculations to estimate the annual emission rates of non -methane organic compounds (NMOCs) and volatile organic compounds (VOCs) from the landfill gas to determine if the facility designation has changed from voluntary to mandatory with regard to operation and reporting requirements of the active landfill gas collection and control system (GCCS) under the New Source Performance Standards (NSPS) requirements. In the event of a status change, Geosyntec will advise SWDD of its implications. We will also assist SWDD to prepare and submit the Annual Statement of Compliance to FDEP and USEPA. Geosyntec will also provide oversight of the annual visible emission testing of the flare (expected for April 2008). We will advise FDEP of the time and location of the test; provide an oversight during the test; and prepare and submit to FDEP a report of the test results. Task 4 — Miscellaneous Compliance and Technical Support Under this task, Geosyntec will provide SWDD with technical support and other miscellaneous compliance services related to the operations of the Class I landfill and C&D disposal facility. The miscellaneous compliance and reporting services will include: (i) compliance monitoring requirements of the Multi -Sector Generic Permit for stormwater discharge; (ii) quarterly monitoring/reporting of the landfill gas monitoring wells located at the IRCL site boundary, as well as enclosed structures located on site; (iii) submittal of records of groundwater dewatering volumes to St. Johns River Water Management District (SJWMD) in compliance with the consumptive use water permit; (vi) engineering support for preparation of agenda items to District Board and the development of annual budgets; and (v) other required renewal permits or technical support that may become necessary. Table 1 presents a compliance monitoring and reporting requirements and schedule for the IRCL site. BUDGET ESTIMATE A budget estimate for the scope of work outlined in Tasks I through 4 of this proposal is summarized in the following table, and a detailed budget estimate is provided as Attachment 2. XL07246000274 doe Mr. Himanshu H. Mehta, P.E. 21 December 2007 Page 5 The budget estimate presented in this proposal is based on Geosyntec's understanding of the project requirements, our experience gained from executing similar tasks for SWDD during FY2006-07, and experience with compliance monitoring, and reporting at similar facilities. Geosyntec will not exceed the budget estimate without prior approval and written authorization from SWDD. Task 1 — Project Management/Meetings $18,482 Task 2 — Annual and Semi -Annual Sampling and Reporting $34,457 Task 3 — Title V Permit Compliance and Reporting $12,347 Task 4 — Miscellaneous Compliance and Technical Support $32,076 TOTAL $971362 SCHEDULE Geosyntec has prepared a preliminary schedule for compliance monitoring reporting and other technical support services, which is included as Attachment 3. Geosyntec has assumed a start date of I December 2007. Geosyntec will prepare the 2008 annual and semi-annual reports for submittal to FDEP in February/March and August/September 2008, respectively. Technical support services will be provided on an as -needed basis. CLOSURE Geosyntec appreciates this opportunity to offer our services. If this proposal is acceptable, please indicate your agreement by signing the attached work authorization, which references this proposal. Please return one signed work authorization to Dr. Badu-Tweneboah's attention. Please call either of the undersigned with questions you may have as you review this proposal. Sincerely, Wade Tyner, E.I. Staff Engineer „ Associate Attachments XL07246/JL70274 doc .E. TABLE 7 N U EwcE _ p m O a N LL � U LL U C O C N O O O R - v •- v `� m N p R N R N a = N Q N E o U a E LL Q C D N Z D N R w n n R C U m v c m R a W C C T on a Dj jfn N O O N N c cgzLL a w �� eNs (nzr z m v R n m m J 00 0 0 0 0 0 0 M M OO O O O h O O O N O O O N N p^ M N N N (V N N N N N N N (V N N N fV N (O (D t0 (O (O [O (O (O N fD (O (O (D (D (O fD l0 N N E O O O O O O O m o 0 0 0 `O m rn m m iy �� 00 C .M-cM0 N N N N N N N N t0 (O t0 (O (O t0 f0 (O m 4 m � N R j R N C] R IO U ❑ R � `-n � c T _ C - c - _ R m L m R C R R R R N- R � O C C C R C C C C C C >>> J C a O c c.= v R c c c c c c c c c c m LL g Q¢E m Z Q Q Q v w m v m m v o f o = 'N c m v R C E M � c m C o— c o R b e o c Q m R N V p R 0 C J m N N `1 h U m m m N m m E m m m U= c c fn J a' p] J LL U LL C C C N C C m C R Q is UIQ 'Q U1Q LL O c v c m E v m N R R J -o c o R o - m U t� � ATTACHMENT 2 BUDGET ESTIMATE Table 1 BUDGET ESTIMATE COMPLIANCE MONITORING REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA TASK 01: PROJECT MANAGEMENT/MEETINGS In compliance with Section 112.061 F.S. XL07246JL70724_revised.zls Geosyntec Consultants ITEM BASIS RATE QUANTITY ESTIMATED COST Professional Services a. Principal Hr $189 0 $0 b. Associate Hr $179 60 $10,740 c. Senior Project Engineer Hr $158 0 $0 d. Project Engineer Hr $125 20 $2,494 e. Engineer Hr $109 0 $0 f. Senior Staff Engineer Hr 1 $97 0 $0 g. Staff Engineer Hr 1 $81 16 $1,302 Subtotal Professional Services $14,536 a. CADD Designer Hr $115 0 $0 b. Drafter/CADD Operator/Artist Hr $70 0 $0 c. Technical/Administrative Assistant Hr $79 8 $629 d. Technical Word Processor Hr $80 8 $642 e. Clerical Hr $48 40 $1,930 Subtotal Technical/Administrative Services $3,201 C, Reimbursable's a. Lodging Day $100 0 $0 b. Per Diem' Day $21 0 $0 c. Communications Fee 3% Labor 0.03 $17,738 $532 d. CADD Computer System Hr $15 0 $0 e. Vehicle Rental` Day $100 2 $200 f. 8"x11" Photocopies Each $0.12 100 $12 g. CADD Drawings Each $3 0 $0 Subtotal Reimbursables $744 TOTAL ESTIMATED BUDGET: TASK 01 ` $18,482 In compliance with Section 112.061 F.S. XL07246JL70724_revised.zls Geosyntec Consultants Table 2 BUDGET ESTIMATE COMPLIANCE MONITORING REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA TASK 02: PREPARATION OF ANNUAL AND SEMI-ANNUAL REPORTS In compliance with Section 112.061 F.S. XL07246/JL70724_revised. As Geosyntec Consultants ITEM BASIS RATE QUANTITY ESTIMATED COST Ffgfessjdia# services x a. Principal Hr $189 8 $1,512 b. Associate Hr $179 40 $7,160 G. Senior Project Engineer Hr $158 0 $0 d. Project Engineer Hr $125 40 $4,989 e. Engineer Hr $109 0 $0 f. Senior Staff Engineer Hr 1 $97 1 60 $5,804 g. Staff Engineer Hr $81 80 $6,510 ,y Subtotal Professional Services a. CADD Designer Hr $115 0 $25 975 $0 b. Drafter/CADD Operator/Artist Hr $70 40 $2,812 c. Technical/Administrative Assistant Hr $79 0 $0 d. Technical Word Processor Hr $80 16 $1,284 e. Clerical Hr $48 16 $772 Subtotal Technical/Administrative Services C`Ffeijbutsap)gs:' $45869 �_ ,. a. Vehicle Rental* Day $100 10 $1,000 b. Communications Fee 3% Labor $0.03 $30,843 $925 c. Lodging Day $100 8 $800 d. Per Diem Day $21 8 $168 e. CADD Computer System Hr $ 15.00 $40 $600 f. 8"01" Photocopies Each 1 $0.12 1 500 $60 g. CADD Drawings Each $3.00 20 $60 Subtotal Reimbursables - _ TOTAL ESTIMATED. BUDGET :TASK 023 $3,613 ` $3494571 In compliance with Section 112.061 F.S. XL07246/JL70724_revised. As Geosyntec Consultants Table 3 BUDGET ESTIMATE COMPLIANCE MONITORING REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA TASK 03: TITLE V PERMIT REPORTING H] cornpuance wltn Jection 112.061 F.S. XL07246/JL70724_revised. xls Geosyntec Consultants ITEM BASIS RATE QUANTITY ESTIMATED COST r_ a. Principal Hr $189 2 $378 b. Associate Hr $179 12 $2,148 c. Senior Project Engineer Hr $158 0 $0 d. Project Engineer Hr $125 20 $2,494 e. Engineer Hr $109 0 $0 f. Senior Staff EngineerHr $97 20 $1,935 g. Staff Engineer Hr 1 $81 30 $27441 Subtotal Professional Services $92396 a. CADD Designer Hr $115 0 $0 b. Drafter/CADD Operator/Artist Hr $70 12 $844 c. Technical/Administrative Assistant Hr $79 0 $0 d. Technical Word Processor Hr $80 8 $642 e. Clerical I Hr $48 12 $579 Subtotal Technical/Administrative Services $2,065 <[fimbufsatijes" - r a. Lodging Day $100 0 $0 b. Per Diem' Day $21 2 $42 c. Communications Fee 3% Labor 0.03 $11,461 $344 d. CADD Computer System Hr $15 12 $180 e. Vehicle Rental` Day $100 2 $200 f. 8"x11" Photocopies Each $0.12 500 $60 g. CADD Drawings Each $3 20 $60 Subtotal Reimbursables $886 k.u< <... TOTALESTiMATEU BUDGET : TASK -'03., $12,347 H] cornpuance wltn Jection 112.061 F.S. XL07246/JL70724_revised. xls Geosyntec Consultants Table 4 BUDGET ESTIMATE COMPLIANCE MONITORING REPORTING AND OTHER TECHNICAL SUPPORT SERVICES CLASS I LANDFILL AND C&D DEBRIS DISPOSAL FACILITY INDIAN RIVER COUNTY, FLORIDA TASK 04: MISCELLANEOUS COMPI ICAICF nun TFru►nrA1 cl Ill Milphahce with Section "I u.U61 h.s. XL07246/JL70724 revised.xls Geosyntec Consultants - �vv�f VRI ITEM BASIS RATE QUANTITY ESTIMATED u ssr_ a. Principal Hr $189 q b. Associate Hr $179 40 c. Senior Project Engineer Hr $158 0 d. Project Engineer Hr $125 60 e. Engineer Hr $109 0 I. Senior Staff Engineer Hr $97 40 g. Staff Engineer Hr $81 60 COST $756 $7,160 $0 $7,483 $0 $3,870 $4,882 Subtotal Professional Services a. CADD Designer Hr $115 20 b. Drafter/CADD Operator/Artist Hr $70 20 c. Technical/Administrative Assistant Hr $79 8 d. Technical Word Processor Hr $80 12 e. Clerical Hr $48 12 $24l151 $2,306 $1,406 $629 $963 $579 yl' Subtotal Technical/Administrative Services iF + iiufsab f'y Y F H Y i ms .i 3 ' a. Lodging Day $100 p b. Per Diem' Day $21 0 c. Communications Fee 3% Labor 0.03 $30,035 d. CADD Computer System Hr $15 40 e. Vehicle Rental' Day $100 0 f. 8"x11" Photocopies Each $0.12 2000 g. CADD Drawings Each L3_1 100 $5,884 '-• $0 $0 $901 $600 $p $240 $300 Subtotal Reimbursables R . TQ, " 4ETI .TED: , '/�S 5a . --"-- - $2,041 -$32.076 Ill Milphahce with Section "I u.U61 h.s. XL07246/JL70724 revised.xls Geosyntec Consultants ATTACHMENT 3 SCHEDULE iw o n