HomeMy WebLinkAbout2003-051 o -v � IMPLEMENTATION OF THE EAST INDIAN RIVER COUNTY MASTER STORMWATER MANAGEMENT PLAN : WORK ORDER No . 4 TO THE PROFESSIONAL ENGINEEERING SERVICES AGREEMENT BETWEEN CARTER ASSOCIATES, INC., AND INDIANRIVER COUNTY, FLORIDA FOR A PRELIMINARY ENGINEERING REPORT FOR VORTEX-TYPE TREATMENT UNITS AND FLOATING DEBRIS BOOMS IN THE MAIN RELIEF CANAL AND SOUTH RELIEF CANAL Pursuant to the Professional Engineering Services Agreement ( MASTER AGREEMENT ) dated May 8 , 2001 , by and between INDIAN RIVER COUNTY , a political subdivision of the State of Florida , hereinafter referred to as the COUNTY , and CARTER ASSOCIATES , INC . , Vero Beach , Florida , hereinafter referred to as the ENGINEER , this WORK ORDER No . 4 is an extension of and hereby becomes a part of the MASTER AGREEMENT as follows : SECTION 1 = PROJECT LIMITS AND DESCRIPTION In accordance with the East Indian River County Master Stormwater Management Plan ' s ( Master Plan ) recommended improvements and actions , WORK ORDER NO . 4 is for the preparation of a Preliminary Engineering Report for the feasibility of vortex-type stormwater treatment systems and floating boom systems as discussed in Alternatives No . 3 and 4 of the Master Plan . A vortex-type stormwater treatment system and a floating boom system will be considered at a selected location in the Main Relief Canal and at a selected location in the South Relief Canal . This Work is discussed in more detail in SECTION III — SCOPE OF SERVICES PROVIDED BY THE ENGINEER . SECTION II = COUNTY OBLIGATIONS A . The COUNTY will comment on the ENGINEER ' s work in a timely fashion . SECTION III - SCOPE OF SERVICES PROVIDED BY THE ENGINEER A. PROJECT ASSIGNMENTS The "design team " is collectively comprised of Carter Associates , Inc . and FAPublic Works\KeithM\Stc mwater Projects\East IRC\Contracts\Cmsultant Contract with Carter & Associates\Wcrk Order No. 4 - Vortex Treatment Units\Work Order #4 - Latest Version .doc 1 Environmental Consulting & Technology, Inc . Specific assignments follow : 1 . Carter Associates , Inc . ( CAI ) —CAI shall provide project quality control services . The following CAI personnel are required to work on this project : a . Dean F . Luethje , P . E . 2 . Environmental Consulting & Technology ( ECT ) — ECT shall provide all preliminary engineering design and related work . The following ECT personnel are required to work on this project : a . Frank E . Marshall , P . E . , Ph . D . b . Robert Naleway, P . E . C , Lora Saunders , Associate Scientist Be GENERAL The pollution prevention projects covered by this Work Order are intended to remove pollutants (suspended solids in particular and to a lesser extent , nutrients ) and floating material from the waters of the Main and South Relief Canals . The projects ' purpose is to protect the water quality of the Indian River Lagoon and thereby aid in restoring the Lagoon ' s seagrass coverage . The proposed vortex treatment structures shall be located as far downstream in the canals as practical . co ENGINEERING SERVICES Task 1 - Preliminary Engineering Report - Prepare a preliminary engineering report . This report will primarily focus on vortex-type stormwater pollution removal devices , but it will also include preliminary engineering designs of floating boom systems . The first focus of the report is to expand the original investigation and analysis of vortex systems that was performed for the Master Plan . In accordance with this , continue the original investigation in more detail and verify that vortex-type stormwater pollution removal devices are applicable and recommended for the proposed application . If this further investigation reconfirms that they are an appropriate and recommended pollution control application , then expand the preliminary engineering report to include , but not be limited to : recommend a manufacturer ( performance specifications will be written around this manufacturer in a future Work Order) ; perform field inspections of representative installations and collect data on pollutant removal efficiencies of existing systems ; investigate potential installation locations along the Main and South Relief Canals and recommend a location in each canal ; determine whether tilting weir gate structures should be constructed adjacent to the proposed vortex structures to provide operational head and to provide canal drawdown capabilities in anticipation of a major storm event ; investigate vacuum trucks and discuss the types of vacuum trucks that are capable of cleaning the vortex structures (and similar structures such as baffle boxes , catch basins , etc . ) and the capital and yearly operating costs of each truck ; investigate potential conflicts with existing utilities ; recommend a floating boom manufacturer (technical specifications will be written around this manufacturer in a future Work F:\Pubhc Works\KeithM\Sto.mwater ProjectsTast IRC\Contracts\Consultant Contract with Carter & Associates\Wak Order No. 4 - Vortex Treatment Units\Work Order #4 - Latest Version .doc 2 Order) ; provide a preliminary opinion of probable construction costs for the vortex units and floating booms , including yearly operation and maintenance costs ; determine probable pollutant removal efficiencies for the vortex devices ; and address safety concerns in the event that public access is provided to or near the treatment facilities for public education purposes . The preliminary engineering report shall discuss findings , calculations , costs , recommendations , cost/benefit analysis , etc . , and it shall include preliminary engineering drawings for the recommended installations . Additionally, investigate permitting requirements for installing the structures . Determine which agencies will have jurisdiction and discuss the proposed project with each of those agencies to determine their permitting requirements and design/construction constraints . Task 2 - Project Meetings - Meet with COUNTY and IRFWCD personnel as requested by the COUNTY at the County Administration Building or project site . As a minimum , the following meetings will be held : a . At least 3 coordination meetings to discuss the project and develop criteria to guide the Preliminary Engineering Report , and one or more meetings to review the Preliminary Engineering Report . b . Meet with local and state regulatory personnel as necessary to determine design constraints and to minimize final design efforts . SECTION IV = TIME FOR COMPLETION After the COUNTY issues a written authorization to proceed , sixty (60 ) calendar days shall be allowed for delivery of the completed work product to the COUNTY . SECTION V - COMPENSATION The COUNTY agrees to pay, and the ENGINEER agrees to accept , a fee for services rendered according to the "Scope of Services Provided by the ENGINEER , " identified in Section III of this WORK ORDER , with a maximum charge of $22 , 850 . 00 . This maximum fee is itemized as follows : TABLE V-1 — MAXIMUM COMPENSATION SCHEDULE Task Description ENGINEER' s Compensation 1 Preliminary En i eering Report $ 179850 . 00 2 Project Meetings $ 5 , 000 . 00 TOTAL MAXIMUM COMPENSATION $221850 . 00 FAPubfic Works\KeithM\Stamwater ProjectsTast IRC\Ccntracts\Cmsultant Contract with Carter & Associates\Work Order No. 4 - Vortex Treatment Units\Wcrk Order #4 - Latest Version.doc 3 SECTION VI = ADDITIONAL WORK Additional work shall be in accordance with the MASTER AGREEMENT . Additional work performed on a time and material basis shall not exceed the unit values listed in the following schedule . Lump sum fees for additional work shall be negotiated . TABLE VI - 1 — MAXIMUM UNIT PRICES FOR WORK PERFORMED ON A TIME AND MATERIAL BASIS ENGINEER I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 100 . 00/hr ENGINEER II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 85 . 00/hr ENGINEER III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 60 . 00/hr ENGINEER TECHNICIAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . . . . . . . . $ 50 . 00/hr BOTANIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 110 . 00/hr BIOLOGIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 110 . 00/hr PLANNER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 100 . 00/hr SENIOR SCIENTIST , " . . . . . . . . . . . . . . . . . . LANDSCAPE ARCHITECT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 100 . 00/hr SURVEYOR I ( Principal ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 100 . 00/hr SURVEYOR II ( Registered ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 65 . 00/hr SURVEYOR III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 55 . 00/hr SURVEY CREW (3- MAN ) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 90 . 00/hr CADD TECHNICIAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 50 . 00/hr DRAFTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 45 . 00/hr SECRETARY/WORD PROCESSOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 30 . 00/hr RESIDENT PROJECT REPRESENTATIVE , 35 . 00/hr GRAPHICS ASSISTANT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 25 . 00/hr RECORDING AND PERMIT FEES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost MATERIALS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost + 10 % TRAVEL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 0 . 29/Mile SUB - CONSULTANTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cost REIMBURSABLE EXPENSES : Postage , Long Distance Calls , Federal Express , Handouts for Public Meetings , etc , " I ' l " " I ' ll " " I ' le ' ll ' s " " Cost Blueprints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 . 00/sheet Mylars . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $4 . 00/sheet Xerox . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 0 . 15/page SECTION VII = PARTIAL PAYMENTS The COUNTY shall make monthly partial payments to the ENGINEER for all authorized work pertaining directly to this project performed during the previous calendar month . The ENGINEER shall use the form provided in "Attachment 1 , " herein . The ENGINEER shall submit invoices monthly for services performed and expenses incurred pursuant to this Agreement during the prior month . The ENGINEER shall submit duly certified invoices in duplicate to the Director of F:\Pubhc Works\KeithM\Stamwater Projects\East IRC\Contracts\Consultant Contract with Carter & Associates\Work Order No. 4 - Vortex Treatment Units\Work Order #4 - Latest Version.doc 4 , the Public Works Department . For lump sum line items , the amount submitted shall be the prorated amount due for all work performed to date under this phase , determined by applying the percentage of the work completed as certified by the ENGINEER , to the total due for this phase of the work . For time and material line items , the amount submitted shall be based on the actual hours worked and expenses incurred for the billing period . The amount of the partial payment due the ENGINEER for the work performed to date under these phases shall be an amount calculated in accordance with the previous paragraph , less ten percent ( 10 % ) of the invoice amount thus determined , which shall be withheld by the COUNTY as retainage , and less previous payments . Per F . S . 218 . 74 (2 ) , the COUNTY will pay approved invoices on or before the forty-fifth day after the COUNTY receives the ENGINEER' s invoice . Per F . S . 218 . 74 (2 ) , the ten percent ( 10 % ) retainage withheld shall be paid in full to the ENGINEER by the COUNTY , on or before the forty-fifth day after the date of final acceptance of the Work by the Public Works Director, The Agreement is broken into deliverable units . No payment shall be made unless the Public Works Director has received and approved the work products required under the " Scope of Services Provided by the ENGINEER , " herein . SECTION VIII = VENUE Venue for any lawsuit brought by either party against the other party or otherwise arising out of this Contract shall be in Indian River County, Florida , or, in the event of a federal jurisdiction , in the United States District Court for the Southern District of Florida . SECTION IX - RELATIONSHIP TO MASTER AGREEMENT AND LAWS OF FLORIDA All conditions set forth in the MASTER AGREEMENT shall control unless otherwise specified in this WORK ORDER . This WORK ORDER , regardless of where executed , shall be governed by and construed according to the laws of the State of Florida . ----------------------------------------------- [THE REMAINDER OF THIS PAGE WAS LEFT BLANK INTENTIONALLY] F:\Public Works\KeithM\Stcrmwater Projects\East IRC\Contracts\Consultant Contract with Carter & Associates\Wcrk Order No. 4 - Vortex Treatment Units\Work Order #4 - Latest Version .doc 5 IN WITNESS WHEREOF the parties hereto have executed these presents this nth day of March , 2003 . CARTER ASSOCIATES , INC . INDIAN RIVER COUNTY , FLORIDA 170821 ST STREET BOARD OF COUNTY COMMISSIONERS VER O ORID 96 BY : BY Dean F . Luethje , Vice Presi t K th R . Mac t , Ch irperson Witnessed by: Approved by BCC 03 / 04 / 2003 Attest : eyrraoa Jeffrey K . Barton , Clerk of Circuit Court De uty Cierk unt orney mes E . Chander, County Administrator Indian River County Approved RDateAdministration Budget County Attorne Risk Management Public Works Stormwater Engineering F:\Public Works\KeithM\Starmwater Projects\East IRC\Contracts\Cmsultant Contract with Carter & Associates\Wcrk Order No. 4 - Vortex Treatment Units\Work Order #4 - Latest Version.doc 6 ATTACHMENT 1 CONSULTANT ' S APPLICATION FOR PAYMENT NO . for WORK ORDER No . 4 To : INDIAN RIVER COUNTY PUBLIC WORKS DEPARTMENT Contract for WORK ORDER NO . 4 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT — INDIAN RIVER COUNTY — EAST INDIAN RIVER COUNTY MASTER STORMWATER MANAGEMENT PLAN — FOR A PRELIMINARY ENGINEERING REPORT FOR VORTEX-TYPE TREATMENT UNITS AND FLOATING DEBRIS BOOMS IN THE MAIN RELIEF CANAL AND SOUTH RELIEF CANAL . INDIAN RIVER COUNTY PROJECT No . 0113 For Work accomplished through the date of Percent Percent Gross Contract Complete Complete Contract Task Amount From This Pay Amount Due (2 ) Previous Request This Pay Pay (3 ) Request Requests 2 x 3 Task 1 — Preliminary Engineering Report $ 179850 . 00 Task 2 — Pro ' ect Meetin s $ 57000 . 00 , q TOTAL GROSS CONTRACT AMOUNT DUE THIS PAY REQUEST AMOUNT OF RETAINAGE ( 10 % of Total Gross Contract Amount Due This Pay Request) CONTRACT AMOUNT EARNED TO DATE (Total Gross Contract Amount Due This Pay Request minus Amount of Retaina e TOTAL AMOUNT PAID TO ENGINEER PRIOR TO THIS PAY ( ) REQUEST AMOUNT DUE THIS PAY REQUEST ( Contract Amount Earned To- Date minus Total Amount Paid To Engineer Prior To This Pay Request) F:\Public Works\KeithM\Stc mwater Projects\Fast IRC\Contracts\Cmsultant Contract with Carter & Associates\Wak Order No. 4 - Vortex Treatment Units\Wak Order #4 - Latest Version .doc 7 ATTACHMENT 1 CONSULTANT ' S APPLICATION FOR PAYMENT NO . for WORK ORDER No . 4 ENGINEER' S CERTIFICATION : THE UNDERSIGNED ENGINEER' S REPRESENTATIVE CERTIFIES that I have checked and verified the above Application for Payment No . and that to the best of my knowledge and belief, it is a true and correct statement of work performed and/or material supplied by the ENGINEER ; that all work and/or materials included in the Application for Payment have been inspected by me and/or by my duly authorized representative or assistants ; that it has been performed and/or supplied in full accordance with the requirements of the referenced Contract and with sound engineering practice and judgment ; and that the payment amount claimed and requested by the ENGINEER is correctly computed on the basis of work performed and/or materials supplied to date . THE UNDERSIGNED ENGINEER' S REPRESENTATIVE ALSO CERTIFIES that all previous progress payments received from the COUNTY on account of Work done under the Contract referred to above have been applied on account to discharge ENGINEER ' s legitimate obligations incurred in connection with Work covered by prior Applications for Payment numbered 1 through inclusive ; and if this is a Final Pay Request , I further certify that all persons doing work upon or furnishing materials or supplies for this project under this foregoing Contract have been paid in full . Dated ENGINEER : CARTER ASSOCIATES , INC . 1708 21 st Street Vero Beach , Florida 32960 ( 561 ) 5624191 ENGINEER' S REPRESENTATIVE : Name and Title : State of Florida . County of Indian River. Subscribed and sworn to before me this day of , 200 Notary Public My Commission expires : F:\Public Works\KeithM\Stmnwater Projects\East IRC\Contracts\Ccnsultant Contract with Carter & Associates\Wank Order No. 4 - Vortex Treatment Units\Wcrk Order #4 - Latest Version.doc 8