HomeMy WebLinkAbout2009-141 I 1 - 07
SHEET 1 OF 1
CHANGE ORDER NO . i
PROJECT : South RO WTP Improvements
DATE OF ISSUANCE May 2009 EFFECTIVE DATE
OWNER Indian River County Utilities
OWNER' S Contract No . UCP -2008027
CONTRACTOR Interstate Ens�ineering Corporation
You are directed to make the following changes in the Contract Documents :
Description : See attached breakdown
Reason for Change Order : See attached breakdown
Attachments : (List documents supporting change ; List of quotations and IEC proposals (3)
CHANGE IN CONTRACT PRICE : CHANGE IN CONTRACT TIMES :
Original Contract Price : Original Contract Times :
Substantial Completion: 180 ( 5 /4/09 )
$_ 75 , 813 . 61 Ready for Final Payment: 210 (6/3/09)
Net changes from Change Orders No . 0 to 1 Net changes from Change Orders No . 0 to 1
$ 0 0 (days)
Contract Price prior to this Change Order : Contract Times prior to this Change Order:
Substantial Completion 180
$ 894 . 600 . 00 Ready for Final Payment: 210
Net (Increase/Decrease) from this Change Order : Net (Increase/Decrease) from this Change Order :
$ 75 , 813 . 61 60 (days)
Contract Price w/ all Approved Change Orders : Contract Times w/ all Approved Change Orders :
Substantial Completion : 240 ( 7/ 17/09)
$ 9709413 . 61 Ready for Final Payment 270 ( 8/ 16/09)
RECOMM DE APPROY :D : 1 ACCEPTED :
By : B :CSC/
Y , — By :
Engineer (Authorized Signature) Ow` r` uthorize ature) Contractor (AuthorizeSignature)
West eyS i. `
avi s , 'Csh l awn
Date '3 ' O Date ;. M3 19 , 2009 ,j to
Date :
EJCDC No . 1910- 8 -B ( 1990 Edition)
Prepared by the Engineers Joint Contract Documents Committee and endorsed by the Associated General Contractors of America .
K :AWPB_Civil \044572017 - SRO Water Plant Improvements\Phase 11 Improvements\CONSTRUCTION\(C) Change Orders\Change Order # I . FRM .docx
Change Order # 1 - South RO Plant Improvements '
Quotation Descri tionReason for Chane Cost
Replace short 24 " DIP spool with Megaflange adapter to high service
pump suction header, cut and remove concrete pipe trench to allow spool Accelerated corrosion from zinc orhophosphate
injection in
4R replacement the pipe could cause sudden failure of suction piping to HSP $ 11, 888 . 36
Replace the two existing 14 " buried gate valves on storage tank effluent
pipes ( owner to furnish 14 " gate valves with actuators ), including Valve actuators are inoperable and require closure
to replace
7R excavation , compaction , and restoration the 24 " spool $ 10 79L60
Replace 16 " 316 stainless steel permeate piping, and restore sample lines Corrosion from acid injection has left the
pipe in poor
8 from permeate header condition, acid leaking on pipe $ 221868 . 31
Provide temporary location of HSP variable frequency drive to allow full
removal of existing MCC-2, including control wiring and temporary service Failure of MCC-2 has prevented phasing of MCC-2 installation
10R to VFD and subsequent requirement of the temporary use of VFD $ 8, 286 . 54
NETA testing of main switchgear, ATS, generator breaker, utility main # 1,
2, and 6, MCC-3 , and MCP, including infrared survey of contactors; Corrosion in electrical room warrants testing
of main
11 cleaning of corroded equipment listed herein , and test reports to owner components serving plant $ 21
, 978 80
$ 75 , 813 . 61