HomeMy WebLinkAbout2009-123 WORT( ORDER NUMBER 21 This Work Order Number 21 is entered into as of this5thday of May 2009 pursuant to that certain Continuing Contract Agreement for Professional Services entered into as of August 10 , 2004 and amended July 24 , 2007 ( as so amended , the "Agreement" ) , by and between Indian River County Board of County Commissioners ( " COUNTY" ) on the same terms as the existing Agreement , as extended , between the Indian River County Solid Waste Disposal District , a dependent special district of Indian River County , Florida , ( " DISTRICT' ) and Geosyntec , Inc . , a Florida corporation ( " CONSULTANT' ) . The COUNTY has selected the Consultant to perform the professional services set forth on Attachment A , attached to this Work Order and made part hereof by this reference . The professional services will be performed by the Consultant for the fee schedule set forth in Attachment B , attached to this Work Order and made a part hereof by this reference . The Consultant will perform the professional services within the Schedule more particularly set forth in Attachment A , attached to this Work Order and made a part hereof by this reference all in accordance with the terms and provisions set forth in the Agreement . Pursuant to paragraph 1 . 4 of the Agreement , nothing contained in any Work Order shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed to be incorporated in each individual Work Order as if fully set forth herein . IN WITNESS WHEREOF , the parties hereto have executed this Work Order as of the date first written above . CONSULTANT GEOSYNTEC CONSULTANTS , INC . INDIAN RIVER COUNTY By : gY -- - Thomas A. Peel , Ph . D . , Vice President Wesley S . Davis , Chairman Attest : J . K . Barton , Cl � rl: of By : _ Dep y Clerk ` __ - -- Approved : C11 1) ),ah Q I'll I F) /J seph A Baird , County Administrator p roved as to form and legal sufficiency : ° 1 1 Indian River d Date Co . __ _ ____ _ __ Manan E . Fell %ssis an unty Attorney Administrationr) O Legal Budget Departmen Risk Mgt . ATTACHMENT 1 PROFESSIONAL SERVICES PROPOSAL I 6770 South Washington AVOILIC, SuiteGeosYntee Titusville, Florida 32780 PH 321 269. i880 Consultants FAX 321 , 269, 5813 16 April 2009 Mr. Lynn Williams Superintendent Indian River County Building and Grounds 1840 25 "i Street Vero Beach , Florida 32960 Subject : Professional Services Proposal UST Closure and AST Installation Support Indian River County Sheriff' s Administration Building 4055 41 " Street Vero Beach , Ff. 32960 Dear Mr. Williams : Geosyntec Consultants ( Geosyntec ) is pleased to submit this fee proposal to Indian River County ( IRC ) for professional services associated with the closure of two , 10 , 000 gallon steel underground storage tanks ( USTs ) and the electrical connections for two , IRGsupplicd, 500- gallon Convault aboveground storage tanks ( AST) equipped with dispenser pumps and delivered with pre- cast slabs at the IRC Sheriff' s Department Headquarters . It is Geosyntec ' s understanding that the 10 , 000 gallon USTs has been used for the storage of unleaded gasoline , exclusively. The scope of work described below has been developed in accordance with Florida Department of Environmental Protection ( FDEP ) Storage Tank System Closure Assessment Requirements and Chapter 62 - 761 , Florida Administrative Code ( FAC ) . An overview of the work completed to date and the proposed project scope follows . OVERVIEW Geosyntec performed groundwater sampling in the four monitoring wells surrounding the 10 , 000 - gallon USTs in June 2007 . The groundwater sampling was performed to assess whether the USTs have potentially had a detectable release of petroleum compounds to groundwater. The laboratory analytical results , presented in a letter report dated 23 July 2007 , did not detect any petroleum constituents above groundwater cleanup target levels ( GCTLs) . Based upon these results , it does not appear that the USTs are compromised or that a release of petroleum compounds has occurred . Accordingly, the scope of work developed for the site assumes that the XR091 I WCCR09040 , DOC cI1l;ittccrS 1 S ( IWlilist5 in ) tov ; ttors i i i Mr . Lynn Williams r ��E' GA eo ' t 16 April 2009 �,1 ~ � Page 2 consultarus treatment of petroleum - contaminated groundwater from within the UST excavation will not be performed and that the over- excavation of the UST area to remove petroleum - impacted soils will not be required . The proposed scope of work for the services required to close the USTs and provide electrical connections to the IRC -provided ASTs has been broken down into three separate phases ( Phases A through C ) as described below . Phase A — Preliminary Activities Phase A includes project management for the entire project ( Phases A through C ) , as well as all preliminary activities associated with meeting with and securing project costs from three licensed petroleum storage systems contractors and modifying the Site- Specific Health and Safety Plan to cover the UST closure activities . Specific activities include : • project planning and management responsibilities , such as correspondence with IRC , IRC Department of Health , subcontracting, invoice review , project coordination, and project administration ; and • participating in on- site meetings and correspondence with IRC , IRC Department of Health , and Brevard County Natural Resources Management Office ( administers petroleum cleanup progpin in IRC ) . Phase B — UST Closure and AST Connection Field Activities Phase B includes project activities associated with implementing the UST closure activities and connecting the IRC - provided ASTs , including the following tasks : • Perform oversight and monitoring of activities associated with the proper closure and off- site disposal of the two , 14, 000- gallon USTs in accordance with Chapter 62 - 761 , FAC . Tasks to be performed by Geosyntec ' s subcontractor will include the following : o secure permits for the removal activities ; o sawcut and remove concrete over the UST area ; o excavate overburden and stockpile for fill material ; o remove any liquid residue/ sludge within USTs ; o properly remove and dispose of USTs at the IRC landfill ; X 8091 16;CC 809040 DOC Wiginccrs I .�, � it � r � tiwt I i � in �walurs Mr. Lynn Williams 16 April 2009 �teOS�/ilCeC, Page 3 consllitants o cut and cap product and vent line piping at the edge of the excavation ( i . e , adjacent to the existing canopy which will not be removed ) ; o backfill area with existing fill and balance of material required to bring excavation to grade ; and o supply, install and broom finish an area up to 35 ft by 40 ft by 6 - inches thick with a 3 , 000 psi fibermesh concrete . • Perform organic vapor analyzer screening of excavated soils during the performance of the UST closure activities . • Upon removal of the USTs perform soil sampling ( up to four excavation side-wall samples ) at the location of the 10 , 000 - gallon USTs . Collected soil samples will be laboratory analyzed for benzene , toluene, ethylbenzene, total xylenes , and methyl tert - butyl ether ( BTEX/ MTBE ) , polynuclear aromatic hydrocarbons ( PAHs ) , and total recoverable petroleum hydrocarbons (TRPH ) ( one location) . • Install a temporary well screen in the excavation and collect groundwater samples from the center of the excavation area for BTEX/ MTBE , PAHs , and TRPH . • Provide electrical connection to two , IRC -provided , 500-gallon ASTs that will be delivered and placed on pre- cast concrete slabs ( provided by manufacturer) . Geosyntec obtained estimates from three licensed petroleum storage systems contractors ( Attachment 2 ) , based upon the specific Schedule of Prices table supplied by Geosyntec for project bidding . Geosyntec received three subcontractor bids, with base bid costs of $ 26 , 125 , $ 29 , 970 and $ 36 , 800 . Based upon the estimates submitted , Geosyntec will subcontract the low bidder, Petroleum Resources & Development ( PR & D ) to perform the UST closure services and will perform oversight of the subcontractor during field activities , conduct required soil and groundwater sampling activities and perforin organic vapor analyzer ( OVA) screening of the excavated soil . Due to the uncertainties associated with the UST closure projects and unknowns associated with the 500- gallon ASTs , a 20 percent contingency has been added to Task element B . The contingency is in place to cover items such as increased excavation volumes , costs for vacuum truck on site time , increases in petroleum - contact water disposal volumes , increases in project duration due to weather, increased excavation volumes , additional concrete beyond the 1 , 400 X 8091 161CC R09040 . D0C t; llryllluer `S IS1 " 1t ' 13 � 1 `i � 5 I hillovittol5 i I Mr. Lynn Williams 16 April 2 (709 C� UWSYC Lee 1 Page 4 Cons111tarits square feet proposed , etc . Geosyntec will notify IRC and secure approval of any field conditions that may require access to contingency fees . Geosyntec ' s proposal assumes up to six days of oversight for field activities associated with the UST closure and AST connection activities . A breakdown of estimated project costs is included as Attachment 3 . Phase C — Reporting GeoSyntec will prepare a Tank Closure Report in accordance with Chapter 62 - 761 , FAC and FDEP Storage Tank System Closure Requirements . The report will include photographs documenting the tank closure work , laboratory analytical results for collected soil and groundwater samples in tables and figures , and a detailed summary of the field activities completed at the site . The final reports ( four hard copies and one electronic copy to be provided to IRC ) will be signed and sealed by the Florida - licensed professional engineer in responsible charge of the project . A breakdown of estimated project costs is included as Attachment 3 . ASSUMPTIONS The following assumptions were made in developing this fee proposal : • IRC personnel will assist Geosyntec with the identification of and protection (if necessary) of any utilities located within the UST excavation area . • Geosyntec will not be responsible for damage to any underground utilities located on the site ( it is presumed that any utilities encountered during UST closure activities will be cut/ capped and/or removed for off-site disposal ) . • No costs are provided for the removal of the overhead canopy. • The USTs will be drained of fuel ( to the greatest extent feasible) prior to UST closure field activities . • The USTs , product piping, concrete , and miscellaneous debris will be transported to the IRC Class I landfill for disposal as non - hazardous waste . Landfill disposal charges will be handled directly by IRC . • All site work can be performed in Level D personal protective equipment . X 8091 i 6„'CC RO9040 . D0C C11 " ilicers itiliovalmIs Mr . Lynn Williams eosy` ` tee CO ' 16 April 2009 consultants Page 5 • The 500- gallon ASTs will be provided by IRC and will be delivered/off- loaded by IRC and /or the AST manufacturer and placed on pre-cast manufacturer provided slabs and/or on a suitable concrete surface . • The 500- gallon ASTs will come equipped with product dispensers and will only require electrical connections . • Geosyntec will be able to work unimpeded . SCHEDULE Geosyntec anticipates that upon approval from IRC , UST closure field activities will be initiated within six weeks . It is anticipated that the UST closure activities will require approximately one week . The AST connection field activities will be coordinated with IRC based upon the procurement and delivery of the ASTs to the site. The final Tank Closure/Source Removal Reports will be provided to IRC within six weeks of completion of field activities . ESTIMATED BUDGET The fee proposal is provided as Attachment 3 . The total estimated budget to complete to work described in the fee proposal is $60,067 . CLOSURE Geosyntec appreciates the opportunity to submit to IRC the attached fee proposal ( Attachment 3 ) for services at the site . If this proposal is acceptable to you , please indicate your agreement by signing the Work Authorization, which references this proposal . Please return one signed Work Authorization to Mr . Langenbach ' s attention . Please do not hesitate to contact Mr . Langenbach with any questions you may have as you review this fee proposal . Sincerely, James J . Langenbach , P . E . Associate/ Engineer Attachments X 8091 I GICC R09040. D0( l' 1 'lylllt' t` r5 ` t ' It ' Ill I515 Illllovitto rs W h O N d W � O � O Apr 12 09 04 : 34p Hcc Environment Svc 352 # 473 # 91341 p . 1 Groundwater Remediation Constructiott Services 340 S . W. Jasmine Avenue (352) 473 9801 Keystone Heights , FL 32656 Fax ( 352) 473-9841 April 12, 2009 Geosyntec Consultants 6770 S . Washington Avenue, Suite 3 Titusville, FL 32780 Facsimile: 321 -26M813 ATTN: Emily Guyer RE . IRC UST removal Sherif'f' s Administration Bldg. 4055 41 Street Vero Beach, FL, 32960 HCC Biel #09-24 Dear Emily : UCC is pleased to provide you with bid quote for the removal of two 10,000 gallon UST as per your specifications provided for the above referenced site on your enclosed bid farm with the following conditions: 1 . Bid assumes there will be no contaminated soil frosn the excavation. Contaminated soil will be Dandled as additional work at an additional expense. 2. No dewatering is included in this bid. If water is encountered then the excavation will need to be backfilled with gravel to the water table. Geotextile fabric laid on top of the gravel and then backfilled with clean soil . Gravel will be provided for an additional $35 .00 per ton plus $ . 50 square foot for fabric . 3 . Existing canopy will remain in place. 4 . VAC truck services will be required for this job . The additional costs are $ 120. 00 per hour, portal to portal and rinsates and liquids disposed at $ . 65 per gallon. Estimated time for VAC truck services is 8 hours and liquids and rinsates are estimated at 600 - 800 gallons . S . Bid assumes that Indian River County will waive permit fees and that the TRC land fill will waive all tipping fees for concrete debris, construction debris and USTs. Apr 12 09 04 : 34p Hco Environment Svc 352 # 473 # 9841 p . 2 I 6 . The two 500 gallon AM are assumed to be installed and ready to startup with the exception of the items outlined in the scope of work. I 1 7 . No shoring or sheet piling of the excavation. We look forward to the successful completion of this project in the near future . If you have any questions or I can be of further assistance, please feel free to contact me at my office. Sincerely, / n ! I EARL IL HATCH, , President HCC ENVIRONMENTAL. SVS, ENC. 340 SW JASMINE AVE, KEYSTONE HEIGHTS f:L 326M SCHEDULE OF PRICES - SHERRIF'S OFFICE UST CLOSURE Bid Item Extended # Item Description Unit Unit Rate Quantify Cost 9 General rwi Provision of 40 Hr OSHA Training Certificates (and current 8- hour refreshers as applicable) for 00 1 . 1 Site Workers and Documentation of PSSC license LS $ # 1 .2 Secure and provide copies of construction permits for closure of two , 10, 000-gatlon USTs LS $ 1 . 3 110obilization LS $ 1A Demobilization LS I I i $ N 2 FIST Closure Activffies 2. 1 Sawcut, remove, and dispose of concrete over tank area LS $ 22pd 2.2 Blow out all product lines back to USTs LS $ 110<6c> 2.3 Excavate overburden and stockpile for fill material LS $ Lcm > Remove and dispose of any liquid/sludge residue in USTs (up to three, 55-gallon drums) j62- 2.4 761 .800(2) (a) 1 . a. PAC] LS C Purge tank of flammable vapors and monitor the tank with a combustible gas meter until 2.5 atmosphere in tank is less than 20% LEL LS $ o Remove and dispose of two, 10,000 gallon steel USTs and associated product piping at IRC _ ` 2 .6 Landfill no tipping fee) LS $ 0 r: 2 .7 Install a temporary monitoring well (provided by Geosytnec) in the center of the excavation LS $ 2 .8 Properly remove and dispose of existing fuel dis eftsers including drip pans) LS $ 2.9 Restore concrete in former dispenser area to existing grade ie-drip pan or sump LS $ Out and dispose of underground product and vent piping at edge of excavation & cap 162- 2 , 10 780 .800 (2) a 1 . t�t FACT L$ $ d 2� Backfill and compact area with existing fill material and supply balance to bring area to It 111 compacted subgrade LS $ Supply, install and broom finish an area up to 35 x 40 x 6° over the excavation area with 3 , 000 2912 psi fibermesh concrete L5 I I I $ 8� 0 0 2. 13 Clean area and dispose of all related construction debris at IRC Class I landdfill (no tipping fee) I LS I is N L Page 1 of 2 rz Q OCC ENVIRONMENTAL. SVS, INC. 340 SW JASMINE AVE. KEYSTONE HEIGHTS, FL 32656 SCHEDULE OF PRICES - SHERRIF' S OFFICE UST CLOSURE si Bid Item Extended # item Description Unit Unit Rate Quantity Cost: Fill out and submit Underground Storage Tank Installation and Removal Form for Certified 2. 14 Contractors, July 13 , 1898 [62J61 . 800(5) FAC] to Geosyntec LS $ Oc) 2415 Contingency units for additional cost of a vacuum truck if needed HR $ W 2. 16 lContingency units for additional square foot of concrete finished surface I SQ FT I Is of m 3 AST S em # Systems (with manufacturer provided pre-cast concrete pad and equipped with dispenser In 5 . 1 systems) LS $ W� Lt1MP SUM TOTAL I LS I Is 9 <iD •— Notes: 0 1 . LS Items to be reimbursed following completion of specific tasks in accordance with the specifications. U) 2 . SUBCONTRACTOR is responsible for soil/debris transportation to IRC Class I Landfill , disposal fees will be directly billed to IRC Utilities. c 3. The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards, v a r 0 L C W U U 2 tL S' m 0 m 0 N Page 2 of 2 L >Z Emily Guyer From : Lynn Morris [Imorris@feccorporation , comI Sent: Monday , April 13 , 2009 4 : 40 PM To : Emily Guyer ; Jim Langenbach Cc : Gordon Kirkland ; Angelo Ippolito ; Dwayne Kirkland ; Bryon Pazdur Subject : FECC Bid to Geosyntec - Titusville - IRC UST Closure at Sheriffs Administration Bldg Due 4/ 13/09 Attachments : Geosyntec - Titusville - IRC Sheriffs Office Schedule of Prices UST Closure 4- 13-09 . xls Dear Ms . Emily Guyer and Mr . Jim Langenbach of Geosyntec Consultants - Titusville office : I have attached an Excel file ( 2 pages ) , FECC's Schedule of Prices for UST Closure at the Indian River County Sheriffs Administration Building . FECC's Lump Sum Total price is $ 36 ,800 .00 . 1 . FECC' s estimate of the time of completion for UST closure activities is 6 working days , 2 . FECC' s anticipated cost for vac truck services and fluids disposal is : Vac Truck Portal to Portal is $ 110 . 00/Hour . Disposal of Non-Hazardous Liquids is $0 . 38/Gallon . 3 . Assumptions: • the budget does not include modifying the AST vents or the existing overhead canopy to accommodate the vent lines . If required , this will be handled as a change to the work scope , at an additional cost TBD . Thank you for the opportunity to bid on this important project . ,�,�later , Iksers •i:;. � 're. rla •rcr•i.; . �eltoodaaa::t'� •rtfaer . /;gee • �'r,> Fleere .he� •�•/oest �d. �ka •z -a•if `cRtf ItJ? �f - �'rtlP< fc+ �/F/ relelan P'ollaeffte; JSto VerfIr 11Y "6'9. 1195,10 ITCC, INC . dibla Florida Environmental Compliance Corporation 3652 Old minter Garclen 12oatl , Orlando, FI_. 32805 Phone 4071296- 99951x 207; VIX 407/296- 9125 Direct 407/ 101- 7285; F - iNlail : ad min(ri,feccorporafioli .com 1 SCHEDULE OF PRICES - INDIAN RIVER COUNTY SHERIFF' S OFFICE UST CLOSURE Submitted by : FECC , INC . , 3652 Old Winter Garden Road , Orlando , FL 32805 Phone 4071296-9995 x 201 Contact: Gordon Kirkland DATE : 4- 13- Bid Item Extended # Item DescriptionI, 1 Unit Unit Rate QuantityT Cost 7 General Provision of 40 Hr OSHA Training Certificates ( and current 8-hour refreshers as applicable ) for 1 . 1 Site Workers and Documentation of PSSC license LS $ 250 . 00 1 $ 250 . 00 1 . 2 Secure and provide copies of construction permits for closure of two, 10 , 000-gallon USTs LS $500 . 00 1 $ 500 . 00 1 . 3 Mobilization LS $2 , 500 . 00 1 $ 21500 . 00 1 . 4 IlDemobilization LS $ 1 , 000 . 00 1 $ 11000 .00 Iffeel 2 UST Closure Activities 2 . 1 Sawcut, remove, and dispose of concrete over tank area LS $ 3, 000 . 00 1 $ 3 ,000 .00 2 . 2 Blow out all product lines back to USTs LS $ 1 , 000 .00 1 $ 1 , 000 .00 2 . 3 Excavate overburden and stockpile for fill material LS $3 , 000 .00 1 $ 3 , 000 . 00 Remove and dispose of any liquid/sludge residue in USTs ( up to three, 55-gallon drums ) [62- 2 . 4 761 . 800 ( 2 )( a ) 1 . a , ACJ LS $ 1 , 250 .00 1 $ 15250 .00 Purge tank of flammable vapors and monitor the tank with a combustible gas meter until 2 . 5 atmosphere in tank is less than 20 % LEL LS $800 . 00 1 $ 800 .00 Remove and dispose of two , 10 , 000 gallon steel USTs and associated product piping at IRC 2 . 6 Landfill ( no tipping fee) LS 1 $4, 500 . 00 1 $ 47500 . 00 2 . 7 Install a temporary monitoring well ( provided by Geosytnec) in the center of the excavation LS $ 150 . 00 1 $ 150 . 00 2 . 8 Properly remove and dispose of existing fuel dispensers ( including drip pans ) LS $ 1 , 650 .00 1 $ 1 , 650 . 00 2 .9 Restore concrete in former dispenser area to existing grade ( ie-drip pan or sump ) LS $ 19000 . 00 1 $ 12000 . 00 Cut and dispose of underground product and vent piping at edge of excavation & cap [62- 2 . 10 780 . 800(2)( a ) 1 . b . FACT LS $800 . 00 1 $ 800 .00 Backfill and compact area with existing fill material and supply balance to bring area to compacted LS $ 3 , 800 . 00 1 $ 3 , 800 . 00 2 . 11 subgrade Supply , install and broom finish an area up to 35 x 40 x 6" over the excavation area with 3 , 000 psi 2 . 12 fibermesh concrete I LS $7, 350 .00 1 $ 71350 . 00 2 . 13 Clean area and dispose of all related construction debris at IRC Class I landfill ( no tipping fee) LS $600 . 00 1 $ 600 . 00 Page 1 of 2 SCHEDULE OF PRICES - INDIAN RIVER COUNTY SHERIFF ' S OFFICE UST CLOSURE Submitted by : FECC , INC . , 3652 Old Winter Garden Road , Orlando , FL 32805 Phone 4071296-9995 x 201 Contact: Gordon Kirkland DATE : 4 - 13- Extended Bid Item Unit Unit Rate Quantity Cost # item Description Fill out and submit Underground Storage Tank Installation and Removal Form for Certified 2 . 14 Contractors , July 13, 1998 [62-761 .900 ( 5 ) FAC] to Geosyntec LS $ 150 .00 1 1 $ 150 . 00 2 . 15 Contingency units for additional cost of a vacuum truck if needed HR $ 110 .00oil 2 . 16 Contingency units for additional square foot of concrete finished surface SQ FT $ 5 . 25 5 AST System Electrical connection and operational checkout of two, IRC provided , 500-gallon ConVault AST Systems (with manufacturer provided pre-cast concrete pad and equipped with dispenser LS $ 3 , 500 . 00 1 $ 3 , 500 00 5 . 1 systems ) $ LUMP SUM TOTAL LS 36,800 . 00 Notes : 1 , LS Items to be reimbursed following completion of specific tasks in accordance with the specifications . 2 . SUBCONTRACTOR is responsible for soil/debris transportation to IRC Class 1 Landfill , disposal fees will be directly billed to IRC Utilities , 3 . The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards . Page 2 of 2 Ilk l SCHEDULE OF PRICES - SHERRIF'S OFFICE UST CLOSURE Bid Item Extended # Item Description Unit Unit Rate Quanti Cost ffGeneral Provision of 40 Hr OSHA Training Certificates (and current 8-hour refreshers as applicable) for Site Workers and Documentation of PSSC licenseLS $ 100 . 00 1 $ 100 . 00 Secure and provide copies of construction permits for closure of two , 10 , 000-gallon USTs LS $ 500 . 00 1 $ 500 . 00 1 . 3 Mobilization LS $ 11000 . 00 1 $ 11000 . 00 1 .4 Demobilization L 1 , 000000 S $ 1 , 000 . 00 1 $ I Ilk Ilk dk 2 UST Closure Activities 2 . 1 Sawcut, remove , and dispose of concrete over tank area LS $ 750 . 00 1 $ 750 . 00 2 .2 Blow out all product lines back to USTs LS $ 500 . 00 1 $ 500 . 00 2 . 3 Excavate overburden and stockpile for fill material LS $ 750 . 00 1 $ 750 . 00 Remove and dispose of any liquid/sludge residue in USTs ( up to three , 55-gallon drums) [62- 2.4 761 . 800 (2) (a) 1 . a , FAC] LS $ 675 . 00 1 $ 675 .00 Purge tank of flammable vapors and monitor the tank with a combustible gas meter until 2 . 5 atmosphere in tank is less than 20 % LEL LS $ 500 .00 500 . 00 1 $ Remove and dispose of two , 10 ,000 gallon steel USTs and associated product piping at IRC 2 .6 Landfill (no tipping fee) LS $ 7 , 000 . 00 $ 7 , 000 .00 1 2 .7 Install a temporary monitoring well (provided by Geosytnec) in the center of the excavation LS $ 250 . 00 1 $ 250 . 00 2 . 8 Properly remove and dispose of existing fuel dispensers (including drip pans) LS $ 500 . 00 1 $ 500 . 00 2 , 9 Restore concrete in former dispenser area to existing grade (ie-drip pan or sump) LS $ 500 . 00 1 $ 500 . 00 Cut and dispose of underground product and vent piping at edge of excavation & cap [62- 2 . 10 780 .800 (2) (a) l . b . FAC] LS $ 500 . 00 1 $ 500 . 00 Backfill and compact area with existing fill material and supply balance to bring area to compacted LS $ 2 , 000 . 00 1 $ 22000 . 00 2 . 11 subgrade Supply , install and broom finish an area up to 35 x 40 x 6" over the excavation area with 3 , 000 psi LS $ 7t350 , 00 t $ 71350 . 00 2 . 12 fibermesh concrete Page 1 of 2 ff SCHEDULE OF PRICES - SHERRIF ' S OFFICE UST CLOSURE Extended Bid Item Unit Unit Rate Quanti Cost # Item Description 2 . 13 Clean area and dispose of all related construction debris at IRC Class I landdfill ( no tipping fee) LS $ 500 . 00 1 $ 500 . 00 Fill out and submit Underground Storage Tank Installation and Removal Form for Certified 250 . 00 2 . 14 Contractors , July 13 , 1998 [62m761 * 900 (5) FAC] to Geosyntec LS $ 250 . 00rr 1 $ Yzr G f 2 . 15 Contingency units for additional cost of a vacuum truck if needed HR 125 . 00 plus 2 . 16 lContingency units for additional square foot of concrete finished surface SQ FT $ 5 , 25 y;. 5 AST System Electrical connection and operational checkout of two , IRC provided , 500-gallon ConVault AST Systems (with manufacturer provided pre-cast concrete pad and equipped with dispenser 11500 .00 5 . 1 systems77 ) LS $ 1 , 500 00 1 $ LUMP SUM TOTAL LS $ 263125.00 Notes : 1 . LS Items to be reimbursed following completion of specific tasks in accordance with the specifications . 2 . SUBCONTRACTOR is responsible for soilldebris transportation to IRC Class I Landfill , disposal fees will be directly billed to IRC Utilities . 3 . The SUBCONTRACTOR bid shall include written assurance that SUBCONTRACTOR will comply with the applicable trench safety standards . If the tank is not empty , the vac truck will get the fuel out of the tank. That would be an extra . PR&D has included a vac truck to evacuate the sludge & clean the tank inplace , prior to removal . PR& D will comply with statement # 3 above . I ` Estimated 1 week on site . Page 2 of 2 M � w o � o v � a H w w Geosyntec Consultants Table 1 Summary of Estimated Costs Indian River County Sheriff s Office UST Closure, AST Connection and Reporting Labor Direct External Task Task Description Hours Labor Expenses Expenses Total Cost 25 $3 , 317 $76 $ 3 , 393 A Preliminary Activities 376 $42 ,22Q B UST Closure Field Activities and AST Conn 81 $ 87739 $2, 106 $31 , $6 ,209 C UST Closure Report 57 $5 , 954 $55 Subtotal 163 $ 189010 $25237 $31 ,376 $51 ,623 Contingency on Task B 20 % $ 1 ,748 $42120 $ 67275 . 12 $ 8 ,444 TOTAL ESTIMATED COST INCLUDING CONTINGENCY $60,067 Notes: 1 . Labor cost includes 3 % communications fee applied to labor subtotal . 2 . Contingency costs are intended to cover potential disposal of tank sludge, vacuum track removal of residual fuel from the USTs, or additional concrete beyond 30 ft by 35 ft by 6-inches thick. No contingency work will be completed without prior IRC approval. 3 . Costs for tank and C&D debris do not include IRC landfill tipping fees , it is anticipated that this cost will be administered internally by IRC . 4. Costs are not included for AST system purchase . Page i of 1