Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2007-088
MIT NOWND � r � o ITT: GR GIN , L MAR 0 7 2007 ?J1- -; a ® WILITIES MANAGEMENT APPROVED BY WAR Document G701TM - 2001 = MAR r 3 2007 Change Order BOARD nOMMFCOUNTY SSf�N PROJECT (Name and address): CHANGE ORDER NUMBER: 008 OWNER: ® Indian River County Jail Expansion DATE: February 6, 2007 ARCHITECT: 4055 41 st Avenue -?3to CONTRACTOR: ® Vero Beach, FL32960 c ? Q t \ 5 TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 04083 FIELD'. ❑ Peter R. Brown Cosntruction, Inc. CONTRACT DATE: June 07, 2005 OTHER: ❑ 13830 58ih Street North, Suite I CONTRACT FOR: General Construction Clearwater, FL 33760 THE CONTRACT IS CHANGED AS FOLLOWS: (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) As per attached AIA Document G709 - 2001 Proposal Request Number 003, add additional work of installing roof replacement at Indian River County Jail Building C Housing Unit, install new roof at generator room and install new roof at gun towers as follows: AMOUNT Install modified roof system over existing lightweight insulating concrete deck attached per Metro Dade Approval ; removing existing root membrane, including a 15-year Johns Manville limited warranty; work includes 24-guage $ 15l ,300 galvanized coping reworking the existing counter-flashing, and install new drains & related flashing. $ 3,000 Install new roof at the generator room $ 3, Install new roof at gun lowers TOTAL: 5157,3,3 0 00 Acceptance of this proposed change order will increase the Guaranteed Maximum Price by $ 157,300. The original to Guaranteed Maximum Price was $ 18,301 ,631 .00 The net change by previously authorized Change Orders $ (22L6663 .9.9 3 ) The Guaranteed Maximum Price prior to this Change Order was $ 18,079,96 157,300.00 The Guaranteed Maximum Price will be increased by this Change Order in the amount of $ 18,237?63 .93 The new Guaranteed Maximum Price including this Change Order will be The Contract Time will be unchanged by Zero ( 0 ) days. The date of Substantial Completion as of the date of this Change Order therefore is May 18. 2007 NOTE: This Change Order does not include changes in the Contract Sum. Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. Clemons-Rutherford & Assoeiates,lnc. Peter R. Brown Construction, Inc. Indian River County Board of County ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) . 1 A32308 027 Thomasvill oad, Tallahassee, FI 13830 58'1 Street fth, Suit 1 1840 25`" �1�rCAtVero Bea60,IFC 3,2960 Clearwater, _ 70 DD 4Eduudo % ADDREZ •�,_ BY (Signature) amre) BY (Stg7ua ey _ T. Var as G C.' 17ee e>ti Chairin William D. Rutherfo (Typed m (Typed name (Typed na +ie) �' 1 z��$ ' 76 DATE DAT DATE AIA Document G701Tv - 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved- WARNING This AleDocument is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA Document, or any 1 portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 11 :24:23 on 02/07'2007 under Order No.1000250302_1 which expires on 712512007. and is not for resale. (2505677879) User Notes: Indian River County Staff Review Approval General Services Co. Admi istrator ' I X0 OMB 1 Ugal 73 14'Tfl: le, pROU'N L ()\N IIZU T41b. �� . . . I�I��AA�IA��AAAAAAr�t��0MOMMEME MEMMEMN �■�AAA�i�11�1 I����I����Ir����■�AAAAI�A�r�A- �� IAAAA����A���rr�Ir�AA�AA■�000000001 �� 1■�r��1�1AA��r�r1�AA�AA��■��l•�r�l- 1000 �� IAAAA����A�I���IA�AA�AArr�A■�■rrA����■1�1- �� IArAA�AA���1����1��AArAA�1�■�r��rrrr�A- �AA� IAAArr1A■/��A����I�AA�Ar��■����■�1- �AAA� IrAAA�Af1��A�■���I��AA��I��I��r�le IAAA�r��A�AAAAA�■��AAAAAAAr11��AA■A�r�rAA���AAA�r!♦1- �� 1■r�■�■rrAA��1����1���r�■111�I11�1��rAAAAA�1- �� I����I����I��r�lll�■��III��IIIr1- 01� IAAAA����IA����I����■��Ar�AAAA�r�1- 010000001 A����A�r��1��A��■11���1■r�r�1� IAA��■r■r��1AAAI�AA���1■����■A���AAAAAA�■�A- �� IAA����IA����I■����■���AAAAA�rr�t- �� I�1��1111111�IAAAA�AA��11fA�1�1�111fA��11�111I111111�AAA�■111111111f1�1- �� Ir�AA�AAAA��■�A�A�11111■�tAA�11��11�■If1�1��1111111�r111111�1��■■■1■� I���rA�l■���AA�I����I�I�AAAAAA��■IAAA�1� I��A�rrrr�l�r��A�1�A�1■■��I■■�A���rAr�l- �' IIIII�II�IIIIII��I11111.I1�I111fA♦AAII1111.11111�1���■�11��f11111�■1�1- �A� I�r��AA����1��AAAAAA��rAAAA�AAr��■�1- �� I��II�I111fA♦AAA�1�1111111■1�1111f111■�f111�1�fA11�f111111�■�A1�I11�1111f1�r�1- �� I1�AA��111111■�11111�1��11111111�1000011000�f1f1f111�■IIII�111���r�1� �� I�I�IIIIII�f111�A��1111■III�AA�IIII�II�AAAAAA�1�■fA��I111111�1111�r1�1� �� I1���111�I��111fI1�I1111fAAA�111f1��AAAAAAAAIA�■�AA���■�1� MO� I111���1111111�1111�1�111111f11�111111�11f11��1111f111�1�111■���111111■�III�A- �� I�AA���II��■��IrA1�Ar■1��■�AAAAIr��rr�A� �� I��rr■��1����1����■�AAAAI�fIfA�r�A� �� AAfA1��AA�1�1A���AAAAAAA�tAr11�sAAA�■Iw��1fAA11�r�A� A�■�A��IA�AA���IAA���AAAA�IilmollAAA�Arr��r�1- �AAAA� IAS■�rr��1�AA���IAAA���A�AMMOMMAIOR�AAAAAA�r�1- w S, OCT-26 - 2006 12 : 28 PM L W ROOF SYSTEMS 561 2St 0222 P . 01 Phone: (772) 220.5852 Fax: (172) 280.0222 is-ma0; IwmofsystemslncQbellsouih ,net db F 5 44305ECoa:MOMAvmur $jaart, Arida 34997 TO: Mr. Tristan Perlas Job Name: Indian River County Jail Address: Vero Beach, Florida Architect: Date: October 26, 2006 plana: We are pleased to submit an estimate on above named lob for the following: Furnish labor and materials to install a Johns Manville 4(FLD) modified roof system over the existing lightweight insulating conacte deck attached per Metro Dade Approval, A 15-year Johns Manville No Dollar Limit warranty will be provided, included items are cant strip, 24-gauge pea-finlshod galvanized coping with continuous wind cleat, rework the existing counter-flashing at the high wall areas, install new retro-fit drains, and all mot related flashing ).gots: To install the roof at the generator Croom Addt $ 31000.00 to the price below. To install a SV-Crimp metal roof at the gun towers Addr $ 320000 to the price below. L & W Roof Systems will provide a 2-year labor and materials warranty. Lump Sum Prtcer, ? 7SIJ00.00 F.xclua(ana: Woodnailers Curbs and Equipment Stands Lead Plumbing Flashing Pestis & PVC Drain Leaders Steel Framing & Hat Channels Exterior Caulking Kathy woeber Robert Bobo, Jr. Competency t:ard #CCGr327127 RECEIVED Bsdmator PETER BROWN DEC 05 2006 YELL-�` �90� ggi,E F "✓- INDIAN RIVER a.........._ . C s FIELD OFFICE