HomeMy WebLinkAbout2005-011B Jr1 }
INDIAN RIVER COUNTY { `
PUBLIC WORKS DEPARTMENT
PROJECT #7018
PROFESSIONAL GEOTECHNICAL SERVICES AGREEMENT
FOR ANNUAL PROFESSIONAL GEOTECHNICAL ENGINEERING
SERVICES
THIS AGREEMENT , entered into this 4th day of January , 2005 , by and
between INDIAN RIVER COUNTY, a political subdivision of the State of Florida ,
hereinafter referred to as the "COUNTY" , and DUNKELBERGER ENGINEERING &
TESTING , INC . , hereinafter referred to as the "GEOTECHNICAL PROFESSIONAL" .
WITNESSETH
That the COUNTY and the GEOTECHNICAL PROFESSIONAL , in consideration
of their mutual covenants , herein agree with respect to the performance of professional
geotechnical and testing services by the GEOTECHNICAL PROFESSIONAL , and the
payment for those services by the COUNTY, as set forth below and in individual Work
Orders . This agreement shall be referred to as the " MASTER AGREEMENT" under
which future Work Orders will apply .
The GEOTECHNICAL PROFESSIONAL shall provide the COUNTY with
professional geotechnical and testing services and such other related services as
defined in specific Work Orders , in all phases of each project . The GEOTECHNICAL
PROFESSIONAL shall serve as the COUNTY' s professional representative for the
project as set forth in each Work Order, and shall give professional geotechnical advice
to the COUNTY during the performance of the services to be rendered .
SECTION I — PROJECT LIMITS
Project limits shall be identified in individual Work Orders prepared by the
COUNTY and approved by the GEOTECHNICAL PROFESSIONAL . Each Work Order
will be sequentially numbered and formally approved by the COUNTY prior to a Notice-
to- Proceed being issued .
Basic services required of the GEOTECHNICAL PROFESSIONAL for the project
will be described in other appropriate sections of this Agreement and in individual Work
Orders .
SECTION 11 — COUNTY OBLIGATIONS
The COUNTY agrees to provide the following material , data , or services as
required in connection with the work to be performed under this Agreement :
A . Provide the GEOTECHNICAL PROFESSIONAL with a copy of any
pertinent preliminary data or reports available to the COUNTY.
B . Provide the GEOTECHNICAL PROFESSIONAL with all reasonably
available drawings , surveys , right-of-way maps , and other documents in
the possession of the COUNTY that are pertinent to the project .
1
C :\DOCUME� l \WORKST� l \LOCALS~ l \TEMPORA \7018 AGREEMENT-Dunkelberger Engineering. doc
C . The COUNTY shall be responsible for obtaining only those permits
required to perform the work to complete the project , if such permit
requirements are made into law and established by regulatory agencies
after the effective date of the Work Order.
D . The COUNTY shall make all provisions for the GEOTECHNICAL
PROFESSIONAL to enter upon public or private property as reasonably
required for the GEOTECHNICAL PROFESSIONAL to perform his
services .
E . The COUNTY shall supply the GEOTECHNICAL PROFESSIONAL with
copies of all applicable local codes and regulations .
SECTION III — SCOPE OF SERVICES
The GEOTECHNICAL PROFESSIONAL agrees to perform all necessary
professional geotechnical and testing services and other pertinent services in
connection with the assigned project as required and as set forth in the following :
A . General
1 . The GEOTECHNICAL PROFESSIONAL will endeavor not to
duplicate any previous work done on any project . Before issuance
of a Work Order and written authorization to proceed , the
GEOTECHNICAL PROFESSIONAL shall consult with the COUNTY
to clarify and define the COUNTY' s requirements for the project
and review all available data .
2 . The GEOTECHNICAL PROFESSIONAL shall attend conferences
with the COUNTY and its representatives , upon request .
3 . In order to accomplish the work described under this Agreement
under the time frames and conditions set forth in this Agreement,
the GEOTECHNICAL PROFESSIONAL shall :
a . Complete work on the project within the time allowed by
maintaining an adequate staff of registered professional
geotechnical engineers and technicians and other
employees on the work at all times .
b . Comply with all federal , state , and local laws applicable to
this project( s ) . The GEOTECHNICAL PROFESSIONAL
work product shall conform with all applicable federal , state
and local laws applicable to this project(s) .
c . The GEOTECHNICAL PROFESSIONAL shall cooperate
fully with the COUNTY in order that all phases of the work
may be properly scheduled and coordinated .
4 . All original documents ( copy of) , survey notes , tracings , and the
like , including all items furnished to the GEOTECHNICAL
PROFESSIONAL by the COUNTY pursuant to this Agreement, are
and shall remain the property of the COUNTY, and shall be
delivered to the COUNTY upon completion of the work.
5 . Compensation to the GEOTECHNICAL PROFESSIONAL for basic
services shall be in accordance with each Work Order, as mutually
agreed upon by the GEOTECHNICAL PROFESSIONAL and the
2
C :\DOCUME� l \WORKST� l \LOCALS� l \TEMPORA \7018 AGREEMENT-Dunkelberger Engineering .doc
COUNTY. Current fee schedule is included in " Exhibit A" attached ,
and will be included as part of each Work Order when approved .
SECTION IV — TIME FOR COMPLETION
The time for completion of each - project shall be defined in the Work Order.
SECTION V — COMPENSATION
The COUNTY agrees to pay, and the GEOTECHNICAL PROFESSIONAL
agrees to accept , for services rendered pursuant to this Agreement, fees in accordance
with the following :
A . Professional Services Fee an The basic compensation shall be mutually
agreed upon by the GEOTECHNICAL PROFESSIONAL and the COUNTY
prior to issuance of each Work Order, and the amount shall be included in
the Work Order to be formally approved by the Board of County
Commissioners .
Be Direct Payment for Certain Services - The COUNTY agrees to pay on a
direct basis for services or goods provided by others working in
conjunction with the GEOTECHNICAL PROFESSIONAL , as follows :
1 . NONE
SECTION VI — ADDITIONAL SERVICE WORK
Additional service work occurs when the COUNTY requests changes after it has
formally approved this Agreement . Additional service work shall not commence until a
Work Order for the additional work has been formally issued by the County Public
Works Director or his designee , and formally approved by the Board of County
Commissioners , and the additional service work shall be performed in accordance with
the fee schedule set forth in that Work Order.
SECTION VII — CHANGE IN THE PROJECT SCOPE AFTER A WORK ORDER HAS
BEEN EXECUTED
If the project scope is changed after a Work Order has been executed , such work
shall be the subject of a Supplemental Work Order formally approved by the Board of
County Commissioners ,
SECTION VIII — PAYMENTS
The COUNTY shall make monthly partial payments Pursuant to Florida Prompt
Payment Act ( F . S . 218 . 70 ) to the GEOTECHNICAL PROFESSIONAL as provided for in
the Work Order. A ten percent ( 10 % ) retainage shall be withheld by the COUNTY for all
work orders over $ 10 , 000 . 00 , until all of the GEOTECHNICAL PROFESSIONAL ' s work
is completely accepted by the COUNTY . If work is held up on the project for six months
or greater due to no fault of the GEOTECHNICAL PROFESSIONAL , the
GEOTECHNICAL PROFESSIONAL may request release of the accumulated retainage .
Unless otherwise stated in the Work Order, the GEOTECHNICAL
PROFESSIONAL shall submit duly certified invoices in triplicate to the County Public
Works Director.
3
C :\DOCUME~ 1 \WORKST� l \LOCALS~ l \TEMPOR~ 1 \7018 AGREEMENT-Dunkelberger Engineering.doc
The Agreement shall be divided into units of deliverables , which shall include , but
not be limited to , reports , findings , recommendations , and test results , that must be
received and accepted in writing by the County Public Works Director, prior to payment .
SECTION IX — RIGHT OF DECISIONS
All services shall be performed by the GEOTECHNICAL PROFESSIONAL to the
satisfaction of the County Public Works Director who shall decide all questions ,
difficulties , and disputes of whatever nature that may arise under or by reason of this
Agreement , according to the prosecution and fulfillment of the service hereunder, and
the character, quality , amount and value thereof. The COUNTY' s decision upon all
claims , questions , and disputes shall be final , conclusive , and binding upon the parties
hereto , unless such determination is clearly arbitrary or unreasonable .
Adjustments of compensation and contract time because of any major changes
in the work that might become necessary or be deemed desirable as the work
progresses shall be reviewed by the County Public Works Director. If the
GEOTECHNICAL PROFESSIONAL does not concur in the judgment of the County
Public Works Director as to any decisions made by him or her, it shall present its written
objections to the County Administrator of Indian River County , who shall make a
decision , and the GEOTECHNICAL PROFESSIONAL shall abide by the County
Administrator' s decision , unless the decision is clearly arbitrary or unreasonable .
SECTION X — OWNERSHIP AND REUSE OF DOCUMENTS
A . Ownership and Copyright : Ownership and copyright of all reports , test
results , and other data developed by the GEOTECHNICAL
PROFESSIONAL pursuant to this Agreement, shall be vested in the
COUNTY . Said materials shall be made available to the COUNTY by the
GEOTECHNICAL PROFESSIONAL at any time upon request of the
COUNTY . On or before the tenth day after all work contemplated under
this Agreement is complete , all of the above materials shall be delivered to
the County Public Works Director
Be Reuse of Documents : All documents , including but not limited to reports
and tests , prepared or performed by the GEOTECHNICAL
PROFESSIONAL pursuant to this Agreement, are related exclusively to
the services described herein . They are not intended or represented to be
suitable for reuse by the COUNTY or others on extensions of this project
or on any other project . The COUNTY' s reuse of any document shall be
at the COUNTY' s own risk . The COUNTY shall not hold the
GEOTECHNICAL PROFESSIONAL liable for any misuse by others .
SECTION XI — NOTICES
Any notices , reports or other written communications from the GEOTECHNICAL
PROFESSIONAL to the COUNTY shall be considered delivered when posted by
certified mail or delivered in person to the County Public Works Director. Any notices ,
reports or other communications from the COUNTY to the GEOTECHNICAL
PROFESSIONAL , shall be considered delivered when posted by certified mail to the
GEOTECHNICAL PROFESSIONAL at the last address left on file with the COUNTY or
delivered in-person to said GEOTECHNICAL PROFESSIONAL or its authorized
representative .
4
C :\DOCUME~ 1 \WORKST� l \LOCALS� l \TEMPORA \7018 AGREEMENT-Dunkelberger Engineering. doc
SECTION XII - TERMINATION
Either party may terminate this Agreement upon seven ( 7 ) days written notice to
the other party , except if the GEOTECHNICAL PROFESSIONAL terminates this
Agreement , such termination shall not be effective , absent the COUNTY' s consent , until
the GEOTECHNICAL PROFESSIONAL ' S completion to the COUNTY' s satisfaction , of
any pending Work Order.
SECTION XIII - GEOTECHNICAL PROFESSIONAL' S PERSONNEL ASSIGNED TO
THE PROJECT
The COUNTY shall have the right of approval of all GEOTECHNICAL
PROFESSIONAL ' s personnel assigned to any COUNTY project . Therefore , any
subsequent changing of assigned personnel to any COUNTY project shall also be
subject to COUNTY approval . Failure to adhere to this policy shall be considered a
cause for contract termination .
SECTION XIV - AUDIT RIGHTS
The COUNTY reserves the right to audit the records of the GEOTECHNICAL
PROFESSIONAL related to this Agreement at any time during the prosecution of the
work included herein and for a period of three years after final payment is made .
SECTION XV - SUBLETTING
The GEOTECHNICAL PROFESSIONAL shall not sublet , assign , or transfer any
work under this Agreement without the written consent of the COUNTY . When
applicable and upon receipt of such consent in writing , the GEOTECHNICAL
PROFESSIONAL shall cause the names of the engineering and geotechnical firms
responsible for the major portions of each separate specialty of the work to be inserted
on the reports or other data .
SECTION XVI - WARRANTY
The GEOTECHNICAL PROFESSIONAL warrants that it has not employed or
retained any company or person other than a bona fide employee working solely for the
GEOTECHNICAL PROFESSIONAL , to solicit or secure this Agreement , and that it has
not paid or agreed to pay any company or person other than a bona fide employee
working solely for the GEOTECHNICAL PROFESSIONAL any fee , commission ,
percentage fee , gifts or any other considerations , contingent upon or resulting from the
award or making of this Agreement . For the GEOTECHNICAL PROFESSIONAL
breach of violation of this warranty , the COUNTY shall have the right to annul this
Agreement without liability .
SECTION XVII - DURATION OF AGREEMENT
This Agreement shall remain in full force and effect for a period of one year after
the date of execution thereof, or until completion of all project phases as defined by the
County Public Works Director, whichever occurs first , or unless otherwise terminated by
mutual consent of the parties hereto , or terminated pursuant to Section XI I -
"Termination . " This Agreement may be extended for three additional one year
increments at the discretion of the COUNTY .
5
C :\DOCUME� l \WORKST� l \LOCALS� l \TEMPORA \7018 AGREEMENT-Dunkelberger Engineering.doc
SECTION XVIII — INSURANCE
During the performance of the work covered by this Agreement , the
GEOTECHNICAL PROFESSIONAL shall provide the COUNTY with evidence that the
GEOTECHNICAL PROFESSIONAL has obtained and maintains the insurance listed in
the Agreement .
1 . GEOTECHNICAL PROFESSIONAL shall procure and maintain for the
duration of the Agreement , insurance against claims for injuries to persons
or damages to property which may arise from or in connection with the
performance of the work hereunder by the GEOTECHNICAL
PROFESSIONAL , its agents , representatives , employees or
subcontractors . The cost of such insurance shall be included in the
GEOTECHNICAL PROFESSIONAL ' s fees .
2 . Minimum Scope of Insurance (for fees less than $ 500 , 000 ) :
A . Worker' s Compensation as required by the State of
Florida . Employers Liability of $ 100 , 000 each accident ,
$ 500 , 000 disease policy limit , and $ 100 , 000 disease each
employee .
Be General Liability $ 1 , 000 , 000 combined single limit per
accident for bodily injury and property damage . Coverage
shall include premises/operations , products/completed
operations , contractual liability , and independent
contractors . COUNTY shall be named an "Additional
Insured " on the certificate of insurance .
C . Auto Liability $ 500 , 000 combined single limit per accident
for bodily injury and property damage . Coverage shall
include owned vehicles , hired vehicles , and non -owned
vehicles . COUNTY shall be named an "Additional Insured "
on the certificate of insurance .
D . Professional Liability Insurance providing coverage for
negligent acts , errors , or omissions committed by
GEOTECHNICAL PROFESSIONAL with a $500 , 000 per
claim/annual aggregate . This insurance shall extend
coverage to loss of interest , earning , profit , use and
business interruption , cost of replacement power, and
other special , indirect , and consequential damages .
3 . GEOTECHNICAL PROFESSIONAL' s insurance coverage shall be
primary .
4 . All above insurance policies shall be placed with insurers with a Best' s
rating of no less that A-VII . The insurer chosen shall also be licensed to
do business in Florida .
5 . The insurance policies procured , other than professional liability , shall be
occurrence forms , not claims made policies . Professional liability shall be
. on a claims- made basis .
6 . The insurance companies chosen shall provide certificates of insurance
prior to signing of contracts , to the Indian River County Risk Management
Department,
7 . Each insurance company shall provide the Indian River County Risk
Management Department with a certificate of insurance that states that
6
C :\DOCUME� I \WORKST� 1 \LOCALS~ 1 \TEMPOR~ 1 \7018 AGREEMENT-Dunkelberger Engineering.doc
the insurance company will provide 30 days notice to the Risk
Management Department , of its intent to modify or cancel said policies of
insurance . Such notice shall be in writing by registered mail , return receipt
requested , and addressed to the Risk Manager of the Risk Management
Department.
8 . The GEOTECHNICAL PROFESSIONAL shall include all sub-contractors
as insured under its policies or shall furnish separate certificates and
endorsements for each subcontractor. All coverages for subcontractors
shall be subject to all of the requirements stated herein .
9 . Any deductibles or self-insured retentions greater than $ 5 , 000 must be
approved by the Risk Manager for Indian River County with the ultimate
responsibility for same going to the GEOTECHNICAL PROFESSIONAL .
SECTION XIX - INDEMNIFICATION
GEOTECHNICAL PROFESSIONAL hereby agrees to indemnify , and hold
harmless , the COUNTY , and the COUNTY' s officers , employees and agents , from and
against any and all claims from liabilities , damages , losses , costs , third party claims ,
judgments , and expense to persons or property , including reasonable attorneys' fees , to
the extent caused by the negligence , recklessness , or intentionally wrongful conduct of
GEOTECHNICAL PROFESSIONAL , or of GEOTECHNICAL PROFESSIONAL ' s
officers , employees , or agents , and GEOTECHNICAL PROFESSIONAL shall indemnify
the COUNTY against any such claims and any judgments that may be entered in
connection therewith , including reasonable attorneys' fees .
SECTION XX — SAFETY
The GEOTECHNICAL PROFESSIONAL is solely responsible for any job site
safety . However, in accordance with generally accepted practices , the
GEOTECHNICAL PROFESSIONAL may report any observed job site safety violations
by others to the COUNTY .
SECTION XXI — CHOICE OF LAW AND VENUE
This Agreement shall be governed by the laws of the State of Florida . Venue for any
lawsuit brought by either party against the other party or otherwise arising out of this
Contract shall be in Indian River County, Florida , or in the event of a federal jurisdiction , in
the United States District Court for the Southern District of Florida .
SECTION — ENTIRETY OF AGREEMENT
This writing embodies the entire Agreement and understanding between the
parties hereto , and there are no other Agreements and understandings , oral or written ,
with reference to the subject matter hereof that are not merged herein and superseded
hereby. No alteration , change , or modification of the terms of this Agreement shall be
valid unless made in writing and signed by both parties hereto .
SECTION XXI11 - SEVERABILITY
If any provision , section , or paragraph of this agreement is determined by a court
of competent jurisdiction to be void , illegal , or unenforceable , the remaining portions not
found to be void , illegal , or unenforceable , shall remain in full force and effect.
7
C :\DOCUME~ l \WORKST� l \LOCALS� l \TEMPOR� 1 \7018 AGREEMENT-Dunkelberger Engineering.doc
IN WITNESS WHEREOF the parties hereto have executed these presents this
4th day of ,_ an „ ary X2005 .
DUNKELBERGER ENGINEERING & INDIAN RIVER COUNTY , FLORIDA
TESTING , INC . BOARD OF COUNTY COMMISSIONERS
BY .
- s .
04
Thomas S . Lowther , Chairman
Title : r1cw�. Pc� Board of County Commissioners
� ; Approved by the BCC : 01 - 04 - 2005
f
Vj
ATTEST :
Jeffrey . Bartot ,r
rk of the Ca ` . ° '
. d
' !
B
DEPUTY CLER
�i
tp
SEPH BAIRD
UNTY ADMINIS T
W � WILLIAM G . COLLINS , II
COUNTY ATTORNEY
8
C :\DOCUME~ 1 \WORKST� 1 \LOCALS~ l \TEMPORA \7018 AGREEMENT-Dunkelberger Engineering. doc
DUNKELBERGER ENG N TESTING, INC .
Indian River County
Geotechnical Services Fee Schedule
November 2004 through September 30, 2005
DE&T Project No . 1`04404602
I. SOIL TESTING
A. Standard or Modified Proctor (T99 or T180) $ 66 . 00/test
B . Field Density Test by the Sand-Cone Method (T191 ) $28 . 00/test
C . Field Density by the Drive- Sleeve Method (T204) $ 19 . 00/test
D . Field Density by the Nuclear Method (T238) (includes moisture
content determination, T239) $ 19 . 00/test
E . Moisture Content of In-Place Soil or Soil Aggregate by Nuclear
Methods (T239) (no charge when done in conjunction with T238) $ 8 . 00/test
F . Limerock Bearing Ratio (FM 5 - 515 ) (LBR) $ 246 . 00/test
G. Florida Bearing Value (FBV) $20 . 002/test
H . Sieve Analysis of Fine and Coarse Aggregates (T27) $ 66 . 00/test
I . Particle-size Analysis of Soil (T88) $44 . 00/test
J . Percent Finer than the U. S . No .200 Sieve (FM 1 -T 011 ) $ 22 . 00/test
K . Liquid Limit of Soils (T89) $44 . 00/test
L . Plastic Limit and Plasticity Index of Soils (T90) $44 . 00/test
M . Organic Content of Soils (T267) $22 . 00/test
N. Carbonates of Calcium and Magnesium (FM 5 -514) $ 52 . 00/test
O . Permeability of Granular Soils (Constant Head) (T125 ) $ 164 . 00/test
P . Unconsolidated, Undrained (UU) Compressive Strength of
Cohesive Soils in Trail Compression (T296) . $201 . 00/point
UE&T Page 1 of 7
EERING & TESTING, INC .
DUNKELBERGER ENGIN
Indian River County
Geotechnical Services Fee Schedule
November 2004 through September 30, 2005
DE &T Project No. P04404602
Q . Consolidated, Undrained (CU) Triaxial Compression Test on
Cohesive Soils (D4767) $ 386 . 00/point
R. Consolidation Testing of Undisturbed Sample (T216) $ 356 . 00/sample
S . Unconfined Compressive Strength of Cohesive Soil (undisturbed
sample) (D2166) $ 39 . 00/test
T . Unconfined Compressive Strength of Cohesive Soil (remolded
sample) (D2166) $ 60 . 00/test
U . Direct Shear Test of Soils Under Consolidated Drained Conditions
(D3080) $ 191 . 00/test
V. Soil Corrosivity (pH , sulfate, chloride, resistively) $ 131 . 00/test
II. CONCRETE TESTING
A . Compressive Strength of Cylindrical Concrete Specimens (T22) ;
includes one ( 1 ) slump test, molding, transporting, curing and
lab, testing (4 cylinders per set) $ 66 . 00/set
B . Flexural Strength of Concrete Using Simple Beam with 3rd-Point
Loading (T97) ; slump, molding, transporting, curing and testing
(3 beams per set) $ 73 . 00/set
C . Compressive Strength of Hydraulic Cement Mortar (T 106)
3 cubes per set) $ 50 . 00/set
D . Slump of Portland Cement Concrete (T119) $ 11 . 00/test
E . Air Content of Fresh Concrete by Volumetric Method (C173 ) $ 17 . 00/test
F . Unit Weight of Fresh Concrete (C138) $ 28 . 00/set
DE&T Page 2 of 7
EERING & TESTING, INC .
DUNKELBERGER ENGIN
Indian River County
Geotechnical Services Fee Schedule
November 2004 through September 30, 2005
DE&T Project No. PO4= 104602
G. Field Coring of Hardened Concrete (2 " or 4" diameter)
• Mobilization and Equipment Usage $ 10 . 00/day
• Field Coring - technician time, portal-to -portal ; $44 . 00/hour/
usually requires two technicians technician
Note: May also require utility notification, which is billed at a
Staff Engineer' s rate, and MOT (project specific requirement/costs) .
This task will be quoted on a project-by-project basis .
H . Compression Testing of Field Cores (C42) $ 22 . 00/core
I . Windsor Probe (minimum of 2 shots) (C803 ) $ 55 . 00/shot
J . Swiss Hammer (C805) and Pachometer Testing
• Equipment Usage $28 . 00/trip
• Senior Engineering Technician $44 . 00/hour
K. Compressive Strength of Masonry Prisms (C1314) (3 /set) $246 . 00/set
III. ASPHALT TESTING
A . Quantitative Extraction of Bitumen from Bituminous Paving
Mixture (T 164) $ 110 . 00/test
B . Stability Tests (Hubbard Field or Marshall) $ 99 . 00/test
C . Asphalt Thickness Determination (2 " or 4 " diameter)
• Mobilization and Equipment Usage $ 110 . 00/day
• Field Coring - technician time, portal-to-portal ; $44 . 00/hour/
usually requires two technicians technician
Note: May also require utility notification, which is billed at a
Staff Engineer's rate, and MOT (project specific requirement/costs) .
This task will be quoted on a project-by-project basis .
DE&7 Page 3 of 7
DUNKELBERGER ENGINEERING & TESTING, INC .
Indian River County
Geotechnical Services Fee Schedule
November 2004 through September 30, 2005
DE &T Project No. PO4- 10- 1602
D . Specific Gravity of Asphalt cores for Density Determination (T166) $ 17 . 00/core
IV. FIELD EXPLORATION WORK
A. Soil Investigation and Sampling by Auger Borings
See Item " D " below $ 8 . 00/foot
B . Penetration Test and Split-barrel Sampling of Soils (T206)
See Item " D " below 0' - 50' : $ 10 . 00/foot
50' - 75 ' : $ 12 . 00/foot
75 ' - 100' : $ 15 . 00/foot
C . Soil Investigation and Sampling by Hollow- Stem Auger
Boring (T251 ) - See Item " D " below 0' - 50' : $ 10 . 00/foot
D . Mobilization/demobilization of Truck-Mounted Drill
Rig - lump sum cost in addition to footage charges
shown above in Items "A" through " C " $ 191 . 00/event
E . SFWMD Constant/Falling Head Field Permeability Tests $ 328 . 00/test
F . Casing Installation (up to 4 " ID) 0' - 50' : $4 . 00/foot
50' - 75 ' : $ 5 . 00/foot
75 ' - 100' : $ 6 . 00/foot
G . Grout Seal Boreholes 0 - 50' : $4 . 00/foot
50' - 75 ' : $ 5 . 00/foot
75 , - 100' : $ 5 . 00/foot
H . Pressure Cleaning Drilling Tools
Steam Cleaner $ 137 . 00/day
• Rig Time $ 137 . 00/hour
1 . Cone Penetration Sounding $ 10 . 00/foot
J . Rock Coring (HQ Barrel) 0' - 50' : $ 29 . 00/foot
50' - 75 ' : $ 31 . 00/foot
75 ' - 100' : $ 33 . 00/foot
UE&I Page 4 of 7
DUNKELBERGER ENGINEERING & TESTING, INC .
Indian River County
Geotechnical Services Fee Schedule
November 2004 through September 30, 2005
DE &T Project No. P04404602
K . Thin-Walled Tub Samples (Shelby and Fixed Piston) $ 97 . 00/each
L . Groundwater Measurement and Sampling
1 . Shallow Piezometer (less than 12 feet) $ 18 . 00/lf
2 . Grouted Piezometer (2 inch diameter)
0 - 25 ft depths $26 . 00/lf
25 - 50 ft depths $29 . 00/lf
50 - 75 ft depths $ 36 . 00/lf
75 - 100 ft depths $ 39 . 00/lf
3 . Groundwater Monitoring Wells 2 " diameter
0 - 25 ft depths $ 31 . 00/lf
25 - 50 ft depths $ 34 . 00/lf
50 - 75 ft depths $41 . 00/lf
75 - 100 ft depths $ 51 . 00/lf
4 . Locking Protection Assembly (Riser) $ 196 . 00
5 . Locking Protection Assembly (flush mounted) $ 166 . 00
6 . Clear/Develop Wells for Sampling $ 137 . 00
7 . Sampling of Wells/Deliver to Water Quality Laboratory $ 55 . 00
M . Double-Ring Infiltration Test $ 382 . 00/test
N . Field Vane Shear Test $ 56 . 00/test,
Plus drilling costs
O . Drill Rig/Crew (2-man) Stand-by $ 137 . 00/hour
Note: This work usually requires utility notification and
engineering analysis . MOT may also be needed. This work
will be quoted on a project-by-project basis .
�E&T Page 5 of 7
DUNKELBERGER ENGINEERING & TESTING, INC .
Indian River County
Geotechnical Services Fee Schedule
November 2004 through September 30, 2005
DE&T Project No . P04404602
V. ENGINEERING SERVICES
A . Technician Inspection Services
• Engineering Technician $ 39 . 00/hour
• Senior Engineering Technician/Inspector $44 . 00/hour
B . Certified Building (Concrete/Steel) Inspection Services $ 55 . 00/hour
C . Clerical/Word Processing $ 39 . 00/hour
D . Computer Graphics $ 50 . 00/hour
E . Environmental Technician $ 55 . 00/hour
F . Staff Engineer $ 66 . 00/hour
G. Project Engineer $ 82 . 00/hour
H . Registered Professional Engineer $ 99 . 00/hour
I . Principal Engineer $ 115 . 00/hour
Notes .
1 . A minimum charge of $50 . 00 will be applied for field testing services such as in-place density
testing.
2 . Sample pickup time for laboratory tests will be billed at $43 . 60 per hour unless performed in
conjunction with other field testing services (in place density tests or concrete tests) services .
3 . Engineering technician time spent on concrete testing services will be billed at $38 . 15 per hour
for on- site standby time in excess of 1 hour per set, cylinder set pickup performed not in
conjunction with other field testing services, and cancellation without notice .
4 . Hourly rates are portal-to-portal.
5 . A minimum ofO . 5 hour of Registered Professional Engineer time will be charged per report .
6 . An overtime factor of 1 . 5 will be applied to the attached rates for work performed on weekends,
holidays, and outside the regular work week (7 : 30 a.m. to 5 : 00 p.m. Monday through Friday) .
7 . These fees do not include costs for maintenance-of-traffic (MOT) and/or utility locations which
may be required for certain jobs. These costs will be negotiated on an as-needed, case-by-case
basis.
7
DE&T Page 6 of 7
DUNKELBERGER ENGINEERING & TESTING, INC .
Indian River County
Geotechnical Services Fee Schedule
November 2004 through September 30, 2005
DE &T Project No. 1`0440= 1602
8 . The Field Exploratory Work costs are for land-based work using truck-mounted drilling
equipment only. Sites requiring all-terrain drilling equipment, clearing, and water-based work
will be quoted on a site specific basis .
9 . Third party charges and other out-of-pocket expenses will be billed at cost plus 12%.
DE&T Page 7 of 7