CONTRACT FOR CONSTRUCTION OF REQUIRED IMPROVEMENTS
NO . PD -01 -02 -04 -CFC (2000110011 -29265)
THIS MODIFICATION , made and entered into this day of
( d . , , 2003 , by and between GHA Harbor Pointe , Inc . , GHA Harbor
Links , Inc . , GHA Marina Village , Inc . , GHA Marina Village Tower I , Inc . , GHA
Marina Village Tower Il , Inc . , Grand Harbor Dockmaster, Inc . , all Florida
corporations and GHA Harbor, Ltd . , a Florida limited partnership ,
hereinafter referred to as " Developer" , and INDIAN RIVER COUNTY , a political
subdivision of the State of Florida , by and through its Board of County
Commissioners , hereinafter referred to as "County" .
WITNESSETH :
WHEREAS , Developer entered into a Contract for Construction of
Required Improvements No . PD -01 -02-04 -CFC (2000110011 -29265 )
guaranteeing the completion of certain required improvements on or before
January 30 , 2003 ; and
WHEREAS , certain of the required improvements are not completed as
outlined in Exhibit "A" attached hereto , and
WHEREAS , the Indian River County Code requires the developer to
construct required improvements , other than sidewalks , within one year from the
date of final plat approval ; and
WHEREAS , the final plat for Marina Village Site " B " — Grand Harbor Plat
25 was approved by the Board of County Commissioners of Indian River County
on July 23 , 2002 ; and
WHEREAS , Developer wishes to extend the contract date in which to
complete the remaining required improvements to July 22 , 2003 which is within
the 1 -year code requirement ; and
WHEREAS , the security in place cover the remaining improvements to be
constructed is cash , supported by a Cash Deposit and Escrow Agreement ,
NOW, THEREFORE , IN CONSIDERATION OF THE MUTUAL
COVENANTS AND PROMISES HEREIN CONTAINED , the parties agree as
follows :
1 . The date for completion of the remaining required improvements as
outlined in the Contract for Construction of Required Improvements No . PD -01 -
02 -04 -CFC (2000110011 -29265) is extended to July 22 , 2003 .
2 . The existing $ 90 , 839 . 32 cash held in escrow and supported by a
Cash Deposit and Escrow Agreement , representing 115 % of the remaining
required improvements to be completed , will remain in place .
3 . All other terms set out in the Contract for Construction of Required
Improvements No . PD =01 -02 -04 -CFC (2000110011 =29265 ) remain in full force
and effect .
IN WITNESS WHEREOF , the parties hereto have set their hands and
seals on the day and year first above written .
GHA HARBOR POINTE , INC . GHA HARBOR LINKS , INC .
DEVELOPER DEVELOPER
By r By P
Peter J . Henn , President Peter J . Henn , President
GHA MARINA VILLAGE , INC . GHA MARINA VILLAGE TOWER I ,
INC .
DEVELOPER DEVELOPER
B r By
Peter J . Henn , President Peter J . Henn , President
GHA MARINA VILLAGE TOWER GRAND HARBOR DOCKMASTER,
II , INC . INC .
FDEVELOPER . r 11 DEVELOPER
By By
Peter J . Henn , President Peter J . Henn , President
GHA HARBOR, LTD .
DEVELOPER
By GHA DEVELOPMENT , INC . ,
General Partner
BrY
Peter J . Henn , President
Office o agement a get
Date : t By .
Jason . Br wn , Budget Manager
2
INDIAN RIV R COUNTY , FLORIDA
By:
net R .Wlht . Chairman
Board of County Commissioners
ATTEST_;_Jeffrey K . Barto rk
� BCC Approved : February 18 , 2003
Deputy Clerk
APPROVED AS TO FORM
AND LEGAL SUFFICIENCY :
v a � ail
William G . Collins II
Deputy County Attorney
3
EXHIBIT "A "
PRE LEMENARY COST ESTIMATE
for uncompleted work within the limits of the plat for "Harbor Villages Phase V
I
Marina Village Site " B " at Grand Harbor, a Planned Residential Development" to
supporta Contract for Completion of Improvements
Description of Items
1 . Roadway asphalt (3/4 inches thick
6570 sy @ $ 3 . 75Isy $242637. 50
21 Street Lights 5 each
@ $ 1500 $ 7, 500 . 00
3 , Landscaping/Sod 2 Islands .@ @ $ 3 ,000 ea. $ 6, 000 . 00 ,
4 . Sidewalk 24255F elf : L'2.
5 . Curb @ $2 ' 25 $ 5 ,456 . 25
160 LF @ $7. 00 $ 1120 . 00
6 . Concrete Ramps ,: 1040SF
@ $ 17 . 40 $ 18 , 096 . 00
T Dumpster Pad 2 each @ $ 3750 . 00
$ 7, 500 . 00
8 . Striping (On 2nd Lift of Asphalt) IDS @ $ 1500 . 00
$ 1 , 500 . 00
Total :
$ 71 , 809 . 75
Engineering and Surveying ( 10%)
$.Z1 80 . 96
$ 78 , 990 . 71
Bond required ( 15 %)
. $ 11 . 848 . 61
Performance Bond Total
$ 90, 839 . 32
2002
Stephen E. Moler, P .E. , FL #33193
MASTELLER & MOLER, INC .
1