Loading...
HomeMy WebLinkAbout2004-187 �' - lo ,l c1 CHANGE ORDER No . 1 PROJECT Indian River County Landfill Gas Collection System Phase 1 DATE OF ISSUANCE EFFECTIVE DATE OWNER Indian River County Solid Waste Disposal District OWNER ' s Contract No . 5091 CDM Project No . 6706-33560-056 CONTRACTOR: ERC general Contracting Services, Inc . ENGINEER Camp Dresser & McKee Inc. You are directed to make the following changes in the Contract Documents : Description : Increase contract time by0 days Reason for change order: Electrical connection delay due to FP& L Attachments : ( List documents supporting change) Letter from ERC , Proof of Payment to FP& L CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price Original Contract Times $ 1 ,292, 600 . 00 Substantial Completion : 180 Ready for final payment : 240 Das or dates Net changes from previous Change Orders Net change from previous Change Orders No . to No . No. to No . $ 0 0 days Contract Price prior to this Change Order Contract Time prior to this Change Order $ 1 ,292, 600 . 00 Substantial Completion : 180 Ready for final payment : 240 Das or dates Net Increase (decrease) in this Change Order Net Increase in this Change Order $ 0 30 days Contract Price with all approved Change Orders Contract Time with all approved Change Orders $ 1929200 .00 Substantial Completion : 210 ( 8/26/04) early for final payment: 270 (9/26/04) a r� " Das or dates RECOMMEN D � V ACCEPTED : By: I �a y : Engi er (Authori d Signature) Oi rtuthoGed, " na't e) Contractor (Authorized Signature) Arthur. ,' �be, � � �/ i c Chairman Date : �S Date : Auqu�` ' 3 . X004 Date : G��u baa } EJCDC No . 1910-8 ( 1996 Edition ) Prepared by the Engineers Joint Contract Documents Committee and endorsed by,; Thh M.6 m "u General Contractors of America. ERC GENERAL CONTRACTING SERVICES , INC . Esc Carter CommerCenter 890 Carter Road , Suite 170 Winter Garden , Florida 34787 (407 ) 656-3900 • Fax (407 ) 656-2128 7- 12-04 Martin J . Lewis, P . E . CDM, Inc. 1701 Highway A- lA Suite 301 Vero Beach FL 32963 Re : Indian River County Landfill Gas Collection Phase 1 IRC Bid Number 5091 Change Order # 1 Dear Mr. Lewis : As you are well aware, Florida Power & Light still has not performed the electrical connection to the flare station not withstanding the guarantees and promises provided over the past months; these are circumstances beyond our control . We have no ability at this point to coerce them to do the work which has already has been prepaid by ERC more than a month ago . Therefore, the contract date must be extended in order to push back both substantial and final completion dates . At this time we have been delayed 45 days by FP& L, and at this point we do not trust any statements or schedules that they have given to us . In the event that this schedule continues to slide, we are also attaching a proposal from the electrician for placing a tefilporary power unit with clean conditioned power for the computer system . This will allow for the indefinite operation of the flare until this issue is resolved. Therefore , we are attaching a proposed change order for time extension for your review. The time extension requested is for 45 days. However, at this time it is very difficult to predict how long FP & L will take to do the work, since they have been promising this now for five months . If you have any questions please contact Jerry L . Pinder at (407) 468 - 1046 . Sincerely , rxy L . Pinder President KClose ONLINE IMAGE ACCOUNT NUMBER : 2090003068879 Check Number Amount Date Posted 55310 $722.00 06/11 /2004 ERC GENERAL CONTRACTING er. ""OW "• a+*w 55310 tC080 r: NW. SL SERWES, INC. C0WE4 AW, SUITE 170 a3 nLp�. WMER GOWN. `131T81 PAr Tor�1 ••722. 00 f"Eft or Flonda Powe �ht - - _ __ _ I $ Seven Hundred i!tnty-Two acrd 001700.. ••••••.•..• • .•••.••••. ••.••••.•••••••. .••• •••• ••••• •••••• Florida Power & Light P.O. Box 025576 . Miami , EL 33702 1•D 553iC�' I: D631075331: 2CRCDDiD68874p �DD0007220C�' l I I - � & 1 YYCarl " • 6 11 4 &1% ASri77 4 . ItIpsh1 M sooty 107 •RII V7i sa7� !IRIa / W' . . „f' n..rr ; , , . pl• • ►ce33a �y1a � . IW:-0ki► w s+:?3i 2As1 MAW r, W12rH 331. Print page How to save FAQs 4nvoice Customer Name and Address Customer Number: 132 EEc Invoice Number: ' : 890 CARTE STE 170 Invoice Date : 0610312004 ATTN@ JERRY VANTER CARDEN FL 3478701012JO0005996981017 ? 01 701 , 1 CURRENTPlease Retain This Portion for your Records i CREDITS DESCRIPTIONQUANTITY PRICE AMOUNT 00 722w00 1325 74TH AVE SW WR 1063433 SSS2-40 -482 For Inquiries Contact: Total Amount Due $ 722 , 00 HOLLYVICKY PHONE: Page I of I Florida Power & Light Company • Box 025576 Miami , FL 1 FPL GENERAL CONTRACTING SERVICES, INC. 55310 Florida Power & Light 6/8/2004 Date Po Reference Original Amt . Balance Due Discount Pavment 722 . 00 722 . 00 722 . 00 06 /03/20 Bill 599698 Check Amoun 722 . 00 722 . 00 First Union - Chec 61855-36585 503273' csroai CDMORIGINAL 1701 Highway A- 1 -A, Suite 301 Vero Beach , Florida 32963 tel : 772 231 -4301 fax: 772 231 -4332 July 22, 2004 Ms . Polly Kratman Managing Director Indian River County Solid Waste Disposal District 1325 74th Avenue SW Vero Beach, Florida 32968 Subject: Indian River County Landfill Landfill Gas Collection System Phase 1 Change Order Request No . 1 Dear Ms . Kratman: ERC General Contracting Services, Inc . has requested a 45 day extension in contract time with reference to scheduling problems with Florida Power and Light. We have reviewed their request. I recommend the contract be extended 30 days due to delays with FP&L which were beyond ERC' s control . The attached Change Order will be a no cost change, the substantial completion date will move from July 27, 2004 to August 26, 2004 . Final completion date will now be September 26, 2004 . I have attached the Change Order form and back-up documentation. If you have any questions, comments, or require any additional information, please let me know . VeryZturulyurs, M is, P . E . Senior Project Manager Camp Dresser & McKee Inc . File : 6706-33560-056 i cc : Tanhum Goldshmid, IRC John Ladner, CDM/ ORL Jerry Pinder, ERC mh1705.doc consulting • engineering • construction • operations