Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2007-100
tml, Document G701TM2001 Change Order PROJECT (Name and address): CHANGE ORDER NUMBER: 010 OWNER: Indian River County Jail Expansion DATE: March 20, 2007 ARCHITECT: 4055 41st Avenue Vero Beach, FL32960 CONTRACTOR: TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 04083 FIELD: ❑ Peter R. Brown CosnWction, Inc. CONTRACT DATE: June 07, 2005 1383058" Street North, Suite I CONTRACT FOR: General Construction OTHER: ❑ Clearwater, FL 33760 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previonsl) executed Construction Change Doectives) Add additional work of repaving the existing jail parking lot and the east/west connector roadway and repave the exercise yards as follows: AMOUNT Install one inch overlay of Type S-III asphalt on the existing parking lot and the ingress/egress road from the parking lot westerly to 41 " Avenue. Also resurface the two (2) existing exercise yards. Work includes striping, layout and new wheel stops. Remove and replace fence posts, gates, razor wire, etc. for access into the recreational yards for asphalt work. Remove and replace fence posts, gates, razor wire, etc. for access into the recreational yards for asphalt work. (Excludes access into east yard since that is already included in current scope of work.) $82,458.00 Man lift and replace or rework fencing, wire, post and concrete materials due to damage. $ 6, 100.00 Labor Burden and Sales Tax $ 2,023.00 TOTAL $90,581 .00 Acceptance of this proposed change order will not change the Guaranteed Maximum Price, but the Owner's Contingency will be reduced by $90,581 .00. The original to Guaranteed Maximum Price was $ 18,301 ,631 .00 The net change by previously authorized Change Orders $ (493,779.35 ) The Guaranteed Maximum Price prior to this Change Order was $ 17,807,851 .65 The Guaranteed Maximum Price will be increased/decreased by this Change Order in the amount of $ 0 The new Guaranteed Maximum Price including this Change Order will be $ 17,807,851 .65 The Contract Time will be unchanged by Zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is May 18, 2007 NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Clemons-Rutherford & Associaies,lnc. Peter R. Brown Construction, Inc. Indian River County Board of County Commissioners ARCHITECT (Firn ame) CONTRACTOR (Firm name) OWNER (1W n AJr,:n 2027 Tho sville Road, �ahassee, FI ] 3830 58'" Street North, S ite t 184 5'" Street Ve 'Beach 32960 08 learwater, FL 33760 4v� ADD ADDRESS '04ADORES - Z�V Signature) Sin rr BY (Signaiure) William D. Rutherford Eduardo T. Vargas Gary •C�ew�;,y','eP) Ga+r N (Type name (7)pedname) (Ii'Pe'A.aanp�� ii is DA DATE DATE (-"�— AIA Document G701T" - 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This Ale Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAa Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 18: 19 :30 on 04/03/2007 under Order No.1000250302 1 which expires an 725/2007, and is not for resale. User Notes: (2618778805) Change Order Request 4 Project N Indian River County Jail mmmPleter r Project is 6-2089 /����7��!✓''�� Dale: March 18, 2007 Irl , y 1/, y/ I r I Change Order Request Description: overlay asphalt parking lot, road and rec yards, PETER R. BROWN CONSTRUCTION, INC Labor Material Subcontract Equipment Cost UnilUnil Unit Unit Coda Description city a Unit Price Labor O s Unit Price Material Cry s I Unit Price Sub CITY s Unit Price Equip Tota ls Comments Install 1 inch overlay type S-III asphalt on the existing parking lot, ingress/egress road from the parking lot to the west out to 41st avenue and the 2 existing recreation yartls. Work includes Work performed per attached stripping, layout, and new wheel stops. 1 LS 79,578 79,578 79,578 Subcontractors proposal Remove and replace fencing, posts, gates, razor wire, and etcetera for access into the recreational yards for asphalt work. (Excludes access into east yard since already part of scope of work. 1 80 MH 36 2,880 2,880 Fencingf Wlre/Posts, Concrete material to replace/rework due to expected damage 1 LS 5.000 5,000 5.000 Man lift 2 each 550 1 , 100 1 , 100 Subtotals 2,880 5,000 79,578 1 ,100 $ 88,558.00 Labor Burden 0.58 1 .673 Work excludes removal or rework of existing asphalt and base. Work is to be for overlay only. Fence aprons "outside" recreation yards not included. New asphalt Sales Tax 0.07 350 will be approximately 1 Inch from existing fences. Excludes removal or adjustment of fencing, drains, manholes, area drains, or other existing items within scope of Subcontract Bonds 0.02 included work area, asphalt will be worked as closely to existing elevation directly adjacent to these structures. Work is to be performed simultaneously with current work Subtotal $ 90,581 ,28 contracted for the Jail Renovation and new construction. If not Construction Manager has option to include overhead and profit for this work. General Liability Insurance 0.01 - Work is to be funded by the Contractor's Contingency. Should additional Contractor Contingency be rquired the Owner will provide appropriate funding. Builders Risk Insurance - - By Owner Overhead and Profit 0. 10 - Performance and Payment Bond 0,01 TOTAL: $ 90,581 .28 Change Order Request 003 Asphalt parking Rec Yards.xls 1 of 1 _