HomeMy WebLinkAbout2004-037 ORIGINAL /
621 N . W. 53rd Street , Suite 650
GEOSYNTEC CONSULTANTS Boca Raton , Florida 33497 • USA
Tel . ( 561 ) 995 -09000 • Fax (561 ) 995 - 0925
9 February 2004
Mr. Tanhum Goldshmid
Solid Waste Disposal District, Indian River County
1325 74th Avenue Southwest
Vero Beach, Florida 32968
Subject: Proposal to Redevelop the Groundwater Monitoring
Wells at Four Closed Landfills and the Active
Class I Landfill in Indian River County
Dear Mr. Goldshmid :
As you requested, GeoSyntec Consultants (GeoSyntec) has prepared this proposed
scope of work to redevelop the groundwater monitoring wells at the four closed landfills
(Wabasso , Oslo, South Winter Beach, and Roseland Landfills) and the active Class I
landfill located in Indian River County (IRC) . The scope of work described herein will be
implemented in accordance with the Professional Services Agreement between GeoSyntec
and IRC Solid Waste Disposal District, Contract Number 9902 . A new GeoSyntec project
number (FR0587) will be assigned to this scope of work. The remainder of this letter
provides a description of the proposed scope of work, a discussion of the schedule, and a
budget estimate to accomplish the work described herein.
PROPOSED SCOPE OF WORK
Field Work
GeoSyntec will redevelop each groundwater monitoring well at the four closed
landfills, including :
• six groundwater monitoring wells at Roseland Landfill ;
• five groundwater monitoring wells at South Winter Beach Landfill;
• eight groundwater monitoring wells at Wabasso Landfill ;
• nine groundwater monitoring wells at Oslo Landfill ; and
• thirty groundwater monitoring wells at the active Class I Landfill. 9101172137
XR04025/Well-Development.DOC
M
to
lFEB
N
�� FEGE��I� titi
�� RECYCLED AND RECYCLABLE ������f171�.� ����
GEOSYNmc CONSULTANTS
Mr. Tanhum Goldshmid
9 February 2004
Page 2
Prior to redevelopment, GeoSyntec ' s field technician will surged each well using a
surge-block (i . e. , a device for cleaning the inside of the well and flushing water in and out
of the filter pack) . The purpose of the surge block is to loosen particles, which may be
adhered to the inside of the well casing. The surge block will also force groundwater in
and out of the well screen and filter pack to increase conductivity between the well, filter
pack, and aquifer. Following surging, GeoSyntec ' s field personnel will redevelop each
groundwater monitoring well using a 2-in. centrifugal pump (or equivalent) .
Approximately 10 to 15 well volumes will be pumped from each well to remove
suspended particles from the water column. During redevelopment, GeoSyntec will
monitor flow rate, pumping time, and water quality parameters (i . e. , temperature, pH, and
turbidity) . Each well will be pumped until the field parameters have stabilized.
GeoSyntec has assumed that field parameters will stabilize within one hour. If field
parameters have not stabilized within one hour, IRC will be contacted to discuss potential
strategies. Field forms documenting the redevelopment activities will be prepared.
GeoSyntec will also record the physical condition of each well, including damage or
repairs that may be required. In anticipation of the need to replace some of the monitoring
well caps, GeoSyntec will also provide 20 new locking well caps. Monitoring well caps
not used will be provided to IRC for future use.
Reporting
The results of the well development activities will be summarized in a letter report that
will include a summary of the field work, applicable field notes and observations, and a list
of recommendations, if any.
SCHEDULE
GeoSyntec understands IRC ' s desired to complete the well redevelopment activities
by the end of February; therefore, GeoSyntec is proposing to utilize two one-man crews
and anticipates it will take four and a half days to complete the project. We are prepared to
begin implementation of the field activities on 23 February 2004 .
XR04025/Well-Development.DOC
40 RECYCLED AND RECYCLABLE
r
GEOSYNTEC CONSULTANTS
Mr. Tanhum Goldshmid
9 February 2004
Page 3
BUDGET ESTIMATE
GeoSyntec estimates that the services outlined in this scope of work can be
accomplished for $ 11 , 700. A detailed budget estimate is provided as Attachment A.
CLOSURE
If this proposal is acceptable to you, please indicate your agreement by signing the
attached work authorization (Attachment B), which references this proposal . Please return
one signed work authorization to Mr. Riotte ' s attention.
We look forward to continuing to work with you on this project. If you have any
questions or comments, please feel free to contact either of the undersigned.
Sincerely,
4&xv t
David W. Riotte, P . E .
Project Engineer
Nandra D . Weeks, P .E .
Associate
Attachments
XR04025/Well-Development.DOC
€, RECYCLED AND RECYCLABLE
ATTACHMENT A
BUDGET ESTIMATE
GeoSyntec Consultants
Proposal Information Sheet
Proposal number: XR03035
Estimated by: David W . Riotte
Scope of Work: Well Development
Client : Indian River County
Location : Four Closed Landfill and Active Class I Landfill
Task Task Description
1 Well Development
XR04025/Well Development. xls Page 1 of 5 2/9/2004
GeoSyntec Consultants
Detail Labor Cost Summary Spreadsheet
Associate/ Senior Project Project Assistant Senior Staff Word Admin Total Direct Loaded
Principal Engineer Engineer Proj . Eng . Eng/Hydro Processor Clerical Hours Cost Cost
Direct Labor Rate : $ 52 .41 $44 . 34 $ 30 . 81 $23 . 22 $22 . 11 $ 17 .47 $ 14 . 83
Task 1 : Well Labor Hours 2 18 3 80 2 4 109
Development Cost Subtotal $ 104 . 82 $ 554 . 58 $ 69 . 66 $ 15768 . 80 $ 34 . 94 $ 59 . 32 $ 2 , 592 . 12 $
85269
Total Labor Hours 2 18 3 80 2 4 109
Raw Labor Cost $ 104 . 82 $ 554 . 58 $69 . 66 $ 15768 . 80 $ 34 . 94 $ 59 . 32 $2 , 592 . 12
Overhead Cost (x2 . 19) $229 . 56 $ 15214 . 53 $ 152 . 56 $ 33873 . 67 $ 76 . 52 $ 129 . 91 $ 51676 . 74
Total Labor Cost ' $334.38 $ 1 ,769. 11 $222 . 22 $5,642 .47 $ 111 .46 $ 189 . 23 $8,269
Notes:
1 . Total cost has been rounded to nearest hundred dollar, as requested by Indian River County.
XR04025/Well Development.xls Page 2 of 5 2/9/2004
• • i
,IDIUCT EXPENSES
" rr v� x .u ' Wxr rS Y � H f �{ � Y �, f •. FIRM`Y Ir r�.�.lrr^YiYJr�'i>ti+ : �y . '
": : - ,+ � . m• a,n,4Y�
Copies '
' Copies . 12
11
, Plots (24 x • 11
Copies - $ 3 . 00
iCerlox each WOO
iCustom1 • per • 11
Transparencies, • 1
lFax
each $ 0 . 50
' Photos Electronic ■ 11
Diskettes, each 1
Compuw Time • / 1
11 11f ,iy 1 ♦ f ., at ' ' i �: � il'{i{
y �
• yll � ' 9 wA , : ! v 44rws 'YV.r.�r ui
Overnight • •Overntught 1
• . 11.
's��i"Y F'Y �T'1 r t 'F �f* Y , "+S'i"4 7'e .ruh I : d ♦ + �,n
i +SAir,•y!
' i
b1n
4"�L, "1 �. aL�� a ♦ 1.. Y- ._.a �11hYIL �. J' S.!— � �' LL•NJF �yYf JRiala �'. 1rYlxY a.V
Field • ' • • 11 1 1 •
i
' Per Diem • , 11
', Lodgingday $91925
• I
1
GeopSyntec Consultants
SUBCONTRACTOR Unit/ Total
EXPENSES Matrix Unit Cost Task 2 Total Cost
Units
N (i " iv is dpi ii& 'ctt� "
yti�g `�� tiIPE'.
Centrifical Pump day $ 50 . 00 10 10 $ 500
Surge Block each $ 125 . 00 2 2 $ 250
Well caps each $ 10 . 00 20 20 $ 200
Water Quality Meter week $ 125 . 00 2 2 $ 250
PID week $ 220 . 00 0 $ 0
Teflon lined tubing ft $2 . 20 0 $ 0
0 . 45 µ filters each $ 15 . 95 0 $ 0
Silicon Tubing ft $2 . 75 0 $ 0
Water Level Meter week $ 55 . 00 2 2 $ 110
Shipping (equipment) each $ 60 . 00 0 $ 0
Misc Field Supplies day $ 30 . 00 8 8 $240
Total Equipment
(sum of unit cost * number of units) $ 1 ,550 44 $ 1 ,550
Summary of Subcontractor Expenses $ 19550 44 $ 1 ,550
Subcontractor expenses include 10 % markup per contract.
XR04025/Well Development.xls Page 4 of 5 2/0/2004
GeoSyntec Consultants
Summary of Estimated Costs
Indian River County
Well Development
Labor Labor Direct Subcontract
Task Task Description Total Cost
Hours Expenses Expenses or Expenses
1 Well Development 109 $ 8 ,269 $ 17881 $ 15550 $ 119700
Total 109 $8,269 $ 1 ,881 $ 1 ,550 $ 11 ,700
Notes:
1 . Labor expenses include raw and overhead costs .
2 . Total cost has been rounded to nearest hundred dollar, as requested by Indian River County
XR04025/Well Development . xls Page 5 of 5 2/9/2004
ATTACHMENT B
WORK AUTHORIZATION
WORK AUTHORIZATION No. 9902 _ 0 9
EFFECTIVE DATE February 24 . 2004
In accordance with the Agreement for Professional Services between Indian River County Solid
Waste Disposal District ("Client"), and GeoSyntec Consultants, Inc . ("GeoSyntec"), dated 22
June 1999, this Work Authorization describes the services, schedule, and charges for
GeoSyntec ' s services on the project known as :
Redevelop the eroundwater monitorine wells at the four closed landfills (Wabasso Oslo South
Winter Beach, and Roseland Landfills) and the Active Class I landfill
Client Authorized
Representative: Mr. Tanhum Goldshmid, Solid Waste Disposal District
Address : 1325 74`h Avenue. S .W. ,
Vero Beach, Florida 32968
Telephone No : (561 ) 770-5113 1100
0.
GeoSyntec Authorized
W
> -
Representative: Ms . Nandra Weeks or Mr. David W. Riotte O
Address : 621 Northwest 53'd Street, Suite 650 C
Boca Raton, Florida 33487 c�
Telephone No : (561 ) 995 -0900z
Cr
0 z x
,L w o
FM-
O — a
SERVICES. The scope of services, time schedule and charges are described in GeoSyntec ' s W
proposal dated 9 February 2004 attached to this Work Authorization, incorporated herein by 0 z M
reference. a U
q �
a �
TERMS AND CONDITIONS . The terms and conditions of the Professional Services y
Agreement referenced above shall apply to this Work AuthorizationIL
. z �,
¢ ¢ a
Acceptance of the terms of this Work Authorization is acknowledged by the following signatures
of the Authorized Representatives ,
SUBMITTED BY: APPROVED BY:
GEOSYNTEC CONSULTANTS INDIAN RIVER COUNTY, FLORIDA
(Consultant) Solid Waste Disposal District ;
t
By:
Thomas A. Peel, Ph.D. , Caroling D . Ginn
Secretary Chairman
BCC Approved : 02 - 24 - 2004
Witnessed by: Attest: J.K. Barton, Clerk
By:
David W. Riotte, P .E . beputy Clerk
XR04025AVell-Development. DOC